GAZETTE NOTICE NO. 2710
GAZETTE NOTICE NO. 2710
THE WATER ACT
(Cap. 372)
ESTABLISHMENT
under the powers granted by section 72 (1) (b) and (2) of the Water Act, 2016, has approved
the regular tariff adjustment for the area served by Nairobi City Water and Sewerage Company (NCWSC).
NCWSC applied to the Water Services Regulatory Board (WASREB) for a review of water services tariffs for the period 2025/2026 to
2028/2029 in line with section 72 (1) (b) of the Act. Public consultation on the NCWSC application was carried out as per the requirements of section
139 of the Water Act, 2016.
Having considered the application, the written and oral submissions by all stakeholders and the current data, WASREB has determined that an
upward tariff review is justified for NCWSC to improve service delivery, operate sustainably and protect consumer interests by meeting the tariff
conditions attached to the tariff.
WASREB hereby gives a one-month notice from the date of this communication to all existing and potential customers of NCWSC that the
structure of approved tariffs for water services for the four financial years 2025/2026, 2026/2027, 2027/2028 and 2028/2029 shall be as follows:
1.0 Approved Tariff Structure for the period 2025/2026 to 2028/2029
1.1 Water Tariff
Consumer Categories Consumption Block (m3) Approved Tariff (KSh./M3)
Domestic/Residential 1-6 68
7-20. 85
21-50 91
51-100 101
101-300 109
>300 117
Multi-Dwelling Units (MDU)/ Gated Communities Per M3 85
Commercial/Industrial 1-50 91
51-100 101
101-300 109
>300 117
Government/Institutions 1-50 91
51-100 101
101-300 109
>300 117
Public Schools, Colleges and Universities 1-600 78
601-1200 94
>1200m3 114
Unique Consumer Categories Bulk Water Supply to Other Public Utilities 46
Water Kiosk 44
Customers with non-functional meters shall be billed based on the average of the last three months’ bills.
1.2 Sewerage Tariff
1.2.1 Consumers with a Water Connection
(a) Sewerage will be charged at 75% of the water volumes, billed at the tariff for water specified (in 1.1) above for all customer categories.
Consumer Categories Consumption Block (75% of water consumed) (m3) Approved Tariff (KSh./M3)
Domestic/Residential 1-6 58
7-20. 65
21-50 73
51-100 81
101-300 85
>300 93
Multi-Dwelling Units (MDU)/ Gated Communities Per M3 65
Commercial/Industrial 1-50 73
51-100 81
101-300 85
>300 93
800 800
Consumer Categories Consumption Block (75% of water consumed) (m3) Approved Tariff (KSh./M3)
Government/Institutions 1-50 73
51-100 81
101-300 85
>300 93
Public Schools, Colleges and Universities 1-600 62
601-1200 75
>1200m3 91
Bulk Sewerage customers (From Public WSPs) Per M3 43
(b) Disconnected water accounts shall be charged based on the average of the last three months’ sewerage charges before the disconnection.
1.2.2 Customer with no water connection
Sewerage consumers without a water connection shall be charged as follows:
• Domestic customers without a metered source of water (Per Single dwelling unit): Ksh. 350 per month
• All other categories: 75% of the volume of water consumed as per the metered source of water including boreholes, at the rates specified
below.
Consumption Block (m3) Current Tariff (KSh./M3) Consumption Block (m3) Recommended Tariff (KSh./M3)
1-6 43 1-6 58
7-20. 56 7-20. 65
21-50 63 21-50 73
51-100 65 51-100 81
101-300 68 101-300 85
>300 72 >300 93
1.3 Indexation
The utility’s approved tariffs for water and sewerage shall be eligible for annual indexation, as per the regulations of the Water Services
Regulatory Board (WASREB). The inflation adjustment shall come into effect every July of the tariff period commencing July 2027.
1.4 Miscellaneous Charges
Item/ Service Charge (KSh.)
Water Deposit
Category of Consumer
Domestic 2500
Multi Dwelling Units (MDU - Small); 4-10 units 5,000
Multi Dwelling Units (MDU - Medium); 11-20 units 10,000
Multi Dwelling Units (MDU - Large); > 21 units 20,000
Retail shops less than 10m3 3000
Retail shops more than 10m3 3,500
Bar, restaurants less than 15 m3 4,000
Bar, restaurants more than 15 m3 6,000
Hotel less than 150 m3 12,000
Hotel more than 150 m3 15,000
Hospitals more than 150 m3 20,000
Health centres less than 150 m3 12,000
Schools less than 200 m3 10,000
Schools and other institutions more than 200 m3 20,000
Minor construction sites more than 200 m3 15,000
Major construction sites more than 300 m3 50,000
Light industries less than 200 m3 30,000
Medium industrial between 200 m3 and 300 m3 50,000
Heavy industries more than 300 m3 100,000
Water Kiosks 5,000
*Customers with only a sewer connection to be charged a deposit equivalent to a water connection
Other Charges
Service
New water connection fee 2,500
Water Reconnection fee – at meter point 1,000
Water Reconnection fee – at mains 5,000 and double deposit
Tanker – 8000, 16,000 litres 2,500, 5,000, respectively, per tanker within the WSP area for all
consumers
Sale of water Per M3 at Bowsing Point (own tanker) 85
Replacement of stolen or damaged meters 100% of the market cost of the meter
Meter testing on request 500
Leak detection services - non-customers 3,700 for Non-Customers and Free for Customers
Sewer Connection- Residential/ Domestic 2,500
Sewer Connection- Commercial, Government, schools, Universities and
Colleges
5,000
Sewer Connection- Industrial 15,000
Private sewer unblocking 5,000 for private and zero for public
27th February, 2026 THE KENYA GAZETTE
Item/ Service Charge (KSh.)
