Back
ESTABLISHMENT 100% confidence via regex

GAZETTE NOTICE NO. 2710

GAZETTE NOTICE NO. 2710

THE WATER ACT

(Cap. 372)

ESTABLISHMENT


under the powers granted by section 72 (1) (b) and (2) of the Water Act, 2016, has approved the regular tariff adjustment for the area served by Nairobi City Water and Sewerage Company (NCWSC). NCWSC applied to the Water Services Regulatory Board (WASREB) for a review of water services tariffs for the period 2025/2026 to 2028/2029 in line with section 72 (1) (b) of the Act. Public consultation on the NCWSC application was carried out as per the requirements of section 139 of the Water Act, 2016. Having considered the application, the written and oral submissions by all stakeholders and the current data, WASREB has determined that an upward tariff review is justified for NCWSC to improve service delivery, operate sustainably and protect consumer interests by meeting the tariff conditions attached to the tariff. WASREB hereby gives a one-month notice from the date of this communication to all existing and potential customers of NCWSC that the structure of approved tariffs for water services for the four financial years 2025/2026, 2026/2027, 2027/2028 and 2028/2029 shall be as follows: 1.0 Approved Tariff Structure for the period 2025/2026 to 2028/2029 1.1 Water Tariff Consumer Categories Consumption Block (m3) Approved Tariff (KSh./M3) Domestic/Residential 1-6 68 7-20. 85 21-50 91 51-100 101 101-300 109 >300 117 Multi-Dwelling Units (MDU)/ Gated Communities Per M3 85 Commercial/Industrial 1-50 91 51-100 101 101-300 109 >300 117 Government/Institutions 1-50 91 51-100 101 101-300 109 >300 117 Public Schools, Colleges and Universities 1-600 78 601-1200 94 >1200m3 114 Unique Consumer Categories Bulk Water Supply to Other Public Utilities 46 Water Kiosk 44 Customers with non-functional meters shall be billed based on the average of the last three months’ bills. 1.2 Sewerage Tariff 1.2.1 Consumers with a Water Connection (a) Sewerage will be charged at 75% of the water volumes, billed at the tariff for water specified (in 1.1) above for all customer categories. Consumer Categories Consumption Block (75% of water consumed) (m3) Approved Tariff (KSh./M3) Domestic/Residential 1-6 58 7-20. 65 21-50 73 51-100 81 101-300 85 >300 93 Multi-Dwelling Units (MDU)/ Gated Communities Per M3 65 Commercial/Industrial 1-50 73 51-100 81 101-300 85 >300 93 800 800 Consumer Categories Consumption Block (75% of water consumed) (m3) Approved Tariff (KSh./M3) Government/Institutions 1-50 73 51-100 81 101-300 85 >300 93 Public Schools, Colleges and Universities 1-600 62 601-1200 75 >1200m3 91 Bulk Sewerage customers (From Public WSPs) Per M3 43 (b) Disconnected water accounts shall be charged based on the average of the last three months’ sewerage charges before the disconnection. 1.2.2 Customer with no water connection Sewerage consumers without a water connection shall be charged as follows: • Domestic customers without a metered source of water (Per Single dwelling unit): Ksh. 350 per month • All other categories: 75% of the volume of water consumed as per the metered source of water including boreholes, at the rates specified below. Consumption Block (m3) Current Tariff (KSh./M3) Consumption Block (m3) Recommended Tariff (KSh./M3) 1-6 43 1-6 58 7-20. 56 7-20. 65 21-50 63 21-50 73 51-100 65 51-100 81 101-300 68 101-300 85 >300 72 >300 93 1.3 Indexation The utility’s approved tariffs for water and sewerage shall be eligible for annual indexation, as per the regulations of the Water Services Regulatory Board (WASREB). The inflation adjustment shall come into effect every July of the tariff period commencing July 2027. 1.4 Miscellaneous Charges  Item/ Service Charge (KSh.)  Water Deposit Category of Consumer Domestic 2500 Multi Dwelling Units (MDU - Small); 4-10 units 5,000 Multi Dwelling Units (MDU - Medium); 11-20 units 10,000 Multi Dwelling Units (MDU - Large); > 21 units 20,000 Retail shops less than 10m3 3000 Retail shops more than 10m3 3,500 Bar, restaurants less than 15 m3 4,000 Bar, restaurants more than 15 m3 6,000 Hotel less than 150 m3 12,000 Hotel more than 150 m3 15,000 Hospitals more than 150 m3  20,000 Health centres less than 150 m3 12,000 Schools less than 200 m3 10,000 Schools and other institutions more than 200 m3 20,000 Minor construction sites more than 200 m3 15,000 Major construction sites more than 300 m3 50,000 Light industries less than 200 m3 30,000 Medium industrial between 200 m3 and 300 m3 50,000 Heavy industries more than 300 m3 100,000 Water Kiosks 5,000 *Customers with only a sewer connection to be charged a deposit equivalent to a water connection Other Charges Service New water connection fee 2,500 Water Reconnection fee – at meter point 1,000 Water Reconnection fee – at mains 5,000 and double deposit Tanker – 8000, 16,000 litres 2,500, 5,000, respectively, per tanker within the WSP area for all consumers Sale of water Per M3 at Bowsing Point (own tanker) 85 Replacement of stolen or damaged meters 100% of the market cost of the meter Meter testing on request 500 Leak detection services - non-customers 3,700 for Non-Customers and Free for Customers Sewer Connection- Residential/ Domestic 2,500 Sewer Connection- Commercial, Government, schools, Universities and Colleges 5,000 Sewer Connection- Industrial 15,000 Private sewer unblocking 5,000 for private and zero for public 27th February, 2026 THE KENYA GAZETTE  Item/ Service Charge (KSh.)  