Back
REGULATION
100% confidence
via regex
GAZETTE NOTICE NO. 12747
GAZETTE NOTICE NO. 12747
THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
(No. 8 of 1999)
REGULATION
Pursuant to Regulation 21 of the Environmental Management and
Co-ordination (Impact Assessment and Audit) Regulations, 2003, the
National Environment Management Authority (NEMA) has received
an Environmental Impact Assessment Study Report for the above
proposed project.
The proponent, Tillmann Wolfgang Proske, is proposing to
construct two blocks of twelve (12) floors comprising of 15,227 square
meters retail and office spaces, 314 parking bays and other associated
amenities on plot L.R. No. 209/4907 located along Riverside Gardens
off Riverside Drive on latitude 1°16’8.04’’S and longitude
36°47’21.38’’E in Riverside area of Nairobi City County.
The following are the anticipated impacts and proposed mitigation
measures:
Impacts Proposed Mitigation Measures
Air pollution • Sprinkling of water regularly on dusty areas to
suppress dust.
• Careful screening of the site to contain and
arrest demolition related dust.
• Ensure demolition machinery and equipment
are well maintained to reduce exhaust gas
emission.
Liquid waste • Ensure sanitary facilities are kept clean always
through regular cleaning.
• Ensure regular maintenance of foul water
drainage works at the premises to prevent
clogging and fore-stall breakdowns.
• Frequent monitoring of the internal drainage
system.
Increased energy
use
• Solar energy will be used as an alternative
source of energy.
• Use energy efficient appliances such as LED
bulbs for lighting.
• Switch off electrical appliances when not in
use.
• Regular maintenance of all the electrical
components.
• Regular inspection and maintenance of the
solar panels.
Noise pollution • Demolition activities to be restricted to
daytime (8 a.m. to 5 p.m.).
• Use of Suppressors/noise shields on noisy
equipment.
• Ensure that all workers wear respective safety
and protective gear (PPEs).
• Comply with EMCA (Noise and Excessive
Vibration Pollution Control) Regulations
2009.
Solid waste • Ensure that all solid waste is disposed at
designated areas by NEMA waste handler.
• Reuse of construction debris where feasible.
• Ensure refuse collection vehicles are covered
to prevent scattering of wastes by wind during
transportation.
• Ensure all persons involved in refuse
collection are in full protective attire (PPEs).
• Proper decommissioning of all the sanitary
facilities.
Increased water
demand
• Use water efficient appliances and fixtures for
plumbing products and white goods.
• Prompt detect and repair of all the plumbing
products and white goods.
• Provision of rain water harvesting facilities to
supplement other sources of water supply.
• Provision of roof/underground tanks for water
storage.
• Regular maintenance of all the water
components.
• Encourage water reuse/recycling where
feasible.
• Provide notices and information signs to
sensitize on means and needs to conserve
water resource i.e. ‘Keep/Leave the Tap
Closed’, etc. This will awaken the civic
THE KENYA GAZETTE 7th December, 2018
4330 4330
Impacts Proposed Mitigation Measures
consciousness of the residents with regard to
water usage and management.
Air pollution • Ensure regular collection and disposal of solid
waste to avoid air pollution.
• Periodic maintenance of generator and water
pumps.
• Comply with Air Quality regulations.
Health and safety
of workers
• All workers to wear PPEs e.g. helmets.
• All workers shall be sensitized before
demolition begins, on how to control accidents
related to demolition.
• Adherence to safety procedures shall be
enforced.
• All workers shall be adequately insured against
accidents.
The full report of the proposed project is available for inspection
during working hours at:
(a) Director-General, NEMA, Popo Road, off Mombasa Road,
P.O. Box 67839–00200, Nairobi.
(b) Principal Secretary, Ministry of Environment and Mineral
Resources, NHIF Building, Community, P.O. Box 30521,
Nairobi.
(c) County Director of Environment, Nairobi City County.
The National Environment Management Authority invites
members of the public to submit oral or written comments within
thirty (30) days from the date of publication of this notice to the
Director-General, NEMA, to assist the Authority in the decision
making process of the plan.
GEOFFREY WAHUNGU,
Director-General,
MR/5558804 National Environment Management Authority.
Dated the 7th December, 2018.
GEOFFREY WAHUNGU,
Director-General, National Environment Management Authority.
Extracted Entities (1)
previous_gazette_ref
12747
Details
- Act / Legislation
- THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
- Reference
- No. 8 of 1999
- Signed By
- GEOFFREY WAHUNGU
- Title
- Director-General, National Environment Management Authority
- Date Signed
- 7th December 2018
- Page
- 25
- Extraction Method
- regex
Source Gazette
Vol. CXX No. 149
Published 11th January 2018