Back
OTHER 89% confidence via regex

GAZETTE NOTICE NO. 11816

PURSUANT to clause 5 of Part III of the Schedule of Tariffs 2018, notice is given that all prices for electrical energy specified in Part II - (A) of the said Schedule will be liable to a Water Resource Management Authority (WRMA) levy of plus 1.79 Kenya cents per kWh for all meter readings to be taken in December, 2019. Information used to calculate the WRMA levy: Approved WRMA levy for energy purchased from hydropower plants of capacity equal to or above 1MW = 5 Kenya cents per KWh. Units Purchased in November, 2019 Hydropower Plant (Kwh.) Gitaru 80,486,000 Kamburu 4,639,000 Kiambere 75,590,000 Kindaruma 19,517,400 Masinga 2,354,000 Tana 13,620,178 Wanjii - Sagana 901,887 Ndula - Turkwel 37,931,800 THE KENYA GAZETTE 13th December, 2019 4840 4840 Units Purchased in November, 2019 Hydropower Plant (Kwh.) Gogo 414,966 Sondu Miriu 42,470,000 Sangoro 14,556,330 Regen-Terem 3,182,176 Chania 59,582 Gura 3,081,312 Total units purchased from hydropower plants with capacity equal to or above 1MW = 298,804,631 kWh Total units generated and purchased (G) excluding exports in November, 2019 = 982,458,011 kWh ROBERT PAVEL OIMEKE, MR/5815861 Director-General.

Extracted Entities (1)

previous_gazette_ref

11816

Details

Signed By
ROBERT PAVEL OIMEKE
Title
Director-General
Date Signed
13th December 2019
Page
19
Extraction Method
regex