Sewer Reconnection fee (At mains) 15,000
For cutting off the supply at the request of the consumer 200
For turning on the supply otherwise than in respect of a first connection 200
Exhauster Services (Company Exhauster) 6,000 for other customers and 4,000 for informal settlements (within
the NCWSC service area)
Private Exhausters (Dumping into the company’s sewer system) 5,000 per Truck per month
Hiring of flushing unit services by private entities, including other WSPs 15,000 per hour
Sales of sludge 300 per ton
Dishonored payment 3,000 per Dishonoured payment
Polluter pays principle fees As per WASREB’s Sanitation Levy and Trade Effluent Guidelines
Penalties
Illegal water connection -Commercial, Industry, Construction (Fraud) 100,000 plus estimated consumption during the period of the
illegality
Illegal water connection (Fraud) – Domestic 30,000 plus estimated consumption during the period of the illegality
Overcharging (fraud) at the water kiosk 15,000
Illegal sewer connection- Commercial, Industry, Construction 100,000
Illegal sewer connection- Domestic, Government, Schools, Universities &
Colleges
30,000
Self-reconnection after being cut off for non-payment 5,000, and billing to be backdated from the date of cutoff
Surcharge for tampering with meters (this includes meter removal, reversing
of meter, etc)
5,000
Surcharge for direct suction of water from the supply line using a pump 10,000
2.0 Cost Structure
2.1 Cost Summary
Below is the summary of the recommended cost structure that makes up the total costs to be incurred by NCWSC during the tariff period:
Expenditure Item 2024/2025 2025/2026 2026/2027 2027/2028 2028/2029
Operations 10,892,433,548 11,479,919,982 12,559,333,169 12,918,150,298 13,379,573,837
Maintenance 334,689,489 532,905,148 563,500,405 596,025,426 630,616,697
Regulatory Levy 486,752,627 511,090,258 757,020,779 811,417,034 840,084,131
Total O&M Costs 11,713,875,664 12,523,915,388 13,879,854,354 14,325,592,758 14,850,274,664
Investment Costs 998,381,791 1,512,807,392 3,168,651,230 3,804,355,177 3,611,257,301
Debt Repayment 22,017,990 - 942,004,594 937,338,467 821,648,721
Total Costs 12,734,275,445 14,036,722,780 17,990,510,177 19,067,286,401 19,283,180,686
Total Billing (KSh.) 12,146,675,189 14,787,409,209 18,925,519,481 20,285,425,851 21,002,103,267
Collection Efficiency (%) 95% 95% 95% 95% 95%
Projected Revenue 11,539,341,430 14,048,038,749 17,979,243,507 19,271,154,558 19,951,998,104
O&M Cost Coverage 99% 112% 130% 135% 134%
Total Cost Coverage 91% 100% 100% 101% 103%
3.0 Conditions attached to the tariff approval.
The conditions attached to this approval, which shall form part of the license conditions of NCWSC, are:
3.1 Service Delivery Conditions attached to the tariff.
Target 2024/2025 2025/2026 2026/2027 2027/2028 2028/2029
Water Coverage (%) 79% 81% 83% 85% 87%
Sewerage Coverage (%) 52% 55% 58% 61% 64%
Water quality standards (%) 92% 100% Compliance with Standards
Personnel Expenditure as % of O&M 55% 55% 51% 51% 51%
Non-Revenue Water 54% 50% 47% 42% 39%
Hours of Supply (Hrs.) 9 10 11 11 12
Staff per 1000 connections 6 6 5 5 5
Metering ratio (%) 100% 100% 100% 100% 100%
Collection Efficiency (%) 95% 95% 95% 95% 95%
Resale at Kiosk Regulate resale by kiosk vendors at KSh. 4/= per 20 Litres Jerrycan at manned Kiosks, KSh. 2/= per 20 Litres
Jerrycan at ATM Water Dispenser. Tariffs at kiosks must be displayed at strategic points for public awareness
3.2 Other Conditions
3.2.1 Annual budgets
The WSP shall adhere to the budgetary levels set in the tariff.
3.2.2 Surpluses
The surpluses realised during the tariff period shall ONLY be used to implement priority service delivery capital projects approved by WASREB.
3.2.3 Repayment of Loans
NCWSC shall remit monthly loan repayments to AWWDA in accordance with the schedule detailed below:
Financing (KSh.) 2026/2027 2027/2028 2028/2029
AFD Loan CKE 3005 9,918,386 9,918,386 664,624
AFD Loan CKE 1049 on lent @ 2.3% 10,790,040 10,790,040 10,790,040
802 802
Financing (KSh.) 2026/2027 2027/2028 2028/2029
World Bank Loan IDA 4376 KE on lent @ 1.5% 36,870,547 36,870,547 36,870,547
AfDB Loan on lent @ 3% 20,921,410 20,532,566 20,145,516
Total 78,500,383 78,111,539 68,470,727
Evidence of loan repayment to AWWDA shall be submitted to WASREB monthly by the 10th day of the following month
3.2.4 Personnel Expenditure as a % of O&M
NCWSC to work towards sector benchmarks.
3.2.5 Customer re-categorization for billing
NCWSC shall bill all MDU / Gated communities at the Recommended MDU/ Gated Community tariff for Water, Sewerage, and other
Miscellaneous charges specified in this tariff.
3.2.6 Reporting
The utility shall submit quarterly performance reports to WASREB in the prescribed format.
3.2.7 Utilization of stakeholder budget fund activities outside the county, despite the approved tariff limits
NCWSC shall ensure that all stakeholders engagements are conducted locally and remain within the approved budget ceilings.
Management must ensure that funds intended for stakeholder activities are strictly confined to local engagements and that there is full
compliance with the tariff provisions going forward.
3.2.8 Regulatory Levy
The utility is to pay a monthly regulatory levy based on 4% of turnover, which is inclusive of billing for other services and interest income
earned.
