GAZETTE NOTICE NO. 3567
PURSUANT to Clause 5 of Part III of the Schedule of Tariffs, 2023, Notice is given that all prices for Electrical Energy specified in Part II -(A) of the said Schedule will be liable to a Water Resource Management Authority (WRMA) Levy of Plus 1.22 cents per kWh for all meter readings taken in March, 2026.
Hydropower Plant Units Purchased in February 2026 (KWh)
Gitaru 56,695,520
Kamburu 29,583,690
Kiambere 65,594,470
Kindaruma 13,648,820
Masinga 13,515,620
Tana 3,714,390
Wanjii 2,342,790
Sagana 452,672
Turkwel 41,859,000
Gogo 439,197
Sondu Miriu 12,411,243
Sangoro 4,457,375
Information used to calculate the WRMA Levy:
Approved WRMA levy for energy purchased from hydropower plants of capacity equal to or above 1MW = 5.00 Kenya cents per KWh
Total units purchased from hydropower plants with capacity equal to or above 1MW = 244,714,787kWh
Total Units Generated and Purchased (G) Excluding exports in February 2026 = 1,199,384,361kWh
DANIEL KIPTOO BARGORIA, MR/8081507 Director-General.
1072 1072
Extracted Entities (1)
previous_gazette_ref
3567
Details
- Signed By
- DANIEL KIPTOO BARGORIA
- Title
- Director-General
- Date Signed
- 13th March 2026
- Page
- 35
- Extraction Method
- regex
Source Gazette
Vol. CXXVIII No. 45 (SUPPLEMENT)
Published 13th March 2026