Back
REGISTRATION
84% confidence
via regex
GAZETTE NOTICE NO. 11667
GAZETTE NOTICE NO. 11667
THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
(No. 8 of 1999)
REGISTRATION
Pursuant to Regulation 21 of the Environmental Management and
Co-ordination (Impact Assessment and Audit) Regulations, 2003, the
National Environment Management Authority (NEMA) has received
an Environmental Impact Assessment Study Report for the above
proposed project.
The proponent, Vipingo Development Limited is proposing to set
up a proposed Liquefied Petroleum Gas (LPG) plant auxiliary facilities
involves setting up and operating a bulk LPG storage facility with a
total capacity of 22,000 tonnes. The plant will be served by auxiliary
facilities which will include; office block, LPG trucks loading bay,
jetty, weigh bridge and control rooms. The project will be set on an
undeveloped 20 acres portion of land.
The following are the anticipated impacts and proposed mitigation
measures:
Impacts Proposed Mitigation Measures
Solid waste
generation
• Contract NEMA licensed waste handler for
waste disposal.
• Collect all recyclable materials and sent to
NEMA licensed recyclers.
• Comply with Waste Management Regulations,
2006.
• Provide litter bins to office areas.
• Commercial wastes sent to NEMA approved
recycling plants.
• Install/construct a bio-digester.
• Procure and staff training on the use of oil
spill response kit.
• Applying for an effluent discharge licence
from NEMA.
• Compliance with the Water Quality
Regulations, 2006.
• Salvage re-usable or recyclable materials from
the LPG Plant for sale or for other projects.
• Contract a construction company for
demolitions of the office block and jetty.
Air quality and
noise pollution
• Sprinkle water at the working areas.
• Provide scarf folding during construction.
• Truck drivers to observe speed limits.
• Provide dust masks to workers and visitors.
• Developing a plan of action to guide transfer
of LPG.
• Operations be undertaken by qualified
personnel.
Potential oil spills • Vessels to comply with the Marpol
Convention, KMA Regulations and the
United Nations Law of the Sea.
• Equip jetty with emergence oil spill response
kits.
• Trained personnel to handle oil spills.
Impacts Proposed Mitigation Measures
Increased demand
for water and
energy resources
• Installation of sanitation facilities that use
minimal water.
• Create awareness among employees and
guests on water conservation.
• Install compact fluorescent lights in high use
areas.
• Conduct energy audits after every three
years.
• Awareness creation among employees and
guests on energy conservation.
Safety and health
of workers
• Registration of the site as a work place.
• Provision of PPEs.
• Provision of correct tools and equipment.
• Obtain insurance cover for the workers.
• Provision of First aid services and an
emergency vehicle.
• Control entry of visitors to the site.
• Secure sharp and moving parts of machines.
• Compliance with Occupational Safety and
Health Act.
Soil quality • Carry out a soil investigation prior to
installation.
• Consult with the Fire Department regarding
placing the storage vessels.
Vegetation
degradation
• Landscape the site.
• Hoard the site.
The full report of the proposed project is available for inspection
during working hours at:
(a) Director-General, NEMA, Popo Road, off Mombasa Road,
P.O. Box 67839–00200, Nairobi.
(b) Principal Secretary, Ministry of Environment and Mineral
Resources, NHIF Building, Community, P.O. Box 30521,
Nairobi.
(c) County Director of Environment, Kilifi County.
The National Environment Management Authority invites
members of the public to submit oral or written comments within
thirty (30) days from the date of publication of this notice to the
Director-General, NEMA, to assist the Authority in the decision
making process of the plan.
GEOFFREY WAHUNGU,
Director-General,
MR/5555259 National Environment Management Authority.
GEOFFREY WAHUNGU,
Director-General, National Environment Management Authority.
Extracted Entities (1)
previous_gazette_ref
11667
Details
- Act / Legislation
- THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
- Reference
- No. 8 of 1999
- Signed By
- GEOFFREY WAHUNGU
- Title
- Director-General, National Environment Management Authority
- Page
- 24
- Extraction Method
- regex
Source Gazette
Vol. CXX No. 137
Published 22nd March 2018