Back
ACT 100% confidence via regex

GAZETTE NOTICE NO. 1176

GAZETTE NOTICE NO. 1176

THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT

(Cap. 387)

ACT


PURSUANT to section 59 of the Environmental Management and Coordination Act CAP 387, the National Environment Management Authority (NEMA) has received an Environmental Impact Assessment Study Report for the above proposed project. The proponent, International Housing Solutions, proposes to construct a single L-shaped 16-storey residential apartments block comprising a total of 240 units (144 No. one bedroom and 96 No. two bedroom units measuring 40m2 and 60m2 respectively), internal access lanes/roads, on-grade parking, children’s play area, seating, turf lawn, perimeter planting, generator yard, solid waste area, transformer, associated amenities and facilities on plot L.R. No. Dagoretti/Riruta/6004(Nairobi Block 66/6004) along Ndwaru Road, Dagoretti South Sub-County, Nairobi County. The following are the anticipated impacts and proposed mitigation measures: Impacts Proposed Mitigation measures Biodiversity impacts • Preserve existing native vegetation on the site outside the project footprint. • Utilize native plant species in landscaping to replace lost trees and promote biodiversity. Impacts Proposed Mitigation measures Stormwater and drainage alteration • Implement sustainable urban drainage systems including permeable paving, soakaways, infiltration trenches, silt traps, and gentle site grading to manage runoff and prevent flooding/erosion. • Maintain and utilise rooftop rainwater harvesting systems to intercept, store, and reduce stormwater entering the drainage network during in all phases. Air pollution • Enclose the site with dust-proof net during construction. • Undertake dust control measures such as using dust suppressants. • Using efficient machines with low emission technologies. Noise and excessive vibrations • Erect suitable and adequate noise barriers during construction. • Use construction equipment/machinery that meet noise emission and vibration standards. Solid waste generation • Use of an integrated solid waste management system. • Contract a NEMA licensed waste management firm for disposal. Increased demand for water and energy • Harvest rainwater and use water from the own borehole to supplement water from NCWSC mains. • Install water efficient appliances. • Consider integrating renewable energy sources like solar for lighting and heating. Occupational health and safety • Ensure proper training and supervision for workers on occupational health and safety. • Require all construction workers to wear appropriate PPE. • Establish fire safety procedures (fire extinguishers, emergency exits, etc.) • Provide first aid kits at strategic places on the site. Traffic management • Establish designated construction site entrance and exit for construction traffic. • Install proper signage (warnings, detours, speed limits within and around the site. • Ferry building materials during off-peak hours Gender-Based Violence; Sexual Exploitation and Abuse and Sexual Harassment • Mandatory awareness creation for workers on required lawful conduct in Loresho community and legal consequences for failure to comply with laws. • Mandatory signing and implementation of code of conduct for the workers. Cultural heritage • Prioritizing the preservation of the Mugumo trees and as many other existing indigenous trees as possible. • Implement Chance Finds Procedures. Carbon footprint • Use low-carbon, locally sourced construction materials and reduce construction waste including recycled/low-impact materials and on-site recycling to minimise embodied carbon and transport emissions. • Improve building energy efficiency and integrate renewable energy systems through insulation, energy-efficient appliances, natural lighting/ventilation, and rooftop solar. Emergency preparedness and evacuation procedures • Design suitable documented emergency preparedness and evacuation procedures to be used during any emergency. A full report of the proposed project is available for inspection during working hours The full report of the proposed project is available for inspection during working hours at: (a) Director General, NEMA, Popo Road, off Mombasa Road, P.O. Box 67839–00200, Nairobi. (b) County-Director of Environment, Nairobi City County. 30th January, 2026 THE KENYA GAZETTE A copy of the EIA report can be downloaded at www.nema.go.ke The National Environmental Management Authority, invites members of the public to submit oral or written comments within thirty (30) days from the date of publication of this notice to the Director General, NEMA to assist the Authority in the decision making process for this project. Comments can also be e-mailed to dgnema@nema.go.ke MAMO B. MAMO, Director-General, MR/8081765 National Environment Management Authority.

Dated the 30th January, 2026.

MAMO B. MAMO,

Director-General, National Environment Management Authority.

Extracted Entities (1)

previous_gazette_ref

1176

Details

Act / Legislation
THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
Reference
Cap. 387
Section
section 59
Signed By
MAMO B. MAMO
Title
Director-General, National Environment Management Authority
Date Signed
30th January 2026
Page
46
Extraction Method
regex