3.2.9 Tariff Self-Assessment
WASREB will carry out a tariff implementation review within the first 12 months of approval and implementation, during which a joint
assessment with the utility on the trend in Billing (Ksh) shall be carried out, and the status of implementation of the tariff evaluated.
Additionally, an assessment will be carried out on the progress of the separation of the water and sewer cost centres and maintenance of
distinct records.
3.2.10 Investments
The utility shall undertake the investments in Table 1: -
4.0 Penalty Notice
4.1 Take note that failure of an Accounting Officer to administer this tariff and the conditions attached to it is an offence subject to section
196 (2) of the Public Finance Management Act 2012, 117 (1) (aa) of the County Governments Act 2012, Sections 147 and 158 of the
Water Act 2016, and Regulations 46 (1), 101 and 105 of the Water Services Regulations 2025.
4.2 Failure to comply with the tariff and conditions attached to it amounts to a breach of licence conditions and shall attract sanctions pursuant
to section 92 of the Water Act 2016, including:
(i) Payment of a penalty
(ii) Suspension or cancellation of the licence
(iii) Placement of the utility under Special Regulatory Regime
(iv) Prosecution.
Table 1- Recommended Investments for the Period 2025/2026 to 2028/2029
1. NRW Reduction Plan
(a) Pipe replacement
2025/2026
Pipe Replacement Areas
S/No. Description Unit Qty Unit Cost
(KSh)
Amount (KSh)
Rehabilitation / Upgrading of 39 Kms of aged network in South C and
Kilimani-Kileleshwa
1 Preliminary and General items Item 1 34,064,606 34,064,606
2 Measured Works
2.1 Setting Out and Ground Investigation M 39,000 128 4,976,400
Site Clearance M 39,000 128 4,976,400
2.2 Pipework’s (Replacing of Existing Old pipeline) ranging from (2" - 12") M 39,000 6,635 258,772,800
2.3 Fittings/ Appurtenance LS 25,877,280
2.4 Auxiliary Works/ Reinstatement works LS 7,763,184
2.5 Customer sensitization/ NRW Intervention measures inc. transfer of
connections
LS 1 38,280,000 38,280,000
Sub-Total 1 374,710,670
27th February, 2026 THE KENYA GAZETTE
2026/2027
Asbestos Pipe Replacement
No. Description Unit Qty Unit Cost
(KSh)
Amount (KSh)
Replacement of 75km of AC Pipes in Westland, Langata, and Dagoretti Regions
1 Preliminary and General items Item 1 61,975,320 61,975,320
2 Measured Works
2.1 Setting Out and Ground Investigation M 75,000 128 9,570,000
Site Clearance M 75,000 128 9,570,000
2.2 pipework (Replacing of Existing Old pipeline) ranging from (2" - 12") M 75,000 6,635 497,640,000
2.3 Fittings/ Appurtenance LS 49,764,000
2.4 Auxiliary Works/ Reinstatement works LS 14,929,200
2.5 Decommission existing pipeline and transport to a yard as directed by the Engineer in
Consultation with NEMA
LS 1 38,280,000 38,280,000
Sub-Total 1 681,728,520
2027/2028
Pipe Replacement Areas
No. Description Unit Qty Unit Cost
(KSh)
Amount (KSh)
Rehabilitation / Upgrading of 36 kms of aged network in Westland-Parklands and
Pangani-Ngara
1 Preliminary and General items Item 1 32,933,050 32,933,050
2 Measured Works
2.1 Setting Out and Ground Investigation M 36,000 128 4,593,600
Site Clearance M 36,000 128 4,593,600
2.2 pipework (Replacing of Existing Old pipeline) ranging from (2" - 12") M 36,000 6,635 238,867,200
2.3 Fittings/ Appurtenance LS 35,830,080
2.4 Auxiliary Works/ Reinstatement works LS 7,166,016
2.5 Customer sensitization/ NRW Intervention measures inc. transfer of connections LS 1 38,280,000 38,280,000
Sub-Total 1 362,263,546
2028/2029
Pipe Replacement Areas
S/No. Description Unit Qty Unit Cost
(KSh)
Amount
(KSh)
Rehabilitation / Upgrading of 32 kms of aged network in Eastleigh and Eastern Industrial
Area
1 Preliminary and General items Item 1 29,699,155 29,699,155
2 Measured Works
2.1 Setting Out and Ground Investigation M 32,000 128 4,083,200
Site Clearance M 32,000 128 4,083,200
2.2 Pipework’s (Replacing of Existing Old pipeline) ranging from (2" - 12") M 32,000 6,635 212,326,400
2.3 Fittings/ Appurtenance LS 31,848,960
2.4 Auxiliary Works/ Reinstatement works LS 6,369,792
2.5 Customer sensitization/ NRW Intervention measures inc. transfer of connections LS 1 38,280,000 38,280,000
Sub-Total 1 326,690,707
(b) Metering
Metering
Item Description Unit Quantity Rate (KSh.) Amount (KSh.) Implemen-
tation Year
2025/2026 2026/
2027/2028 2028/2029
1. HIGH CONSUMER, BULK DISTRIBUTION, BOUNDARY, AND ACCURACY
VERIFICATION METERS
A Smart Meters for High
Consumers (>100m3 per
month)
Supply and delivery of
battery-powered IP68
R800 U0D0 Ultrasonic
flow meters, complete
with real-time data
capture, analysis, and
transmission protocols
A1 DN 50 No. 500 214,500.00 107,250,000.00 107,250,000.00
A2 DN 75 No. 200 267,410.00 53,482,000.00 53,482,000.00
A3 DN 100 No. 150 277,415.16 41,612,274.00 41,612,274.00
A4 DN 150 No. 30 495,464.42 14,863,932.60 14,863,932.60
A5 DN 200 No. 10 617,929.80 6,179,297.96 6,179,297.96
804 804
Metering
Item Description Unit Quantity Rate (KSh.) Amount (KSh.) Implemen-
tation Year
2025/2026 2026/
2027/2028 2028/2029
B Inline Ultrasonic Flow
Meters Complete With
Ancillary Fittings For
Bulk And Distribution
Lines
FY 2025/26
-
Supply and delivery of
battery-operated inline
ultrasonic flow meters
with detached electronic
interface units and with
real-time data capture,
analysis, and
transmission protocols.
