GAZETTE NOTICE NO. 12831

PURSUANT to clause 5 of Part III of the Schedule of Tariffs 2018, notice is given that all prices for electrical energy specified in Part II of the said Schedule will be liable to a Water Resource Management Authority (WRMA) levy of plus 2.07 Kenya cents per kWh for all meter readings to be taken in December, 2018. THE KENYA GAZETTE 14th December, 2018 4362 4362 Information used to calculate the WRMA levy: Approved WRMA levy for energy purchased from hydropower plants of capacity equal to or above 1MW = 5 Kenya cents per KWh. Units Purchased in November, 2018 Hydropower Plant (KWh.) Gitaru 85,901,000 Kamburu 38,391,000 Kiambere 84,720,000 Kindaruma 19,015,730 Masinga 15,367,000 Tana 10,632,642 Wanjii 2,344,523 Sagana 802,325 Ndula 0 Turkwel 54,536,810 Gogo 892,822 Sondu Miriu 17,809,000 Sangoro 5,512,960 Regen-Terem 2,084,949 Chania 14,430 Gura 1,633,171 Total units purchased from hydropower plants with capacity equal to or above 1MW, 339,658,362 kWh Total units generated and purchased including hydros excluding exports in November, 2018 = 962,482,438 kWh ROBERT PAVEL OIMEKE, MR/4167093 Director-General.

Extracted Entities (1)

previous_gazette_ref

12831

Details

Signed By
ROBERT PAVEL OIMEKE
Title
Director-General
Date Signed
14th December 2018
Page
11
Extraction Method
regex