Sewer Reconnection fee (At mains) 15,000 For cutting off the supply at the request of the consumer 200 For turning on the supply otherwise than in respect of a first connection 200 Exhauster Services (Company Exhauster) 6,000 for other customers and 4,000 for informal settlements (within the NCWSC service area) Private Exhausters (Dumping into the company’s sewer system) 5,000 per Truck per month Hiring of flushing unit services by private entities, including other WSPs 15,000 per hour Sales of sludge 300 per ton Dishonored payment 3,000 per Dishonoured payment Polluter pays principle fees As per WASREB’s Sanitation Levy and Trade Effluent Guidelines Penalties Illegal water connection -Commercial, Industry, Construction (Fraud) 100,000 plus estimated consumption during the period of the illegality Illegal water connection (Fraud) – Domestic 30,000 plus estimated consumption during the period of the illegality Overcharging (fraud) at the water kiosk 15,000 Illegal sewer connection- Commercial, Industry, Construction 100,000 Illegal sewer connection- Domestic, Government, Schools, Universities & Colleges 30,000 Self-reconnection after being cut off for non-payment 5,000, and billing to be backdated from the date of cutoff Surcharge for tampering with meters (this includes meter removal, reversing of meter, etc) 5,000 Surcharge for direct suction of water from the supply line using a pump 10,000 2.0 Cost Structure 2.1 Cost Summary Below is the summary of the recommended cost structure that makes up the total costs to be incurred by NCWSC during the tariff period: Expenditure Item 2024/2025 2025/2026 2026/2027 2027/2028 2028/2029 Operations 10,892,433,548 11,479,919,982 12,559,333,169 12,918,150,298 13,379,573,837 Maintenance 334,689,489 532,905,148 563,500,405 596,025,426 630,616,697 Regulatory Levy 486,752,627 511,090,258 757,020,779 811,417,034 840,084,131 Total O&M Costs 11,713,875,664 12,523,915,388 13,879,854,354 14,325,592,758 14,850,274,664 Investment Costs 998,381,791 1,512,807,392 3,168,651,230 3,804,355,177 3,611,257,301 Debt Repayment 22,017,990 - 942,004,594 937,338,467 821,648,721 Total Costs 12,734,275,445 14,036,722,780 17,990,510,177 19,067,286,401 19,283,180,686 Total Billing (KSh.) 12,146,675,189 14,787,409,209 18,925,519,481 20,285,425,851 21,002,103,267 Collection Efficiency (%) 95% 95% 95% 95% 95% Projected Revenue 11,539,341,430 14,048,038,749 17,979,243,507 19,271,154,558 19,951,998,104 O&M Cost Coverage 99% 112% 130% 135% 134% Total Cost Coverage 91% 100% 100% 101% 103% 3.0 Conditions attached to the tariff approval. The conditions attached to this approval, which shall form part of the license conditions of NCWSC, are: 3.1 Service Delivery Conditions attached to the tariff. Target 2024/2025 2025/2026 2026/2027 2027/2028 2028/2029 Water Coverage (%) 79% 81% 83% 85% 87% Sewerage Coverage (%) 52% 55% 58% 61% 64% Water quality standards (%) 92% 100% Compliance with Standards Personnel Expenditure as % of O&M 55% 55% 51% 51% 51% Non-Revenue Water 54% 50% 47% 42% 39% Hours of Supply (Hrs.) 9 10 11 11 12 Staff per 1000 connections 6 6 5 5 5 Metering ratio (%) 100% 100% 100% 100% 100% Collection Efficiency (%) 95% 95% 95% 95% 95% Resale at Kiosk Regulate resale by kiosk vendors at KSh. 4/= per 20 Litres Jerrycan at manned Kiosks, KSh. 2/= per 20 Litres Jerrycan at ATM Water Dispenser. Tariffs at kiosks must be displayed at strategic points for public awareness 3.2 Other Conditions 3.2.1 Annual budgets The WSP shall adhere to the budgetary levels set in the tariff. 3.2.2 Surpluses The surpluses realised during the tariff period shall ONLY be used to implement priority service delivery capital projects approved by WASREB. 3.2.3 Repayment of Loans NCWSC shall remit monthly loan repayments to AWWDA in accordance with the schedule detailed below: Financing (KSh.) 2026/2027 2027/2028 2028/2029 AFD Loan CKE 3005 9,918,386 9,918,386 664,624 AFD Loan CKE 1049 on lent @ 2.3% 10,790,040 10,790,040 10,790,040 802 802 Financing (KSh.) 2026/2027 2027/2028 2028/2029 World Bank Loan IDA 4376 KE on lent @ 1.5% 36,870,547 36,870,547 36,870,547 AfDB Loan on lent @ 3% 20,921,410 20,532,566 20,145,516 Total 78,500,383 78,111,539 68,470,727 Evidence of loan repayment to AWWDA shall be submitted to WASREB monthly by the 10th day of the following month 3.2.4 Personnel Expenditure as a % of O&M NCWSC to work towards sector benchmarks. 