Each meter to be
supplied complete with
2 No. flange adapters,
rubber gaskets of equal
diameter to the meter,
stainless steel bolts, and
nuts. Meter sizes;
-
B1 DN 75 inline USFM No. 80 294,151.00 23,532,080.00 23,532,080.00
B2 DN 100 inline USFM No. 120 305,156.68 36,618,801.12 36,618,801.12
B3 DN 150 inline USFM No. 80 545,010.86 43,600,868.96 43,600,868.96
B4 DN 200 inline USFM No. 40 679,722.78 27,188,911.02 27,188,911.02
B5 DN 250 inline USFM No. 20 710,642.68 14,212,853.60 14,212,853.60
B6 DN 300 inline USFM No. 20 741,732.42 14,834,648.40 14,834,648.40
B7 DN 350 inline USFM No. 5 865,136.93 4,325,684.66 4,325,684.66
B8 DN 400 inline USFM No. 10 992,204.84 9,922,048.40 9,922,048.40
B9 DN 450 inline USFM No. 6 1,125,308.23 6,751,849.37 6,751,849.37
B10 DN 500 inline USFM No. 10 1,237,830.00 12,378,300.00 12,378,300.00
B11 DN 600 inline USFM No. 15 1,482,201.60 22,233,024.00 22,233,024.00
B12 DN 900 inline USFM No. 5 2,226,390.32 11,131,951.60 11,131,951.60
B13 DN 1000 inline USFM No. 5 2,480,498.06 12,402,490.32 12,402,490.32
-
C INSERTION
ELECTROMAGNETIC
FLOW METERS
COMPLETE WITH
REAL-TIME DATA
TRANSMISSION
PROTOCOLS
-
Supply and delivery of
medium-sized insertion
electromagnetic flow
meters (meter installable
on pipe size ranging
from DN 200 to DN
1500)
-
C1 Insertion Meters No. 10 1,084,600.00 10,846,000.00 10,846,000.00
D CLAMP-ON
ULTRASONIC FLOW
METERS (ASSORTED
PIPE SIZES
MEASUREMENT)
-
Supply and delivery of
ultrasonic clamp-on
meters with sensor range
DN 50 to DN 1000
-
D1 Clamp-on meters No. 10 1,339,800.00 13,398,000.00 13,398,000.00
Sub-Total 1 486,765,016.01 486,765,016.01 - - -
2. AGING METERS OVER THE PROPOSED TARIFF PERIOD
C NEW CUSTOMER
AND REPLACEMENT
OF
MALFUNCTIONING
CUSTOMER METERS
Supply and delivery of
R400 and above U0D0
Volumetric water meters
C1 DN 15 No. 98,332 5,958.07 585,868,873.69 FY 2026/27,
27/28 &
28/29
195,289,624.56 195,289,624.56 195,289,624.56
C2 DN 20 No. 1,876 7,739.37 14,519,049.37 4,839,683.12 4,839,683.12 4,839,683.12
C3 DN 25 No. 1,774 21,239.45 37,678,776.02 12,559,592.01 12,559,592.01 12,559,592.01
C4 DN 40 460 38,188.13 17,566,538.88 5,855,512.96 5,855,512.96 5,855,512.96
C5 DN 50 No. 359 42,702.62 15,330,239.14 5,110,079.71 5,110,079.71 5,110,079.71
D Supply, delivery, and - - -
27th February, 2026 THE KENYA GAZETTE
Metering
Item Description Unit Quantity Rate (KSh.) Amount (KSh.) Implemen-
tation Year
2025/2026 2026/
2027/2028 2028/2029
installation of prepaid
water dispensers
D1 PPDs No. 300 319,000.00 95,700,000.00 31,900,000.00 31,900,000.00 31,900,000.00
Sub-Total 2 766,663,477.10 - 255,554,492.37 255,554,492.37 255,554,492.37
3. CUSTOMER METER REPLACEMENT
E REPLACEMENT OF
MALFUNCTIONING
CUSTOMER METERS
Supply and delivery of
R400 and above U0D0
Volumetric water meters
E1 DN 15 No. 31,500 5,958.07 187,679,184.00 FY 2025/26,
26/27,27/28
& 28/29
46,919,796.00 46,919,796.00 46,919,796.00 46,919,796.00
E2 DN 20 No. 600 7,739.37 4,643,619.20 1,160,904.80 1,160,904.80 1,160,904.80 1,160,904.80
E3 DN 25 No. 570 21,239.45 12,106,483.84 3,026,620.96 3,026,620.96 3,026,620.96 3,026,620.96
E4 DN 40 No. 150 38,188.13 5,728,219.20 1,432,054.80 1,432,054.80 1,432,054.80 1,432,054.80
E5 DN 50 No. 120 42,702.62 5,124,313.92 1,281,078.48 1,281,078.48 1,281,078.48 1,281,078.48
Sub-Total 3 215,281,820.16 53,820,455.04 53,820,455.04 53,820,455.04 53,820,455.04
4. PRE-PAID WATER METERS
Supply and delivery of
R400 and above U0D0
Pre-paid Ultrasonic flow
water meters, including
real-time data
communication
protocols
E6 DN 15 No. 40,000 25,520.00 1,020,800,000 FY
2026/27,27/
28 & 28/29
340,266,666.67 340,266,666.67 340,266,666
Sub-Total 4 1,020,800,000 - 340,266,666.67 340,266,666.67 340,266,666
5. SMART METERS FOR PRODUCTION, RESERVOIRS, AND TRANSMISSION
OFFTAKES
SMART METERS FOR
PRODUCTION AND
RESERVOIRS
G Supply, delivery, and
installation of smart
meters for real-time data
capture, transmission,
and analysis of treated
water and inflow into
distribution volumes
No. 64.00 1,084,600 69,414,400.00 FY 2025/26 69,414,400.00
SMART METERS FOR
TRANSMISSION OFF
TAKES
-
H Install in-line R800 IP68
ultrasonic flow meters
for WSPs along Ngethu
and Sasumua
Transmission Mains,
