Back
ACT 100% confidence via regex

GAZETTE NOTICE NO. 8172

GAZETTE NOTICE NO. 8172

the Schedule of Tariffs 2018, notice is given that all prices for Electrical Energy specified in Part II -(A) of the said Schedule will be liable to a Water Resource Management Authority (WRMA) Levy of Plus 1.67 Cents per kWh for all meter readings taken in August, 2021. Information used to calculate the WRMA Levy: Approved WRMA levy for energy purchased from hydropower plants of capacity equal to or above 1MW =5.00 Kenya cents per KWh Hydropower Plant Units Purchased in July 2021 (kWh) Gitaru 55,884,000 Kamburu 28,701,000 Kiambere 75,407,000 Kindaruma 13,114,280 Masinga 15,048,650 Tana 6,920,470 Wanjii - Sagana 504,252 Turkwel 44,462,130 Gogo 438,240 Sondu Miriu 32,191,000 Sangoro 10,089,590 Regen-Terem 633,719 Chania 69,059 Gura 1,053,016 Metumi 769,450 Total units purchased from hydropower plants with capacity equal to or above 1MW = 285,285,856 kWh Total units generated and purchased (G) excluding exports in July, 2021 = 1,064,738025 kWh DANIEL K. BARGORIA, MR/1429011 Director-General. GAZETTE NOTICE Nia_73 , THE ENERGY ACT

ACT


PURSUANT to Clause 5 of Part III of the Schedule of Tariffs 2018, notice is given that all prices for Electrical Energy specified in Part II -(A) of the said Schedule will be liable to a Water Resource Management Authority (WRMA) Levy of Plus 1.67 Cents per kWh for all meter readings taken in August, 2021. Information used to calculate the WRMA Levy: Approved WRMA levy for energy purchased from hydropower plants of capacity equal to or above 1MW =5.00 Kenya cents per KWh Hydropower Plant Units Purchased in July 2021 (kWh) Gitaru 55,884,000 Kamburu 28,701,000 Kiambere 75,407,000 Kindaruma 13,114,280 Masinga 15,048,650 Tana 6,920,470 Wanjii - Sagana 504,252 Turkwel 44,462,130 Gogo 438,240 Sondu Miriu 32,191,000 Sangoro 10,089,590 Regen-Terem 633,719 Chania 69,059 Gura 1,053,016 Metumi 769,450 Total units purchased from hydropower plants with capacity equal to or above 1MW = 285,285,856 kWh Total units generated and purchased (G) excluding exports in July, 2021 = 1,064,738025 kWh DANIEL K. BARGORIA, MR/1429011 Director-General. GAZETTE NOTICE Nia_73 , THE ENERGY ACT (No. I of 2019) DECISION ON THE TARIFF APPLICATION FOR KUDURA POWER EAST AFRICA LIMITED PURSUANT to the provisions of section 11 (c) and section 163 (1) of the Energy Act, 2019, the Energy and Petroleum Regulatory Authority, notifies the general public that it has considered the tariff renewal application made by KUDURA Power East Africa Limited for the following mini- grid sites: Akadetawai, Buyende, Dirakho and Rukada, Makhuritsi, Mudoriko Bwiri A and Bwiri B, Mumbaka Mukhondo and Mugonga (MMM), Mufumu, Mukhwayo, Namagumba and Syamakhanga in Busia County, and approved applicable tariffs for a period of three (3) years with effect from the 1st August, 2021 as follows: Tariff Structure Energy Charge (KshslkWh) Connection Fees (KSh.) Domestic Consumer 72.33 6,500 Business Customer 68.73 6,500 Public Lighting 34.36 N/A DANIEL K. BARGORIA, PTG No. 225/21-22 Director-General. 13th August, 2021 THE KENYA GAZETTE

Dated the 13th August, 2021.

DANIEL K. BARGORIA,

PTG No. 225/21-22 Director-General.

Extracted Entities (1)

previous_gazette_ref

8172

Details

Act / Legislation
the Schedule of Tariffs 2018, notice is given that all prices for Electrical Energy specified in Part II -(A) of the said Schedule will be liable to a Water Resource Management Authority (WRMA) Levy of Plus 1.67 Cents per kWh for all meter readings taken in August, 2021. Information used to calculate the WRMA Levy: Approved WRMA levy for energy purchased from hydropower plants of capacity equal to or above 1MW =5.00 Kenya cents per KWh Hydropower Plant Units Purchased in July 2021 (kWh) Gitaru 55,884,000 Kamburu 28,701,000 Kiambere 75,407,000 Kindaruma 13,114,280 Masinga 15,048,650 Tana 6,920,470 Wanjii - Sagana 504,252 Turkwel 44,462,130 Gogo 438,240 Sondu Miriu 32,191,000 Sangoro 10,089,590 Regen-Terem 633,719 Chania 69,059 Gura 1,053,016 Metumi 769,450 Total units purchased from hydropower plants with capacity equal to or above 1MW = 285,285,856 kWh Total units generated and purchased (G) excluding exports in July, 2021 = 1,064,738025 kWh DANIEL K. BARGORIA, MR/1429011 Director-General. GAZETTE NOTICE Nia_73 , THE ENERGY ACT
Signed By
DANIEL K. BARGORIA
Title
PTG No. 225/21-22 Director-General
Date Signed
13th August 2021
Page
28
Extraction Method
regex