3.2.5 Customer re-categorization for billing NCWSC shall bill all MDU / Gated communities at the Recommended MDU/ Gated Community tariff for Water, Sewerage, and other Miscellaneous charges specified in this tariff. 3.2.6 Reporting The utility shall submit quarterly performance reports to WASREB in the prescribed format. 3.2.7 Utilization of stakeholder budget fund activities outside the county, despite the approved tariff limits NCWSC shall ensure that all stakeholders engagements are conducted locally and remain within the approved budget ceilings. Management must ensure that funds intended for stakeholder activities are strictly confined to local engagements and that there is full compliance with the tariff provisions going forward. 3.2.8 Regulatory Levy The utility is to pay a monthly regulatory levy based on 4% of turnover, which is inclusive of billing for other services and interest income earned. 3.2.9 Tariff Self-Assessment WASREB will carry out a tariff implementation review within the first 12 months of approval and implementation, during which a joint assessment with the utility on the trend in Billing (Ksh) shall be carried out, and the status of implementation of the tariff evaluated. Additionally, an assessment will be carried out on the progress of the separation of the water and sewer cost centres and maintenance of distinct records. 3.2.10 Investments The utility shall undertake the investments in Table 1: - 4.0 Penalty Notice 4.1 Take note that failure of an Accounting Officer to administer this tariff and the conditions attached to it is an offence subject to section 196 (2) of the Public Finance Management Act 2012, 117 (1) (aa) of the County Governments Act 2012, Sections 147 and 158 of the Water Act 2016, and Regulations 46 (1), 101 and 105 of the Water Services Regulations 2025. 4.2 Failure to comply with the tariff and conditions attached to it amounts to a breach of licence conditions and shall attract sanctions pursuant to section 92 of the Water Act 2016, including: (i) Payment of a penalty (ii) Suspension or cancellation of the licence (iii) Placement of the utility under Special Regulatory Regime (iv) Prosecution. Table 1- Recommended Investments for the Period 2025/2026 to 2028/2029 1. NRW Reduction Plan (a) Pipe replacement 2025/2026 Pipe Replacement Areas S/No. Description Unit Qty Unit Cost (KSh) Amount (KSh) Rehabilitation / Upgrading of 39 Kms of aged network in South C and Kilimani-Kileleshwa 1 Preliminary and General items Item 1 34,064,606 34,064,606 2 Measured Works 2.1 Setting Out and Ground Investigation M 39,000 128 4,976,400 Site Clearance M 39,000 128 4,976,400 2.2 Pipework’s (Replacing of Existing Old pipeline) ranging from (2" - 12") M 39,000 6,635 258,772,800 2.3 Fittings/ Appurtenance LS 25,877,280 2.4 Auxiliary Works/ Reinstatement works LS 7,763,184 2.5 Customer sensitization/ NRW Intervention measures inc. transfer of connections LS 1 38,280,000 38,280,000 Sub-Total 1 374,710,670 27th February, 2026 THE KENYA GAZETTE 2026/2027 Asbestos Pipe Replacement No. Description Unit Qty Unit Cost (KSh) Amount (KSh) Replacement of 75km of AC Pipes in Westland, Langata, and Dagoretti Regions 1 Preliminary and General items Item 1 61,975,320 61,975,320 2 Measured Works 2.1 Setting Out and Ground Investigation M 75,000 128 9,570,000 Site Clearance M 75,000 128 9,570,000 2.2 pipework (Replacing of Existing Old pipeline) ranging from (2" - 12") M 75,000 6,635 497,640,000 2.3 Fittings/ Appurtenance LS 49,764,000 2.4 Auxiliary Works/ Reinstatement works LS 14,929,200 2.5 Decommission existing pipeline and transport to a yard as directed by the Engineer in Consultation with NEMA LS 1 38,280,000 38,280,000 Sub-Total 1 681,728,520 2027/2028 Pipe Replacement Areas No. Description Unit Qty Unit Cost (KSh) Amount (KSh) Rehabilitation / Upgrading of 36 kms of aged network in Westland-Parklands and Pangani-Ngara 1 Preliminary and General items Item 1 32,933,050 32,933,050 2 Measured Works 2.1 Setting Out and Ground Investigation M 36,000 128 4,593,600 Site Clearance M 36,000 128 4,593,600 2.2 pipework (Replacing of Existing Old pipeline) ranging from (2" - 12") M 36,000 6,635 238,867,200 2.3 Fittings/ Appurtenance LS 35,830,080 2.4 Auxiliary Works/ Reinstatement works LS 7,166,016 2.5 Customer sensitization/ NRW Intervention measures inc. transfer of connections LS 1 38,280,000 38,280,000 Sub-Total 1 362,263,546 2028/2029 Pipe Replacement