Back
OTHER 74% confidence via regex

GAZETTE NOTICE NO. 8384

PURSUANT to Clause 5 of Part III of the Schedule of Tariffs 2018, notice is given that all prices for electrical energy specified in Part II -(A) of the said Schedule will be liable to a Water Resource Management Authority (WRMA) levy of plus 1.74 Cents per kWh for all meter readings taken in July 2022 Information used to calculate the WRMA levy: Approved WRMA levy for energy purchased from hydropower plants of capacity equal to or above 1MW=5.00 Kenya cents per KWh. Hydropower Plant Units Purchased in June 2022 (kWh) Gitaru 52,220,040 Kamburu 28,151,750 Kiambere 54,726,310 Kindaruma 11.895,710 Masinga 12,086,910 Tana 6,531,420 Wanjii - Sagana 518,169 Turkwel 45,816,510 Gogo 463,716 Sondu Miriu 36,668,000 Sangoro 11,856,870 Regen-Terem 871,220 Chania 60,954 Gura 1,547,931 Metumi 1,216,410 Total units purchased from hydropower plants with capacity equal to or above 1MW = 264,631,920 kWh Total units generated and purchased (G) excluding exports in June 2022 = 1,073,241,635 kWh DANIEL K. BARGORIA, MR/3253364 Director-General.

Extracted Entities (1)

previous_gazette_ref

8384

Details

Signed By
DANIEL K. BARGORIA
Title
Director-General
Page
29
Extraction Method
regex