Back
DISSOLUTION
100% confidence
via regex
GAZETTE NOTICE NO. 5050
GAZETTE NOTICE NO. 5050
THE COMPANIES ACT
(No. 17 of 2015)
DISSOLUTION
PURSUANT to section 897 (3) of the Companies Act, it is notified
that at the expiration of three (3) months from the date of this gazette,
the names of the under-mentioned companies shall unless cause is
shown to the contrary be struck off the register of companies and the
companies shall be dissolved.
Number Name of Company
CPR/2012/69372
African Travel Company Limited
CPR/2015/2199I3 Amandla Ventures Limited
CPR/2014/167788 Bake Tech East Africa Limited
PVT-KAULX25
Csafrica Link Kenya Limited
CPR/2014/156428 Dawn Africa Construction Company Limited
CPR/2012/89602
Dev International Limited
CPR/2012/87709
Fedha Springs Limited
CPR/2013/95003
Foxglove Holdings Limited
C. 160900
Free World Technologies Limited
CPR/2016/220080 Great Nine Dynasty Limited
CPR/2014/163817 Keremis investments Limited
CPR/2010/32409
Mahek Powertech Limited
C. 139732
Mckinney Rodgers Kenya Limited
CPR/2014/154066 Palm Brooke Company Limited
PVT/2016/000176 Primeserve Enterprises Limited
PVT-AJURRBD
Samil Africa Corporation Limited
PVT-LRUB6B3
Squeaky Clean Waters Limited
CPR/2014/154048 Trade Peak Company Limited
CPR/2012/86147
Tulip International Limited
Dated the 15th July, 2020.
ALICE MWENDWA,
for Registrar of Companies.
GAzErrE NOTICE No. 5051
THE ENVIRONMENTAL MANAGEMENT AND
CO-ORDINATION ACT
(No. 8 of 1999)
THE NATIONAL ENVIRONMENT MANAGEMENT
AUTHORITY
ENVIRONMENTAL IMPACT ASSESSMENT STUDY REPORT
FOR PROPOSED FLOATING FUELING STATION, LAMU
COUNTY
INVITATION OF PUBLIC COMMENTS
PURSUANT to regulation 21 of the Environmental Management
and Coordination (Impact Assessment and Audit) Regulations, 2003,
the National Environment Management Authority (NEMA) has
received an Environmental Impact Assessment Study Report for the
above proposed project.
The proponent, Jaffar Shebe Auni is proposing to construct a
floating fueling station will have the following facilities; Solar panels,
3 storage and access tanks, 2 manholes (I diesel the other petrol), 1
fuel pump pedestal with 2 pumps (petrol and diesel), 4 fuel
interceptors and 1 toilet, 3 fuel steel tanks, 1 spillage sump, 1 manhole,
1 inverter, 1 access to under cabin passage and an attendant's cabin or
office located in Lamu County.
The following are the anticipated impacts and proposed mitigation
measures:
Solid waste Littering the Fuel storage
• Waste
facility and containers and
segregation(provide
increasing fore packaging,
coded bins) and
risk. food
reuse.
packaging and
food remains.
• The management of
the floating fueling
station need to
apply for an
effluent discharge
licence with the
guidance of the
NEMA office.
-Cleaning
-Oil interceptor
-Maintenance of
the drainage
• Minimize energy
consumption.
• Monitor energy use
and set targets for
efficient energy
use.
Psychological, Work related Walk way
security and stress , injuries obstruction.
physical and illness.
health
Poor
ergonomics.
• Maintain
housekeeping to
minimize
congestion.
Environmental Potential Potential
Mitigation Controls
Component Environmental Source of (through EMMP and
Impact Impact
Design)
Lack of
• Maintenance of
signage
working equipment
warning.
to prevent work
Long working
related injuries.
hours.
• Proper signage to
prevent accidents.
• Maintain work
shifts of not more
than 8 hours.
• Provide security
personnel and 24
hour security line.
Neighbour- Psychological conflicts with • Proper
hood conflicts disturbance, other
management,
injury,
interested
organization and
accident.
parties.
sufficient staff,
qualified staff
Sustainability Longevity of Poor
• Maintain supply,
project. housekeeping,
source of income
poor record
for staff and traders
keeping, lack
by maintaining the
of facility
facility, complying
maintenance, with institutional
failure to
regulations and
comply with
laws and good
institutional
organization.
regulations
and laws.
The full report of the proposed project is available for inspection
during working hours at:
(a) Principal Secretary, Ministry of Environment and Forestry,
NHIF Building, Community, P.O. Box 30126-00100,
Nairobi.
(b) Director-General, NEMA, Popo Road, off Mombasa Road,
P.O. Box 67839-00200, Nairobi.
(c) County Director of Environment, Lamu County.
A copy of the report can be downloaded at www.nema.go.ke
The National Environment Management Authority invites
members of the public to submit oral or written comments within
thirty (30) days from the date of publication of this notice to the
Director-General, NEMA, to assist the Authority in the decision
making process regarding this plan.
Comments can also be emailed to dgnema@nema.go.ke
MAMO B. MAMO,
Ag. Director-General,
MR/0744750 National Environment Management Authority.
Dated the 15th July, 2020.
ALICE MWENDWA,
for Registrar of Companies.
Extracted Entities (1)
previous_gazette_ref
5050
Details
- Act / Legislation
- THE COMPANIES ACT
- Reference
- No. 17 of 2015
- Section
- section 897 (3)
- Signed By
- ALICE MWENDWA
- Title
- for Registrar of Companies
- Date Signed
- 15th July 2020
- Page
- 21
- Extraction Method
- regex
Source Gazette
Vol. CXXII No. 142
Published 15th May 2020