Sizes DN 75 to DN 150
No. 60.00 346,763 20,805,792.48 20,805,792.48
Sub-Total 5 90,220,192.48 90,220,192.48 - - -
Sub-Total 6 2,579,730,505.75 630,805,663.53 649,641,614.07 649,641,614.07 649,641,614
(c) Other NRW reduction activities
Other NRW reduction activities
Item Description Unit Quantity Rate (KSh) Amount (KSh) Implementati
on Year
2025/2026 2026/2027 2027/2028 2028/2029
A ILLEGAL
CONNECTIONS
DISCONNECTION
A1 Identification,
disconnections, and/or
regularization of
illegal connections
through engagement
of NYS
No. 12,000 16,252.41 195,028,944 FY 2026/27
and 27/28
97,514,472 97,514,472
B AUTOMATIC TEST
BENCHES
B1 Procure a 2-line
automatic test bench
for DN 15 to DN 50
No. 1 95,700,000 95,700,000 FY 2025/26 95,700,000
806 806
Other NRW reduction activities
Item Description Unit Quantity Rate (KSh) Amount (KSh) Implementati
on Year
2025/2026 2026/2027 2027/2028 2028/2029
B2 Procure a 2-line
automatic test bench
for DN 75 to DN 300,
including expansion
of the existing test
bench shed
LS 1 191,400,000 191,400,000 FY 2027/28 191,400,000
Sub-Total 287,100,000 - 95,700,000 - 191,400,000 -
C METER
REINSTALLATION
C1 Right-sizing of
customer meters
30,000 6,380 191,400,000 FY
2026/27,27/2
8 & 28/29
63,800,000 63,800,000 63,800,000
D METER SEALING
D1 Procurement and
installation of
serialized meter seals
No. 250,000 765.60 191,400,000 FY 2025/26,
26/27,27/28
and 28/29
47,850,000 47,850,000.00 47,850,000 47,850,000
E DEPLOYMENT OF
IN-LINE PIPELINE
INSPECTION
DEVICE
E1 Procure and deploy an
in-line smart ball
pipeline inspection
device
No. 1 153,120,000 153,120,000 FY 2026/27 153,120,000
GRAND TOTAL 1,018,048,944 143,550,000 362,284,472 400,564,472 111,650,000
2. ICT PROJECT INVESTMENT
ICT Project Investment
No. Project & Sub
items
Unit Qty Unit Price 2025/2026 2026/2027 2027/2028 2028/2029 Total Amount
1 Modernization/Upgrade of ICT Data Centre equipment
Supply, Delivery,
and Installation of
Cisco Blade
Servers
No 20 4,500,000.00 - - 60,000,000.00 30,000,000.00 90,000,000.00
Supply, Delivery,
and Installation of
NetApp Storage
Controllers
No 6 5,000,000.00 - - 15,000,000.00 15,000,000.00 30,000,000.00
Supply and
Delivery of NetApp
Disk Shelves
No 4 5,000,000.00 - - 10,000,000.00 10,000,000.00 20,000,000.00
Supply and
Delivery of NetApp
Disks 2TB
No 100 150,000.00 - - 5,000,000.00 10,000,000.00 15,000,000.00
Virtualization
Software Licences -
VMware Support
and Licences
No 20 2,500,000.00 - - 25,000,000.00 25,000,000.00 50,000,000.00
Subtotal - - 115,000,000.00 90,000,000.00 205,000,000.00
2 Implementing lifecycle management for ICT hardware (Acquisition and
replacement of obsolete ICT Hardware PCs, laptops, printers)
Core i7 Laptops
1TB Storage 16GB
Memory
No 700 114,285.71 10,000,000.00 - 35,000,000.00 35,000,000.00 80,000,000.00
Core i7 Desktops _
Monitors, 1TB
Storage, 16GB
Memory
No 700 114,285.71 10,000,000.00 - 35,000,000.00 35,000,000.00 80,000,000.00
Kyocera
Multifunctional
Printers/Copiers
No 60 583,333.33 5,000,000.00 - 15,000,000.00 15,000,000.00 35,000,000.00
Sub Total 25,000,000.00 - 85,000,000.00 85,000,000.00 195,000,000.00
3 Upgrade of Data Center Fire Suppression and Smoke Detectors
Installation, testing,
and commissioning
of the full system -
cabling and
mechanical works
No 2 2,500,000.00 - - 5,000,000.00 - 5,000,000.00
27th February, 2026 THE KENYA GAZETTE
ICT Project Investment
No. Project & Sub
items
Unit Qty Unit Price 2025/2026 2026/2027 2027/2028 2028/2029 Total Amount
Supply and
installation of a
clean agent fire
suppression system
with cylinders,
nozzles, piping, and
control panel
No 2 2,500,000.00 - - 5,000,000.00 - 5,000,000.00
Smoke Detection
Apparatus
No 40 50,000.00 - - 2,000,000.00 - 2,000,000.00
Sub Total - - 12,000,000.00 - 12,000,000.00
4 ICT Security - Access controls and Monitoring tools
Installation,
configuration, and
Testing of Network
Access Control
Software
Project 1 5,000,000.00 - - - 5,000,000.00 5,000,000.00
Installation,
configuration and
Testing of a
Security
Information and
event management
tool
Project 1 2,000,000.00 - - - 2,000,000.00 2,000,000.00
High-definition
cameras for
monitoring entry
points and sensitive
ICT areas, with
NVR, storage, and
remote viewing
capabilities.
