GAZETTE NOTICE NO. 11816
PURSUANT to clause 5 of Part III of the Schedule of Tariffs 2018, notice is given that all prices for electrical energy specified in Part II -
(A) of the said Schedule will be liable to a Water Resource Management Authority (WRMA) levy of plus 1.79 Kenya cents per kWh for all meter
readings to be taken in December, 2019.
Information used to calculate the WRMA levy:
Approved WRMA levy for energy purchased from hydropower plants of capacity equal to or above 1MW = 5 Kenya cents per KWh.
Units Purchased in November, 2019
Hydropower Plant (Kwh.)
Gitaru 80,486,000
Kamburu 4,639,000
Kiambere 75,590,000
Kindaruma 19,517,400
Masinga 2,354,000
Tana 13,620,178
Wanjii -
Sagana 901,887
Ndula -
Turkwel 37,931,800
THE KENYA GAZETTE 13th December, 2019
4840 4840
Units Purchased in November, 2019
Hydropower Plant (Kwh.)
Gogo 414,966
Sondu Miriu 42,470,000
Sangoro 14,556,330
Regen-Terem 3,182,176
Chania 59,582
Gura 3,081,312
Total units purchased from hydropower plants with capacity equal to or above 1MW = 298,804,631 kWh
Total units generated and purchased (G) excluding exports in November, 2019 = 982,458,011 kWh
ROBERT PAVEL OIMEKE,
MR/5815861 Director-General.
Extracted Entities (1)
previous_gazette_ref
11816
Details
- Signed By
- ROBERT PAVEL OIMEKE
- Title
- Director-General
- Date Signed
- 13th December 2019