Back
DISSOLUTION 100% confidence via regex

GAZETTE NOTICE NO. 5050

GAZETTE NOTICE NO. 5050

THE COMPANIES ACT

(No. 17 of 2015)

DISSOLUTION


PURSUANT to section 897 (3) of the Companies Act, it is notified that at the expiration of three (3) months from the date of this gazette, the names of the under-mentioned companies shall unless cause is shown to the contrary be struck off the register of companies and the companies shall be dissolved. Number Name of Company CPR/2012/69372 African Travel Company Limited CPR/2015/2199I3 Amandla Ventures Limited CPR/2014/167788 Bake Tech East Africa Limited PVT-KAULX25 Csafrica Link Kenya Limited CPR/2014/156428 Dawn Africa Construction Company Limited CPR/2012/89602 Dev International Limited CPR/2012/87709 Fedha Springs Limited CPR/2013/95003 Foxglove Holdings Limited C. 160900 Free World Technologies Limited CPR/2016/220080 Great Nine Dynasty Limited CPR/2014/163817 Keremis investments Limited CPR/2010/32409 Mahek Powertech Limited C. 139732 Mckinney Rodgers Kenya Limited CPR/2014/154066 Palm Brooke Company Limited PVT/2016/000176 Primeserve Enterprises Limited PVT-AJURRBD Samil Africa Corporation Limited PVT-LRUB6B3 Squeaky Clean Waters Limited CPR/2014/154048 Trade Peak Company Limited CPR/2012/86147 Tulip International Limited Dated the 15th July, 2020. ALICE MWENDWA, for Registrar of Companies. GAzErrE NOTICE No. 5051 THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT (No. 8 of 1999) THE NATIONAL ENVIRONMENT MANAGEMENT AUTHORITY ENVIRONMENTAL IMPACT ASSESSMENT STUDY REPORT FOR PROPOSED FLOATING FUELING STATION, LAMU COUNTY INVITATION OF PUBLIC COMMENTS PURSUANT to regulation 21 of the Environmental Management and Coordination (Impact Assessment and Audit) Regulations, 2003, the National Environment Management Authority (NEMA) has received an Environmental Impact Assessment Study Report for the above proposed project. The proponent, Jaffar Shebe Auni is proposing to construct a floating fueling station will have the following facilities; Solar panels, 3 storage and access tanks, 2 manholes (I diesel the other petrol), 1 fuel pump pedestal with 2 pumps (petrol and diesel), 4 fuel interceptors and 1 toilet, 3 fuel steel tanks, 1 spillage sump, 1 manhole, 1 inverter, 1 access to under cabin passage and an attendant's cabin or office located in Lamu County. The following are the anticipated impacts and proposed mitigation measures: Solid waste Littering the Fuel storage • Waste facility and containers and segregation(provide increasing fore packaging, coded bins) and risk. food reuse. packaging and food remains. • The management of the floating fueling station need to apply for an effluent discharge licence with the guidance of the NEMA office. -Cleaning -Oil interceptor -Maintenance of the drainage • Minimize energy consumption. • Monitor energy use and set targets for efficient energy use. Psychological, Work related Walk way security and stress , injuries obstruction. physical and illness. health Poor ergonomics. • Maintain housekeeping to minimize congestion. Environmental Potential Potential Mitigation Controls Component Environmental Source of (through EMMP and Impact Impact Design) Lack of • Maintenance of signage working equipment warning. to prevent work Long working related injuries. hours. • Proper signage to prevent accidents. • Maintain work shifts of not more than 8 hours. • Provide security personnel and 24 hour security line. Neighbour- Psychological conflicts with • Proper hood conflicts disturbance, other management, injury, interested organization and accident. parties. sufficient staff, qualified staff Sustainability Longevity of Poor • Maintain supply, project. housekeeping, source of income poor record for staff and traders keeping, lack by maintaining the of facility facility, complying maintenance, with institutional failure to regulations and comply with laws and good institutional organization. regulations and laws. The full report of the proposed project is available for inspection during working hours at: (a) Principal Secretary, Ministry of Environment and Forestry, NHIF Building, Community, P.O. Box 30126-00100, Nairobi. (b) Director-General, NEMA, Popo Road, off Mombasa Road, P.O. Box 67839-00200, Nairobi. (c) County Director of Environment, Lamu County. A copy of the report can be downloaded at www.nema.go.ke The National Environment Management Authority invites members of the public to submit oral or written comments within thirty (30) days from the date of publication of this notice to the Director-General, NEMA, to assist the Authority in the decision making process regarding this plan. Comments can also be emailed to dgnema@nema.go.ke MAMO B. MAMO, Ag. Director-General, MR/0744750 National Environment Management Authority.

Dated the 15th July, 2020.

ALICE MWENDWA,

for Registrar of Companies.

Extracted Entities (1)

previous_gazette_ref

5050

Details

Act / Legislation
THE COMPANIES ACT
Reference
No. 17 of 2015
Section
section 897 (3)
Signed By
ALICE MWENDWA
Title
for Registrar of Companies
Date Signed
15th July 2020
Page
21
Extraction Method
regex