Areas S/No. Description Unit Qty Unit Cost (KSh) Amount (KSh) Rehabilitation / Upgrading of 32 kms of aged network in Eastleigh and Eastern Industrial Area 1 Preliminary and General items Item 1 29,699,155 29,699,155 2 Measured Works 2.1 Setting Out and Ground Investigation M 32,000 128 4,083,200 Site Clearance M 32,000 128 4,083,200 2.2 Pipework’s (Replacing of Existing Old pipeline) ranging from (2" - 12") M 32,000 6,635 212,326,400 2.3 Fittings/ Appurtenance LS 31,848,960 2.4 Auxiliary Works/ Reinstatement works LS 6,369,792 2.5 Customer sensitization/ NRW Intervention measures inc. transfer of connections LS 1 38,280,000 38,280,000 Sub-Total 1 326,690,707 (b) Metering Metering Item Description Unit Quantity Rate (KSh.) Amount (KSh.) Implemen- tation Year 2025/2026 2026/ 2027/2028 2028/2029 1. HIGH CONSUMER, BULK DISTRIBUTION, BOUNDARY, AND ACCURACY VERIFICATION METERS A Smart Meters for High Consumers (>100m3 per month) Supply and delivery of battery-powered IP68 R800 U0D0 Ultrasonic flow meters, complete with real-time data capture, analysis, and transmission protocols A1 DN 50 No. 500 214,500.00 107,250,000.00 107,250,000.00 A2 DN 75 No. 200 267,410.00 53,482,000.00 53,482,000.00 A3 DN 100 No. 150 277,415.16 41,612,274.00 41,612,274.00 A4 DN 150 No. 30 495,464.42 14,863,932.60 14,863,932.60 A5 DN 200 No. 10 617,929.80 6,179,297.96 6,179,297.96 804 804 Metering Item Description Unit Quantity Rate (KSh.) Amount (KSh.) Implemen- tation Year 2025/2026 2026/ 2027/2028 2028/2029 B Inline Ultrasonic Flow Meters Complete With Ancillary Fittings For Bulk And Distribution Lines FY 2025/26 - Supply and delivery of battery-operated inline ultrasonic flow meters with detached electronic interface units and with real-time data capture, analysis, and transmission protocols. Each meter to be supplied complete with 2 No. flange adapters, rubber gaskets of equal diameter to the meter, stainless steel bolts, and nuts. Meter sizes; - B1 DN 75 inline USFM No. 80 294,151.00 23,532,080.00 23,532,080.00 B2 DN 100 inline USFM No. 120 305,156.68 36,618,801.12 36,618,801.12 B3 DN 150 inline USFM No. 80 545,010.86 43,600,868.96 43,600,868.96 B4 DN 200 inline USFM No. 40 679,722.78 27,188,911.02 27,188,911.02 B5 DN 250 inline USFM No. 20 710,642.68 14,212,853.60 14,212,853.60 B6 DN 300 inline USFM No. 20 741,732.42 14,834,648.40 14,834,648.40 B7 DN 350 inline USFM No. 5 865,136.93 4,325,684.66 4,325,684.66 B8 DN 400 inline USFM No. 10 992,204.84 9,922,048.40 9,922,048.40 B9 DN 450 inline USFM No. 6 1,125,308.23 6,751,849.37 6,751,849.37 B10 DN 500 inline USFM No. 10 1,237,830.00 12,378,300.00 12,378,300.00 B11 DN 600 inline USFM No. 15 1,482,201.60 22,233,024.00 22,233,024.00 B12 DN 900 inline USFM No. 5 2,226,390.32 11,131,951.60 11,131,951.60 B13 DN 1000 inline USFM No. 5 2,480,498.06 12,402,490.32 12,402,490.32 - C INSERTION ELECTROMAGNETIC FLOW METERS COMPLETE WITH REAL-TIME DATA TRANSMISSION PROTOCOLS - Supply and delivery of medium-sized insertion electromagnetic flow meters (meter installable on pipe size ranging from DN 200 to DN 1500) - C1 Insertion Meters No. 10 1,084,600.00 10,846,000.00 10,846,000.00 D CLAMP-ON ULTRASONIC FLOW METERS (ASSORTED PIPE SIZES MEASUREMENT) - Supply and delivery of ultrasonic clamp-on meters with sensor range DN 50 to DN 1000 - D1 Clamp-on meters No. 10 1,339,800.00 13,398,000.00 13,398,000.00 Sub-Total 1 486,765,016.01 486,765,016.01 - - - 2. AGING METERS OVER THE PROPOSED TARIFF PERIOD C NEW CUSTOMER AND REPLACEMENT OF MALFUNCTIONING CUSTOMER METERS Supply and delivery of R400 and above U0D0 Volumetric water meters C1 DN 15 No. 98,332 5,958.07 585,868,873.69 FY 2026/27, 27/28 & 28/29 195,289,624.56 195,289,624.56 195,289,624.56 C2 DN 20 No. 1,876 7,739.37 14,519,049.37 4,839,683.12 4,839,683.12 4,839,683.12 C3 DN 25 No. 1,774 21,239.45 37,678,776.02 12,559,592.01 12,559,592.01 12,559,592.01 C4 DN 40 460 38,188.13 17,566,538.88 5,855,512.96 5,855,512.96 5,855,512.96 C5 DN 50 No. 359 42,702.62 15,330,239.14 5,110,079.71 5,110,079.71 5,110,079.71 D Supply, delivery, and - - - 27th February, 2026 THE KENYA GAZETTE Metering Item Description Unit Quantity Rate (KSh.) Amount (KSh.) Implemen- tation Year 2025/2026 2026/ 2027/2028 2028/2029 installation of prepaid water dispensers D1 PPDs No. 300 319,000.00 95,700,000.00 31,900,000.00 31,900,000.00 31,900,000.00 Sub-Total 2 766,663,477.10 - 255,554,492.37 255,554,492.37 255,554,492.37 3. CUSTOMER METER REPLACEMENT E REPLACEMENT OF MALFUNCTIONING CUSTOMER METERS Supply and delivery of R400 and above U0D0 Volumetric water meters E1 DN 15 No. 31,500 5,958.07 187,679,184.00 FY 2025/26, 26/27,27/28 & 28/29 46,919,796.00 46,919,796.00 46,919,796.00 46,919,796.00 E2 DN 20 No. 600 7,739.37 4,643,619.20 1,160,904.80 1,160,904.80 1,160,904.80 