GAZETTE NOTICE NO. 16149
GAZETTE NOTICE NO. 16149
THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
(No. 8 of 1999)
ACT
PURSUANT to section 59 of the Environmental Management and
Co-ordination Act, Cap. 387, the National Environment Management
Authority (NEMA) has received an Environmental Impact Assessment
Study Report for the above proposed project.
The proponent, William Omondi Muthama, proposes to develop a
high-rise residential development apartment. The building will consist
of 3No. basements, ground floor, 1st-24th floors and a rooftop. The
development will feature a total of 302 residential units, comprising 44
one-bedroom units, 44 one-bedroom executive units, 132 two-
bedroom units and two 5-bedroom penthouse units. The 23rd floor will
include various resident amenities such as meeting area, gym area,
kids playing area and rooftop level will accommodate a restaurant and
roof garden alongside residential units. Additionally, the project will
provide a total of 206 parking lots on plot L.R. No. Nairobi block
7/430 along General Mathenge Road situated in Westland Parklands/
Highridges, Nairobi City County.
The following are the anticipated impacts and proposed mitigation
measures:
Impacts Proposed Mitigation Measures
Soil erosion • Control earthworks.
• Install drainage structures to control
flow of storm water.
• Ensure and management of excavation
activities.
Loss of vegetation • Only area earmarked for development
should be cleared.
• Plant trees, shrubs and flowers on
remaining open spaces.
Changes in
hydrology/
impended
drainage/deep
excavations
• Proper installation of drainage
structures.
• Install cascades to break the impact of
water flowing in the drains.
• Ensure efficiency of drainage structures
through proper design and maintenance.
• Provide gratings to the drainage
channels.
• A geotechnical survey shall be
conducted and the recommendations
thereof followed. There shall be no
blasting during excavation.
• A methodology for excavation shall be
generated as required by NCA.
Air pollution • Stockpiles of earth should be sprayed
with water or covered during dry
seasons.
• Provide dust masks for personnel in
dusty areas.
• Sensitize construction workers on
pollution control measures.
• Cover all trucks hauling soil, sand and
other loose materials.
Noise pollution • Install suitable barriers to shield
compressors and other small stationary
equipment where necessary.
• Display signs to indicate construction
activities.
• Maintain all equipment.
• The working hours should be in line
with NEMA licensing conditions.
• Adhere to provisions of Noise
Prevention and Control Rules 2005,
Legal Notice no. 24 regarding noise
limits at the workplace as well as
NEMA Noise Excessive Vibration
Pollution Control Regulations, 2000.
Public health,
occupational
health and safety
• Train staff/workers on occupational
health and safety.
• Provide full protective gear and
workmen’s compensation cover in
addition to the right tools and
operational instructions and manuals
during construction.
• Design of sewerage system should be as
provided in the plans and should be
constructed to approved size and
design, standard and of approved
materials.
• Ensure use of standard construction
materials and to the specifications.
Avoid undesirable, substandard,
hazardous or unauthorized materials
during construction and maintenance.
• Sensitized staff on social/health issues
such as drugs.
Road traffic
disruption
• No overloading of trucks and good
driving practices to be practiced.
• Suitable junction/access point to be
provided.
• Use of appropriate and legible signage.
• Employment of formal flagmen/ women
to ensure the public safety.
7544 7544
• Follow the recommendations of the
traffic management plan.
Security and social
impacts
• Provision of security guards, CCTV
cameras, security lights and other
security apparatus during the entire
project cycle.
• Construction work timings shall only in
line with the NEMA licensing
conditions.
Protection of the
Nairobi River
• All wastewater from the toilets shall be
discharged into the sewer system
effectively.
• Observe, protect and conserve the
riparian reserve in compliance with the
water Act 2016 and Water Reserve
Management Rules 118 (1).
• The drainage channel discharging storm
water into the river shall be provided
with effective and adequate screens to
filter off any solid waste and should be
regularly removed and appropriately
disposed.
Increased water
usage
• Make use of roof catchments to provide
water i.e. for general purpose.
• An alternative water source shall be
provided. The proponent shall drill a
borehole at the proposed site.
• Management of water usage. Avoid
unnecessary wastage.
• Recycling of water at the construction
phase where possible.
Increased
generation of
waste
• Adopt waste minimization at source.
• Monitoring the fate of disposed wastes
to ensure they are legally land filled at a
recognized controlled site.
• Adhering to Waste Management
Regulations of 2006
The full report of the proposed project is available for inspection
during working hours at:
(a) Principal Secretary, Ministry of Environment, Climate
Change and Foresty, NHIF Building, 12th Floor, Ragati
Road, Upper Hill, Upper Hill, P.O. Box 30126–00200,
Nairobi.
(b) Director-General, NEMA, Popo Road, off Mombasa Road,
P.O. Box 67839–00200, Nairobi.
(c) County Director of Environment, Nairobi City County.
A copy of the EIA report can be downloaded at www.nema.go.ke
The National Environmental Management Authority, invites members
of the public to submit oral or written comments within thirty (30)
days from the date of publication of this notice to the Director-
General, NEMA to assist the Authority in the decision making process
for this project. Kindly quote ref. No. NEMA/ENVIS/SR/00262.
Comments can also be e-mailed to dgnema@nema.go.ke
MAMO B. MAMO,
MR/7787833 Director-General.
Dated the 7th November, 2025.
MAMO B. MAMO,
Director-General.
Extracted Entities (1)
previous_gazette_ref
16149
Details
- Act / Legislation
- THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
- Reference
- No. 8 of 1999
- Section
- section 59
- Signed By
- MAMO B. MAMO
- Title
- Director-General
- Date Signed
- 7th November 2025
- Page
- 39