No 10 500,000.00 - - - 5,000,000.00 5,000,000.00
Supply and
installation of
biometric readers
(fingerprint/face
recognition), access
control panels, and
integrated card
readers at key ICT
entry points.
4 500,000.00 - - - 2,000,000.00 2,000,000.00
Sub Total - - - 14,000,000.00 14,000,000.00
5 Develop and implement a Data Warehouse and Business Intelligence System to enhance data mining, warehousing, visualization, and
reporting for improved decision-making.
Dashboard and
Visualization
Development
No 1 5,000,000.00 1,000,000.00 - 2,000,000.0
2,000,000.00 5,000,000.00
Data Cleansing and
Migration Services
No 1 2,000,000.00 1,000,000.00 - 1,000,000.0
- 2,000,000.00
User Access &
Security
Configuration
(Role-based Access
Controls)
No 1 4,000,000.00 - - 2,000,000.0
2,000,000.00 4,000,000.00
Integration with
Existing Systems
(ERP, Billing,
CRM, etc.)
No 1 4,000,000.00 - -
2,000,000.00 2,000,000.00 4,000,000.00
Training for Users,
Analysts, and
Admins
No 1 1,000,000.00 1,000,000.00 - - - 1,000,000.00
Support,
Maintenance &
Licensing
No 300 106,666.67 8,000,000.00 - 12,000,000.00 12,000,000.00 32,000,000.00
Sub Total 11,000,000.00 - 19,000,000.00 18,000,000.00 48,000,000.00
6 Acquisition and implementation of Unified Threat Management systems, monitoring tools, Threat intelligence platforms, and Zero Trust
Architecture on Data Center Infrastructure
808 808
ICT Project Investment
No. Project & Sub
items
Unit Qty Unit Price 2025/2026 2026/2027 2027/2028 2028/2029 Total Amount
Supply and
deployment of a
next-generation
firewall with UTM
features (IPS,
antivirus, web
filtering,
application control
(VPN).
No 1 10,000,000.00 5,000,000.00 - 5,000,000.00 - 10,000,000.00
Centralized log
collection, threat
correlation, real-
time alerting,
compliance
reporting
No 1 10,000,000.
5,000,000.00 - 5,000,000.00 - 10,000,000.00
Installation of a
Threat intelligence
Platform for
ingesting threat
feeds, automating
analysis, and
providing
actionable insights
for SOC operations.
No 1 15,000,000.00 5,000,000.00 - 10,000,000.00 - 15,000,000.00
Design and
deployment of Zero
Trust framework,
including identity-
based access
controls, micro-
segmentation,
MFA, and policy
enforcement.
No 1 15,000,000.
5,000,000.00 - 10,000,000.00 - 15,000,000.00
Licenses, software
updates, vendor
support, and threat
feed subscriptions.
No 1000 60,000.00 10,000,000.00 - 25,000,000.00 25,000,000.00 60,000,000.00
Sub Total 30,000,000.00 - 55,000,000.00 25,000,000.00 110,000,000.00
7 Replacement of Data centre Cooling system
Supply and
installation of
precision cooling
units for
temperature and
humidity control in
server room.
No 4 3,750,000.00 - - 15,000,000.00 - 15,000,000.00
Installation of
Ductwork, airflow
diffusers, grills, and
return air systems
to support proper
air circulation.
No 1 2,000,000.00 - - 2,000,000.00 - 2,000,000.00
Power cabling,
panels, a
changeover switch,
and UPS
integration to
support cooling unit
operation during
power outages.
No 1 2,000,000.00 - - 2,000,000.00 - 2,000,000.00
Full installation,
performance
testing,
commissioning, and
handover
documentation of
the cooling system.
No 1 2,000,000.00 - - 2,000,000.00 - 2,000,000.00
27th February, 2026 THE KENYA GAZETTE
ICT Project Investment
No. Project & Sub
items
Unit Qty Unit Price 2025/2026 2026/2027 2027/2028 2028/2029 Total Amount
Sub total - - 21,000,000.00 - 21,000,000.00
8 Acquisition of Audit Management System
Core license for a
web-based or
cloud-hosted audit
management
system with
modules for audit
planning,
checklists,
execution,
workflow, risk
assessment, and
reporting.
No 80 125,000.00 10,000,000.00 - 10,000,000.00 10,000,000.00 30,000,000.00
Customization -
Tailoring of the
system to align with
the organization’s
internal audit
process, risk
frameworks,
reporting formats,
and user roles.
No 1 3,000,000.00 3,000,000.00 - - - 3,000,000.00
API/interface
development to link
with ERP,
document
management
systems, HRMS, or
risk registers.
No 1 2,000,000.00 2,000,000.00 - - - 2,000,000.00
Deployment,
system testing,
training for auditors
and administrators,
and post-go-live
support
No 1 2,000,000.00 2,000,000.00 - - - 2,000,000.00
Sub Total 17,000,000.00 - 10,000,000.00 10,000,000.0
37,000,000.00
9 MAP kit System Licences
Supply and
installation of Map
Kit Licences
No 80 125,000.00 - - 10,000,000.00 10,000,000.0
20,000,000.00
Customization of
Layers
No 1 - - - - -
Sub Total - - 10,000,000.00 10,000,000.0
20,000,000.00
10 Deployment of Enterprise Onsite/Offsite and cloud backup systems
High-capacity NAS
or backup server
with RAID-
protected storage,
configured for
incremental and full
backups.