1,160,904.80 E3 DN 25 No. 570 21,239.45 12,106,483.84 3,026,620.96 3,026,620.96 3,026,620.96 3,026,620.96 E4 DN 40 No. 150 38,188.13 5,728,219.20 1,432,054.80 1,432,054.80 1,432,054.80 1,432,054.80 E5 DN 50 No. 120 42,702.62 5,124,313.92 1,281,078.48 1,281,078.48 1,281,078.48 1,281,078.48 Sub-Total 3 215,281,820.16 53,820,455.04 53,820,455.04 53,820,455.04 53,820,455.04 4. PRE-PAID WATER METERS Supply and delivery of R400 and above U0D0 Pre-paid Ultrasonic flow water meters, including real-time data communication protocols E6 DN 15 No. 40,000 25,520.00 1,020,800,000 FY 2026/27,27/ 28 & 28/29 340,266,666.67 340,266,666.67 340,266,666 Sub-Total 4 1,020,800,000 - 340,266,666.67 340,266,666.67 340,266,666 5. SMART METERS FOR PRODUCTION, RESERVOIRS, AND TRANSMISSION OFFTAKES SMART METERS FOR PRODUCTION AND RESERVOIRS G Supply, delivery, and installation of smart meters for real-time data capture, transmission, and analysis of treated water and inflow into distribution volumes No. 64.00 1,084,600 69,414,400.00 FY 2025/26 69,414,400.00 SMART METERS FOR TRANSMISSION OFF TAKES - H Install in-line R800 IP68 ultrasonic flow meters for WSPs along Ngethu and Sasumua Transmission Mains, Sizes DN 75 to DN 150 No. 60.00 346,763 20,805,792.48 20,805,792.48 Sub-Total 5 90,220,192.48 90,220,192.48 - - - Sub-Total 6 2,579,730,505.75 630,805,663.53 649,641,614.07 649,641,614.07 649,641,614 (c) Other NRW reduction activities Other NRW reduction activities Item Description Unit Quantity Rate (KSh) Amount (KSh) Implementati on Year 2025/2026 2026/2027 2027/2028 2028/2029 A ILLEGAL CONNECTIONS DISCONNECTION A1 Identification, disconnections, and/or regularization of illegal connections through engagement of NYS No. 12,000 16,252.41 195,028,944 FY 2026/27 and 27/28 97,514,472 97,514,472 B AUTOMATIC TEST BENCHES B1 Procure a 2-line automatic test bench for DN 15 to DN 50 No. 1 95,700,000 95,700,000 FY 2025/26 95,700,000 806 806 Other NRW reduction activities Item Description Unit Quantity Rate (KSh) Amount (KSh) Implementati on Year 2025/2026 2026/2027 2027/2028 2028/2029 B2 Procure a 2-line automatic test bench for DN 75 to DN 300, including expansion of the existing test bench shed LS 1 191,400,000 191,400,000 FY 2027/28 191,400,000 Sub-Total 287,100,000 - 95,700,000 - 191,400,000 - C METER REINSTALLATION C1 Right-sizing of customer meters 30,000 6,380 191,400,000 FY 2026/27,27/2 8 & 28/29 63,800,000 63,800,000 63,800,000 D METER SEALING D1 Procurement and installation of serialized meter seals No. 250,000 765.60 191,400,000 FY 2025/26, 26/27,27/28 and 28/29 47,850,000 47,850,000.00 47,850,000 47,850,000 E DEPLOYMENT OF IN-LINE PIPELINE INSPECTION DEVICE E1 Procure and deploy an in-line smart ball pipeline inspection device No. 1 153,120,000 153,120,000 FY 2026/27 153,120,000 GRAND TOTAL 1,018,048,944 143,550,000 362,284,472 400,564,472 111,650,000 2. ICT PROJECT INVESTMENT ICT Project Investment No. Project & Sub items Unit Qty Unit Price 2025/2026 2026/2027 2027/2028 2028/2029 Total Amount 1 Modernization/Upgrade of ICT Data Centre equipment Supply, Delivery, and Installation of Cisco Blade Servers No 20 4,500,000.00 - - 60,000,000.00 30,000,000.00 90,000,000.00 Supply, Delivery, and Installation of NetApp Storage Controllers No 6 5,000,000.00 - - 15,000,000.00 15,000,000.00 30,000,000.00 Supply and Delivery of NetApp Disk Shelves No 4 5,000,000.00 - - 10,000,000.00 10,000,000.00 20,000,000.00 Supply and Delivery of NetApp Disks 2TB No 100 150,000.00 - - 5,000,000.00 10,000,000.00 15,000,000.00 Virtualization Software Licences - VMware Support and Licences No 20 2,500,000.00 - - 25,000,000.00 25,000,000.00 50,000,000.00 Subtotal - - 115,000,000.00 90,000,000.00 205,000,000.00 2 Implementing lifecycle management for ICT hardware (Acquisition and replacement of obsolete ICT Hardware PCs, laptops, printers) Core i7 Laptops 1TB Storage 16GB Memory No 700 114,285.71 10,000,000.00 - 35,000,000.00 35,000,000.00 80,000,000.00 Core i7 Desktops _ Monitors, 1TB Storage, 16GB Memory No 700 114,285.71 10,000,000.00 - 35,000,000.00 35,000,000.00 80,000,000.00 Kyocera Multifunctional Printers/Copiers No 60 583,333.33 5,000,000.00 - 15,000,000.00 15,000,000.00 35,000,000.00 Sub Total 25,000,000.00 - 85,000,000.00 85,000,000.00 195,000,000.00 3 Upgrade of Data Center Fire Suppression and Smoke Detectors Installation, testing, and commissioning of the full system - cabling and mechanical works No 2 2,500,000.00 - - 5,000,000.00 - 5,000,000.00 27th February, 2026 THE KENYA GAZETTE ICT Project Investment No. Project & Sub items Unit Qty Unit Price 2025/2026 2026/2027 2027/2028 2028/2029 Total Amount Supply and installation of a clean agent fire suppression system with cylinders, nozzles, piping, and control panel No 2 2,500,000.00 - - 5,000,000.00 - 5,000,000.00 Smoke Detection Apparatus No 40 50,000.00 - - 2,000,000.00 - 2,000,000.00 Sub Total - - 12,000,000.00 - 12,000,000.00 4 ICT Security - Access controls and Monitoring tools Installation, configuration, and Testing of Network Access Control Software Project 1 5,000,000.00 - - - 5,000,000.00 5,000,000.00 Installation, configuration and Testing of a Security Information and event management tool Project 1 2,000,000.00 - - - 2,000,000.00 2,000,000.00 High-definition cameras for monitoring entry points and sensitive ICT areas, with NVR, storage, and remote viewing capabilities. No 10 500,000.00 - - - 5,000,000.00 5,000,000.00 Supply and installation of biometric readers (fingerprint/face recognition), access control panels, and integrated card readers at key ICT entry points. 4 500,000.00 - - - 2,000,000.00 2,000,000.00 Sub Total - - - 14,000,000.00 14,000,000.00 5 Develop and implement a Data Warehouse and Business Intelligence System to enhance data mining, warehousing, visualization, and reporting for improved decision-making. Dashboard and Visualization Development No 1 5,000,000.00 1,000,000.00 - 2,000,000.0 2,000,000.00 5,000,000.00 Data Cleansing and Migration Services No 1 2,000,000.00 1,000,000.00 - 1,000,000.0 - 2,000,000.00 User Access & Security Configuration (Role-based Access Controls) No 1 4,000,000.00 - - 2,000,000.0 2,000,000.00 4,000,000.00 Integration with Existing Systems (ERP, Billing, CRM, etc.) No 1 4,000,000.00 - - 2,000,000.00 2,000,000.00 4,000,000.00 Training for Users, Analysts, and Admins No 1 1,000,000.00 1,000,000.00 - - - 1,000,000.00 Support, Maintenance & Licensing No 300 106,666.67 8,000,000.00 - 12,000,000.00 12,000,000.00 32,000,000.00 Sub Total 11,000,000.00 - 19,000,000.00 18,000,000.00 48,000,000.00 6 Acquisition and implementation of Unified Threat Management systems, monitoring tools, Threat intelligence platforms, and Zero Trust Architecture on Data Center Infrastructure 808 808 ICT Project Investment No. Project & Sub items Unit Qty Unit Price 2025/2026 2026/2027 2027/2028 2028/2029 Total Amount Supply and deployment of a next-generation firewall with UTM features (IPS, antivirus, web filtering, application control (VPN). No 1 10,000,000.00 5,000,000.00 - 5,000,000.00 - 10,000,000.00 Centralized log collection, threat correlation, real- time alerting, compliance reporting No 1 10,000,000. 5,000,000.00 - 5,000,000.00 - 10,000,000.00 Installation of a Threat intelligence Platform for ingesting threat feeds, automating analysis, and providing actionable insights for SOC operations. No 1 15,000,000.00 5,000,000.00 - 10,000,000.00 - 15,000,000.00 Design and deployment of Zero Trust framework, including identity- based access controls, micro- segmentation, MFA, and policy enforcement. No 1 15,000,000. 5,000,000.00 - 10,000,000.00 - 15,000,000.00 Licenses, software updates, vendor support, and threat feed subscriptions. No 1000 60,000.00 10,000,000.00 - 25,000,000.00 25,000,000.00 60,000,000.00 Sub Total 30,000,000.00 - 55,000,000.00 25,000,000.00 110,000,000.00 7 Replacement of Data centre Cooling system Supply and installation of precision cooling units for temperature and humidity control in server room. No 4 3,750,000.00 - - 15,000,000.00 - 15,000,000.00 Installation of Ductwork, airflow diffusers, grills, and return air systems to support proper air circulation. No 1 2,000,000.00 - - 2,000,000.00 - 2,000,000.00 Power cabling, panels, a changeover switch, and UPS integration to support cooling unit operation during power outages. No 1 2,000,000.00 - - 2,000,000.00 - 2,000,000.00 Full installation, performance testing, commissioning, and handover documentation of the cooling system. No 1 2,000,000.00 - - 2,000,000.00 - 2,000,000.00 27th February, 2026 THE KENYA GAZETTE ICT Project Investment No. Project & Sub items Unit Qty Unit Price 2025/2026 2026/2027 2027/2028 2028/2029 Total Amount Sub total - - 21,000,000.00 - 21,000,000.00 8 Acquisition of Audit Management System Core license for a web-based or cloud-hosted audit management system with modules for audit planning, checklists, execution, workflow, risk assessment, and reporting. No 80 125,000.00 10,000,000.00 - 10,000,000.00 10,000,000.00 30,000,000.00 Customization - Tailoring of the system to align with the organization’s internal audit process, risk frameworks, reporting formats, and user roles. No 1 3,000,000.00 3,000,000.00 - - - 3,000,000.00 API/interface development to link with ERP, document management systems, HRMS, or risk registers. No 1 2,000,000.00 2,000,000.00 - - - 2,000,000.00 Deployment, system testing, training for auditors and administrators, and post-go-live support No 1 2,000,000.00 2,000,000.00 - - - 2,000,000.00 Sub Total 17,000,000.00 - 10,000,000.00 