Back
OTHER 74% confidence via regex

GAZETTE NOTICE NO. 101

PURSUANT to clause 5 of Part III of the Schedule of Tariffs 2018, notice is given that all prices for electrical energy specified in Part II - (A) of the said Schedule will be liable to a Water Resource Management Authority (WRMA) levy of plus 2.22 Kenya cents per kWh for all meter readings to be taken in January, 2020. Information used to calculate the WRMA levy: Approved WRMA levy for energy purchased from hydropower plants of capacity equal to or above 1MW = 5 Kenya cents per KWh. Units Purchased in October, 2019 Hydropower Plant (Kwh.) Gitaru 90,107,000 Kamburu 37,001,000 Kiambere 98,310,000 Kindaruma 21,532,460 Masinga 1,582,000 Tana 13,057,315 Wanjii - Sagana 1,031,697 Ndula - Turkwel 34,761,860 Gogo 395,068 Sondu Miriu 43,870,000 Sangoro 13,992,480 Regen-Terem 3,253,737 Chania 107,594 Gura 1,265,850 Total units purchased from hydropower plants with capacity equal to or above 1MW = 360,268,061 kWh Total units generated and purchased (G) excluding exports in October, 2019 = 951,704,631 kWh ROBERT PAVEL OIMEKE, MR/0455081 Director-General.

Extracted Entities (1)

previous_gazette_ref

101

Details

Signed By
ROBERT PAVEL OIMEKE
Title
Director-General
Page
9
Extraction Method
regex