Proje
ct
1 10,000,000.00 10,000,000.00 - 20,000,000.00 10,000,000.00 40,000,000.00
Setup of a
secondary backup
server in a remote
location or DR site
with secure
replication from the
primary site.
1 10,000,000.00 10,000,000.00 - 10,000,000.00 - 20,000,000.00
Cloud-based
backup storage
subscription
100 100,000.00 5,000,000.00 - 10,000,000.00 10,000,000.00 25,000,000.00
Supply and
installation of
Enterprise-grade
backup software
100 100,000.00 5,000,000.00 - 10,000,000.00 10,000,000.00 25,000,000.00
810 810
ICT Project Investment
No. Project & Sub
items
Unit Qty Unit Price 2025/2026 2026/2027 2027/2028 2028/2029 Total Amount
Supply and delivery
of Switches, power
backup (UPS),
racks, surge
protection, and
cabling for all
backup hardware.
1 5,000,000.00 - - 15,000,000.00 5,000,000.00 20,000,000.00
Configuration of
Dashboard for real-
time backup status,
alerts,
success/failure logs,
retention policy
compliance, and
audit trail.
1 5,000,000.00 - - 5,000,000.00 5,000,000.00 10,000,000.00
Sub Total 30,000,000.00 - 70,000,000.00 40,000,000.00 140,000,000.00
11 Acquire, renew, and manage software licenses to ensure compliance with vendor agreements, cybersecurity regulations, and operational
requirements
Microsoft Office
Licences
No 1000 30,000.00 20,000,000.00 - 30,000,000.00 30,000,000.00 80,000,000.00
Microsoft Windows
Licences
No 1000 40,000.00 20,000,000.00 - 40,000,000.00 40,000,000.00 100,000,000.00
Microsoft Windows
Server Licences
No 150 200,000.00 15,000,000.00 - 30,000,000.00 30,000,000.00 75,000,000.00
Microsoft
Exchange Licences
No 3000 10,000.00 20,000,000.00 - 30,000,000.00 30,000,000.00 80,000,000.00
Antivirus End User
Device Licences
No 1000 15,000.00 15,000,000.00 - 15,000,000.00 15,000,000.00 45,000,000.00
Supply and
installation of
AutoCAD licenses
No 40 375,000.00 - - 15,000,000.00 15,000,000.00 30,000,000.00
Supply and
installation of
Water Flow
licences
No 40 375,000.00 - - 15,000,000.00 15,000,000.00 30,000,000.00
Oracle ERP
licences
400 75,000.00 20,000,000.00 - 30,000,000.00 30,000,000.00 80,000,000.00
Sub Total 110,000,000.00 - 205,000,000.00 205,000,000.00 520,000,000.00
12 Establishment of an I - Water hub and Excellence Centre
Facility renovation
(offices, labs,
HVAC, lighting)
Unit 1 10,000,000.
- - 10,000,000.00 - 10,000,000.00
ICT infrastructure
(LAN, Wi-Fi,
cabling)
Unit 1 5,000,000.0
- - 5,000,000.00 - 5,000,000.00
Server & data
intelligence
environment
No 1 10,000,000.
- - 5,000,000.00 5,000,000.00 10,000,000.00
Smart display &
collaboration tools
Unit 1 20,000,000.
- - 10,000,000.00 10,000,000.00 20,000,000.00
Lab setup – IoT, AI
& smart water tech
Unit 1 10,000,000.
- - 8,000,000.00 2,000,000.00 10,000,000.00
Branding &
knowledge resource
center
unit 1 2,000,000.0
- - 2,000,000.00 - 2,000,000.00
Sub Total - - 40,000,000.00 17,000,000.00 57,000,000.00
13 Solarization of Data Center Power System/UPS
Supply and
installation of high-
efficiency solar
photovoltaic panels
to generate clean
energy for data
center operations.
No 50 200,000.00 - - 10,000,000.00 - 10,000,000.00
Supply and
Installation of
Smart inverters to
convert DC to AC
and manage power
flow between solar,
grid, and
battery/UPS.
No 20 350,000.00 - - 7,000,000.00 - 7,000,000.00
27th February, 2026 THE KENYA GAZETTE
ICT Project Investment
No. Project & Sub
items
Unit Qty Unit Price 2025/2026 2026/2027 2027/2028 2028/2029 Total Amount
Supply and
installation of an
Energy storage
system (Battery
Bank) to provide
backup power and
buffer for solar
energy storage.
No 50 460,000.00 - - 15,000,000.00 8,000,000.00 23,000,000.00
Electrical Works
and Integration
Unit 1 5,000,000.00 - - 5,000,000.00 - 5,000,000.00
Installation, Testing
and Commissioning
Proje
ct
1 3,000,000.00 - - 3,000,000.00 - 3,000,000.00
Sub Total - - 40,000,000.00 8,000,000.00 48,000,000.00
14 Acquisition and implementation of analytics and AI systems in Leak detection and Monitoring.
Supply and
installation of IoT-
enabled pressure
sensors at key
nodes
No 2000 17,500.00 - - 20,000,000.00 15,000,000.00 35,000,000.00
Supply and
Installation of
Devices to collect
sensor data and
transmit securely
via GSM,
LoRaWAN, or NB-
IoT to the analytics
platform.
No 2000 17,500.00 - - 20,000,000.00 15,000,000.00 35,000,000.00
Supply and
Installation of on-
prem software to
process sensor data
using AI/ML for
anomaly detection,
leak localization,
and predictive
analytics.
No 1 20,000,000.00 - - 10,000,000.00 10,000,000.00 20,000,000.00
Design and
configuration of a
Real-time
visualization
platform with GIS
interface, alert
configuration, and
mobile
accessibility.