10,000,000.0 37,000,000.00 9 MAP kit System Licences Supply and installation of Map Kit Licences No 80 125,000.00 - - 10,000,000.00 10,000,000.0 20,000,000.00 Customization of Layers No 1 - - - - - Sub Total - - 10,000,000.00 10,000,000.0 20,000,000.00 10 Deployment of Enterprise Onsite/Offsite and cloud backup systems High-capacity NAS or backup server with RAID- protected storage, configured for incremental and full backups. Proje ct 1 10,000,000.00 10,000,000.00 - 20,000,000.00 10,000,000.00 40,000,000.00 Setup of a secondary backup server in a remote location or DR site with secure replication from the primary site. 1 10,000,000.00 10,000,000.00 - 10,000,000.00 - 20,000,000.00 Cloud-based backup storage subscription 100 100,000.00 5,000,000.00 - 10,000,000.00 10,000,000.00 25,000,000.00 Supply and installation of Enterprise-grade backup software 100 100,000.00 5,000,000.00 - 10,000,000.00 10,000,000.00 25,000,000.00 810 810 ICT Project Investment No. Project & Sub items Unit Qty Unit Price 2025/2026 2026/2027 2027/2028 2028/2029 Total Amount Supply and delivery of Switches, power backup (UPS), racks, surge protection, and cabling for all backup hardware. 1 5,000,000.00 - - 15,000,000.00 5,000,000.00 20,000,000.00 Configuration of Dashboard for real- time backup status, alerts, success/failure logs, retention policy compliance, and audit trail. 1 5,000,000.00 - - 5,000,000.00 5,000,000.00 10,000,000.00 Sub Total 30,000,000.00 - 70,000,000.00 40,000,000.00 140,000,000.00 11 Acquire, renew, and manage software licenses to ensure compliance with vendor agreements, cybersecurity regulations, and operational requirements Microsoft Office Licences No 1000 30,000.00 20,000,000.00 - 30,000,000.00 30,000,000.00 80,000,000.00 Microsoft Windows Licences No 1000 40,000.00 20,000,000.00 - 40,000,000.00 40,000,000.00 100,000,000.00 Microsoft Windows Server Licences No 150 200,000.00 15,000,000.00 - 30,000,000.00 30,000,000.00 75,000,000.00 Microsoft Exchange Licences No 3000 10,000.00 20,000,000.00 - 30,000,000.00 30,000,000.00 80,000,000.00 Antivirus End User Device Licences No 1000 15,000.00 15,000,000.00 - 15,000,000.00 15,000,000.00 45,000,000.00 Supply and installation of AutoCAD licenses No 40 375,000.00 - - 15,000,000.00 15,000,000.00 30,000,000.00 Supply and installation of Water Flow licences No 40 375,000.00 - - 15,000,000.00 15,000,000.00 30,000,000.00 Oracle ERP licences 400 75,000.00 20,000,000.00 - 30,000,000.00 30,000,000.00 80,000,000.00 Sub Total 110,000,000.00 - 205,000,000.00 205,000,000.00 520,000,000.00 12 Establishment of an I - Water hub and Excellence Centre Facility renovation (offices, labs, HVAC, lighting) Unit 1 10,000,000. - - 10,000,000.00 - 10,000,000.00 ICT infrastructure (LAN, Wi-Fi, cabling) Unit 1 5,000,000.0 - - 5,000,000.00 - 5,000,000.00 Server & data intelligence environment No 1 10,000,000. - - 5,000,000.00 5,000,000.00 10,000,000.00 Smart display & collaboration tools Unit 1 20,000,000. - - 10,000,000.00 10,000,000.00 20,000,000.00 Lab setup – IoT, AI & smart water tech Unit 1 10,000,000. - - 8,000,000.00 2,000,000.00 10,000,000.00 Branding & knowledge resource center unit 1 2,000,000.0 - - 2,000,000.00 - 2,000,000.00 Sub Total - - 40,000,000.00 17,000,000.00 57,000,000.00 13 Solarization of Data Center Power System/UPS Supply and installation of high- efficiency solar photovoltaic panels to generate clean energy for data center operations. No 50 200,000.00 - - 10,000,000.00 - 10,000,000.00 Supply and Installation of Smart inverters to convert DC to AC and manage power flow between solar, grid, and battery/UPS. No 20 350,000.00 - - 7,000,000.00 - 7,000,000.00 27th February, 2026 THE KENYA GAZETTE ICT Project Investment No. Project & Sub items Unit Qty Unit Price 2025/2026 2026/2027 2027/2028 2028/2029 Total Amount Supply and installation of an Energy storage system (Battery Bank) to provide backup power and buffer for solar energy storage. No 50 460,000.00 - - 15,000,000.00 8,000,000.00 23,000,000.00 Electrical Works and Integration Unit 1 5,000,000.00 - - 5,000,000.00 - 5,000,000.00 Installation, Testing and Commissioning Proje ct 1 3,000,000.00 - - 3,000,000.00 - 3,000,000.00 Sub Total - - 40,000,000.00 8,000,000.00 48,000,000.00 14 Acquisition and implementation of analytics and AI systems in Leak detection and Monitoring. Supply and installation of IoT- enabled pressure sensors at key nodes No 2000 17,500.00 - - 20,000,000.00 15,000,000.00 35,000,000.00 Supply and Installation of Devices to collect sensor data and transmit securely via GSM, LoRaWAN, or NB- IoT to the analytics platform. No 2000 17,500.00 - - 20,000,000.00 15,000,000.00 35,000,000.00 Supply and Installation of on- prem software to process sensor data using AI/ML for anomaly detection, leak