GAZETTE NOTICE NO. 4069
GAZETTE NOTICE NO. 4069
THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
(No. 8 of 1999)
ACT
PURSUANT to section 59 of the Environmental Management and
Co-ordination Act, 1999, the National Environment Management
Authority (NEMA) has received an Environmental Impact Assessment
Study Report for the above-proposed project.
5th April, 2024 THE KENYA GAZETTE
The proponent, Blissful Residences Investment Limited proposes
to construct 4No. blocks of residential apartments of 18No. floors each
(ground, 18No. floors plus 3No. basements) comprising a total of
324No. units (144N0. One bedroom units, 108No. two bedroom units,
54No. three bedroom units and 18No. four bedroom units), driveway,
parking spaces, recreational facilities, associated facilities and
amenities. The proposed project will be located on Plot L.R. No.
Nairobi/Block 17/392, along Ndemi Road in Kilimani, Dagoretti North
Sub-county, Nairobi City County.
The following are the anticipated impacts and proposed mitigation
measures:
Environmental
Impacts
Mitigation Measures
Soil erosion • Control earthworks.
• Install drainage structures to control flow
of storm water.
• Ensure management of excavation
activities.
Loss of vegetation • Only area earmarked for development
should be cleared.
• Plant trees, shrubs and flowers on
remaining open spaces.
Changes in
hydrology/
impended
drainage/deep
excavations
• Proper Installation of drainage structures.
• Install cascades to break the impact of
water flowing in the drains.
• Ensure efficiency of drainage structures
through proper design and maintenance.
• Provide gratings to the drainage channels.
• A geotechnical survey shall be conducted
and the recommendations thereof
followed. There shall be no blasting during
excavation.
• A methodology for excavation shall be
generated as required by National
Construction Authority.
Air pollution • Stockpiles of earth should be sprayed with
water or covered during dry seasons.
• Provide dust masks for personnel in dusty
areas.
• Sensitize construction workers on
pollution control measures.
• Cover all trucks hauling soil, sand and
other loose materials.
Noise pollution • Install suitable barriers to shield
compressors and other small stationary
equipment where necessary.
• Display signs to indicate construction
activities.
• Maintain all equipment.
• Adhere to provisions of Noise Prevention
and Control Rules, 2005, Legal Notice No.
24 regarding noise limits at the workplace
as well as NEMA Noise Excessive
Vibration Pollution Control Regulations,
2000.
Public health,
occupational health
and safety
• Train staff/workers on occupational health
and safety.
• Provide full protective gear and
workmen’s compensation cover in
addition to the right tools and operational
instructions and manuals during
construction.
• Design of sewerage system should be as
provided in the plans and should be
constructed to approved size and design,
standard and of approved materials.
Environmental
Impacts
Mitigation Measures
• Ensure use of standard construction
materials and to the specifications. Avoid
undesirable, substandard, hazardous or
unauthorized materials during construction
and maintenance.
• Sensitized staff on social/health issues
such as drugs.
Road traffic
disruption
• No overloading of trucks and good driving
practices to be practiced.
• Suitable junction/access point to be
provided.
• Use of appropriate and legible signage.
• Employment of formal flagmen/ women to
ensure the public safety.
Insecurity • Provision of security guards, CCTV
cameras, security lights and other security
apparatus during the entire project cycle.
• Construction work timings shall only go in
line with the NEMA licensing conditions.
Increased water
usage
• Observe, protect and conserve the riparian
reserve in compliance with the Water Act,
2016 and Water Reserve Management
Rules 118 (1).
• An alternative water source shall be
provided. The proponent shall drill a
borehole at the proposed site.
• Management of water usage. Avoid
unnecessary wastage.
• Recycling of water at the construction
phase where possible.
• Make use of roof catchments to provide
water i.e. for general purpose.
Increased waste
generation
• Adopt waste minimization at source.
• Monitoring the fate of disposed wastes to
ensure they are legally land filled at a
recognized controlled site.
• Adhering to Waste Management
Regulations of 2006.
The full report of the proposed project is available for inspection
during working hours at:
(a) Principal Secretary, Ministry of Environment and Forestry,
NHIF Building, 12th Floor, Ragati Road, Upper Hill, P.O.
Box 30126–00100, Nairobi.
(b) Director-General, NEMA, Popo Road, off Mombasa Road,
P.O. Box 67839–00200, Nairobi.
(c) County Director of Environment, Nairobi City County.
A copy of the report can be downloaded at www.nema.go.ke
The National Environment Management Authority invites
members of the public to submit oral or written comments within
thirty (30) days from the date of publication of this notice to the
Director-General, NEMA, to assist the Authority in the decision
making process regarding this project.
Comments can also be emailed to dgnema@nema.go.ke
MAMO B. MAMO,
Director-General,
MR/6195784 National Environment Management.
Dated the 5th April, 2024.
MAMO B. MAMO,
Director-General, National Environment Management.
Extracted Entities (1)
previous_gazette_ref
4069
Details
- Act / Legislation
- THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
- Reference
- No. 8 of 1999
- Section
- section 59
- Signed By
- MAMO B. MAMO
- Title
- Director-General, National Environment Management
- Date Signed
- 5th April 2024