GAZETTE NOTICE NO. 9598
GAZETTE NOTICE NO. 9598
THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
(No. 8 of 1999)
ACT
Pursuant to section 59 of the Environmental Management and Co-
ordination Act, 1999, the National Environment Management
Authority (NEMA) has received an Environmental Impact Assessment
Study Report for the above proposed project.
The proponent, Neogreen Vineyard Investments Limited proposes
to construct a block of residential apartments comprising 2No.
basement floors, ground floor and first floor for parking spaces, and
2nd to 19th floors comprising of 288 No. residential apartment units-
(144 No. one bedroom, 72No. two bedroom, 72 No. three bedroom)
and other associated amenities and facilities on plot L.R. No.
Nairobi/Block 27/271, along Mtito Andei Road, in Kilimani, Nairobi
City County.
The following are the anticipated impacts and proposed mitigation
measures:-
Impacts Proposed Mitigation Measures
Soil erosion • Control earthworks.
• Install drainage structures to control flow of
storm water.
• Ensure and management of excavation
activities.
Loss of
vegetation
• Only area earmarked for development should
be cleared.
• Plant trees, shrubs and flowers on remaining
open spaces.
Changes in
hydrology/
impended
drainage/
deep
excavations
• proper Installation of drainage structures.
• Install cascades to break the impact of water
flowing in the drains.
• Ensure efficiency of drainage structures
through proper design and maintenance.
• Provide gratings to the drainage channels.
• A geotechnical survey shall be conducted and
the recommendations thereof followed. There
shall be no blasting during excavation.
• A methodology for excavation shall be
generated as required by NCA.
Air pollution • Stockpiles of earth should be sprayed with
water or covered during dry seasons.
• Provide dust masks for personnel in dusty
areas.
• Sensitize construction workers on pollution
control measures.
• Cover all trucks hauling soil, sand and other
loose materials.
Noise pollution • Install suitable barriers to shield compressors
and other small stationary equipment where
necessary.
• Display signs to indicate construction
activities.
• Maintain all equipment.
• Adhere to provisions of Noise Prevention and
Control Rules 2005, Legal Notice No. 24
regarding noise limits at the workplace as well
as NEMA Noise Excessive Vibration
Pollution Control Regulations, 2000.
Public health,
occupational
health and
safety
• Train staff/workers on occupational health and
safety.
• Provide full protective gear and workmen’s
compensation cover in addition to the right
tools and operational instructions and
manuals during construction.
• Design of sewerage system should be as
provided in the plans and should be
constructed to approved size and design,
standard and of approved materials.
• Ensure use of standard construction materials
and to the specifications. Avoid undesirable,
substandard, hazardous or unauthorized
materials during construction and
maintenance.
• Sensitized staff on social/health issues such as
drugs.
Road traffic
disruption
• No overloading of trucks and good driving
practices to be practiced.
• Suitable junction/access point to be provided.
• Use of appropriate and legible signage.
• Employment of formal flagmen/ women to
ensure the public safety.
• Follow the traffic management plan
throughout the project cycle.
THE KENYA GAZETTE 2nd August, 2024
Impacts Proposed Mitigation Measures
Insecurity • Provision of security guards, CCTV cameras,
security lights and other security apparatus
during the entire project cycle.
• Construction work timings shall only in line
with the NEMA licensing conditions.
Increased water
usage
• An alternative water source shall be provided.
The proponent shall drill a borehole at the
proposed site.
• Management of water usage. Avoid
unnecessary wastage.
• Recycling of water at the construction phase
where possible.
• Make use of roof catchments to provide water
i.e. for general purpose.
Increased waste
generation
• Adopt waste minimization at source.
• Monitoring the fate of disposed wastes to
ensure they are legally land filled at a
recognized controlled site.
• Adhering to Waste Management Regulations
of 2006.
The full report of the proposed project is available for inspection
during working hours at:
(a) Principal Secretary, Ministry of Environment, Climate
Change and Foresty, NHIF Building, 12th Floor, Ragati
Road, Upper Hill, Upper Hill, P.O. Box 30126–00200,
Nairobi.
(b) Director General, NEMA, Popo Road, off Mombasa Road,
P.O. Box 67839–00200, Nairobi.
(c) County Director of Environment, Nairobi City County.
A copy of the EIA report can be downloaded at www.nema.go.ke
The National Environmental Management Authority, invites
members of the public to submit oral or written comments within
thirty (30) days from the date of publication of this notice to the
Director General, NEMA to assist the Authority in the decision
making process for this project.
Comments can also be e-mailed to dgnema@nema.go.ke
MAMO B. MAMO,
Director-General,
MR/6513727 National Environment Management Authority.
Dated the 2nd August, 2024.
MAMO B. MAMO,
Director-General, National Environment Management Authority.
Extracted Entities (1)
previous_gazette_ref
9598
Details
- Act / Legislation
- THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
- Reference
- No. 8 of 1999
- Section
- section 59
- Signed By
- MAMO B. MAMO
- Title
- Director-General, National Environment Management Authority
- Date Signed
- 2nd August 2024
- Page
- 35
- Extraction Method
- regex
Source Gazette
Vol. CXXVI No. 117
Published 21st February 2024