localization, and predictive analytics. No 1 20,000,000.00 - - 10,000,000.00 10,000,000.00 20,000,000.00 Design and configuration of a Real-time visualization platform with GIS interface, alert configuration, and mobile accessibility. No 5 4,000,000.00 - - 10,000,000.00 10,000,000.00 20,000,000.00 Development of interfaces/APIs to connect leak analytics with existing systems No 5 2,000,000.00 - - 5,000,000.00 5,000,000.00 10,000,000.00 Sub Total - - 65,000,000.00 55,000,000.00 120,000,000.00 15 Acquisition and implementation of additional ERP Modules. (Asset management/Maintenance, i-sourcing) Customization and Configuration of the Modules Proje ct 1 10,000,000.00 - - 10,000,000.00 5,000,000.00 15,000,000.00 Oracle Licences for the Modules No 300 116,666.67 - - 35,000,000.00 35,000,000.00 70,000,000.00 Training No 300 33,333.33 - - 10,000,000.00 10,000,000.00 20,000,000.00 Sub Total - - 55,000,000.00 50,000,000.00 105,000,000.00 16 Acquisition and Implementation of Time and Attendance System, Biometric Installation & Configuration of the Time & Attendance System Proje ct 1 5,000,000.00 - - 5,000,000.00 - 5,000,000.00 Procurement of Biometric Scanners No 50 200,000.00 - - 10,000,000.00 - 10,000,000.00 Installation of the biometric scanners - cabling, electrical works No 1 5,000,000.00 - - 5,000,000.00 - 5,000,000.00 Integration with HR system Proje ct 1 5,000,000.00 - - 5,000,000.00 - 5,000,000.00 Sub Total - - 25,000,000.00 - 25,000,000.00 812 812 ICT Project Investment No. Project & Sub items Unit Qty Unit Price 2025/2026 2026/2027 2027/2028 2028/2029 Total Amount Grand Total 223,000,000.00 - 827,000,000.00 627,000,000.00 1,677,000,000.00 3. Water Supply Management – (Extension of water pipeline in Mihangó, Utawala, Ruai and Kamulu (426 km)) a) Water Extension Water Extension No. Description Unit Qty Unit Cost KSh Amount (KSh) 2025/2026 2026/2027 2027/2028 2028/2029 Extension of water pipeline in Mihangó, Utawala, Ruai & Kamulu (426 km) 1 Preliminary and General items 1 127,600,000 127,600,000 63,800,000 63,800,000.00 2 Measured Works 2.1 Site clearance Ha 10 510,400 5,104,000 5,104,000.00 2.2 Site setting out M 426000 127.60 54,357,600 54,357,600.00 2.3 Trench excavation works m3 511200 765.60 391,374,720 391,374,720.00 2.4 Supply and installation of assorted pipes (50mm Dia - 200mm Dia) M 426000 3,190.00 1,358,940,000 364,250,383.41 497,344,808.29 497,344,808.29 2.5 Installation of appurtenances (valves & valve chambers. Item 1 13,589,400. 13,589,400 6,794,700.00 6,794,700.00 2.6 Surface Restoration: Reinstating roads, pavements, or landscapes disturbed during works. m 426000 255.20 108,715,200 54,357,600.00 54,357,600.00 2.7 Testing and commissioning m 426000 127.60 54,357,600 27,178,800.00 27,178,800.00 2.8 Last Mile Connections Nr 10000 15,950.00 159,500,000 79,750,000.00 79,750,000.00 Total - Water Supply Management – (Extension of water pipeline in Mihangó, Utawala, Ruai & Kamulu (426 km)) 2,273,538,520 63,800,000 878,886,703.41 665,425,908.29 665,425,908.29 (d) Sewer Extension- Extension of sewer lines in Mihangó, Utawala & Ruai (100 km) Sewer Extension Description Unit Quantity Rate Amount 2025/2026 2026/2027 2027/2028 2028/2029 Extension of sewer lines in Mihangó, Utawala & Ruai (100 km) 1 Preliminary and General items Ls 1 153,120,000.00 153,120,000 76,560,000 76,560,000 2 Testing of Works m 100000 127.60 12,760,000 12,760,000 3 Site investigation Nr 1000 1,276.00 1,276,000 1,276,000 4 Demolition and Site Clearance m 11500 102.08 1,173,920 1,173,920 5 Excavation, laying of pipes & Backfilling (DN375&300mm) inclusive of Installation of manholes & Ancillaries m 100000 19,140.00 1,914,000,000 517,100,000 698,450,000 698,450,000 7 Reinstatements Ls 1 19,140,000 19,140,000 9,570,000 9,570,000 8 Support and Protection Ls 1 19,140,000 19,140,000 9,570,000 9,570,000 10 Bedding and Haunching m 100000 1,914.00 191,400,000 95,700,000 95,700,000 11 Tie-in Works Ls 1 3,828,000 3,828,000 1,914,000 1,914,000 12 Last Mile Connections Nr 8000 21,054.00 168,432,000 84,216,000 84,216,000 Total- Sewer Extension- Extension of sewer lines in Mihangó, Utawala & Ruai (100 km) 2,484,269,920 76,560,000 596,109,920 899,420,000 912,180,000 Dated the 12th February, 2026. RICHARD CHERUIYOT, MR/8099492 Ag. Chief Executive Officer, Water Services Regulatory Board. 27th February, 2026 THE KENYA GAZETTE

Dated the 12th February, 2026.

RICHARD CHERUIYOT,

Ag. Chief Executive Officer, Water Services Regulatory Board.

Extracted Entities (1)

previous_gazette_ref

2710

Details

Act / Legislation
THE WATER ACT
Reference
Cap. 372
Section
section 72 (1) (b)
Signed By
RICHARD CHERUIYOT
Title
Ag. Chief Executive Officer, Water Services Regulatory Board
Date Signed
12th February 2026
Page
25
Extraction Method
regex