No 5 4,000,000.00 - - 10,000,000.00 10,000,000.00 20,000,000.00
Development of
interfaces/APIs to
connect leak
analytics with
existing systems
No 5 2,000,000.00 - - 5,000,000.00 5,000,000.00 10,000,000.00
Sub Total - - 65,000,000.00 55,000,000.00 120,000,000.00
15 Acquisition and implementation of additional ERP Modules. (Asset management/Maintenance, i-sourcing)
Customization and
Configuration of
the Modules
Proje
ct
1 10,000,000.00 - - 10,000,000.00 5,000,000.00 15,000,000.00
Oracle Licences for
the Modules
No 300 116,666.67 - - 35,000,000.00 35,000,000.00 70,000,000.00
Training No 300 33,333.33 - - 10,000,000.00 10,000,000.00 20,000,000.00
Sub Total - - 55,000,000.00 50,000,000.00 105,000,000.00
16 Acquisition and Implementation of Time and Attendance System, Biometric
Installation &
Configuration of
the Time &
Attendance System
Proje
ct
1 5,000,000.00 - - 5,000,000.00 - 5,000,000.00
Procurement of
Biometric Scanners
No 50 200,000.00 - - 10,000,000.00 - 10,000,000.00
Installation of the
biometric scanners
- cabling, electrical
works
No 1 5,000,000.00 - - 5,000,000.00 - 5,000,000.00
Integration with HR
system
Proje
ct
1 5,000,000.00 - - 5,000,000.00 - 5,000,000.00
Sub Total - - 25,000,000.00 - 25,000,000.00
812 812
ICT Project Investment
No. Project & Sub
items
Unit Qty Unit Price 2025/2026 2026/2027 2027/2028 2028/2029 Total Amount
Grand Total 223,000,000.00 - 827,000,000.00 627,000,000.00 1,677,000,000.00
3. Water Supply Management – (Extension of water pipeline in Mihangó, Utawala, Ruai and Kamulu (426 km))
a) Water Extension
Water Extension
No. Description Unit Qty Unit Cost
KSh
Amount (KSh) 2025/2026 2026/2027 2027/2028 2028/2029
Extension of water pipeline in
Mihangó, Utawala, Ruai & Kamulu
(426 km)
1 Preliminary and General items 1 127,600,000 127,600,000 63,800,000 63,800,000.00
2 Measured Works
2.1 Site clearance Ha 10 510,400 5,104,000 5,104,000.00
2.2 Site setting out M 426000 127.60 54,357,600 54,357,600.00
2.3 Trench excavation works m3 511200 765.60 391,374,720 391,374,720.00
2.4 Supply and installation of assorted
pipes (50mm Dia - 200mm Dia)
M 426000 3,190.00 1,358,940,000 364,250,383.41 497,344,808.29 497,344,808.29
2.5 Installation of appurtenances
(valves & valve chambers.
Item 1 13,589,400.
13,589,400 6,794,700.00 6,794,700.00
2.6 Surface Restoration: Reinstating
roads, pavements, or landscapes
disturbed during works.
m 426000 255.20 108,715,200 54,357,600.00 54,357,600.00
2.7 Testing and commissioning m 426000 127.60 54,357,600 27,178,800.00 27,178,800.00
2.8 Last Mile Connections Nr 10000 15,950.00 159,500,000 79,750,000.00 79,750,000.00
Total - Water Supply Management
– (Extension of water pipeline in
Mihangó, Utawala, Ruai &
Kamulu (426 km))
2,273,538,520 63,800,000 878,886,703.41 665,425,908.29 665,425,908.29
(d) Sewer Extension- Extension of sewer lines in Mihangó, Utawala & Ruai (100 km)
Sewer Extension
Description Unit Quantity Rate Amount 2025/2026 2026/2027 2027/2028 2028/2029
Extension of sewer lines in
Mihangó, Utawala & Ruai
(100 km)
1 Preliminary and General
items
Ls 1 153,120,000.00 153,120,000 76,560,000 76,560,000
2 Testing of Works m 100000 127.60 12,760,000 12,760,000
3 Site investigation Nr 1000 1,276.00 1,276,000 1,276,000
4 Demolition and Site
Clearance
m 11500 102.08 1,173,920 1,173,920
5 Excavation, laying of pipes
& Backfilling
(DN375&300mm) inclusive
of Installation of manholes
& Ancillaries
m 100000 19,140.00 1,914,000,000 517,100,000 698,450,000 698,450,000
7 Reinstatements Ls 1 19,140,000 19,140,000 9,570,000 9,570,000
8 Support and Protection Ls 1 19,140,000 19,140,000 9,570,000 9,570,000
10 Bedding and Haunching m 100000 1,914.00 191,400,000 95,700,000 95,700,000
11 Tie-in Works Ls 1 3,828,000 3,828,000 1,914,000 1,914,000
12 Last Mile Connections Nr 8000 21,054.00 168,432,000 84,216,000 84,216,000
Total- Sewer Extension-
Extension of sewer lines in
Mihangó, Utawala & Ruai
(100 km)
2,484,269,920 76,560,000 596,109,920 899,420,000 912,180,000
Dated the 12th February, 2026.
RICHARD CHERUIYOT,
MR/8099492 Ag. Chief Executive Officer, Water Services Regulatory Board.
27th February, 2026 THE KENYA GAZETTE
Dated the 12th February, 2026.
RICHARD CHERUIYOT,
Ag. Chief Executive Officer, Water Services Regulatory Board.
Extracted Entities (1)
previous_gazette_ref
2710
Details
- Act / Legislation
- THE WATER ACT
- Reference
- Cap. 372
- Section
- section 72 (1) (b)
- Signed By
- RICHARD CHERUIYOT
- Title
- Ag. Chief Executive Officer, Water Services Regulatory Board
- Date Signed
- 12th February 2026