GAZETTE NOTICE NO. 4163
GAZETTE NOTICE NO. 4163
THE WATER ACT
(No. 43 of 2016)
APPROVAL
under the powers granted by section 72 (1) (b) and (2) of the Water Act, 2016, has approved the regular tariff adjustment for the area served by Garissa Water and Sewerage Company Limited (GAWASCO).
Garissa Water and Sewerage Company Limited (GAWASCO) applied to the Water Services Regulatory Board (WASREB) for review of water services tariffs, for the period 2025/2026 to 2028/2029 as per section 72 (1) b of the Water Act 2016.
Public consultation on the GAWASCO application was carried out in accordance with the requirements of section 139 of the Water Act 2016.
Having considered the application, the written and oral submissions by all stakeholders and the current data, WASREB has determined that an upward tariff review is justified for GAWASCO to improve service delivery, operate sustainably and protect consumer interests by meeting the tariff conditions attached to the tariff.
WASREB hereby gives a one-month notice from the date of this communication to all existing and potential customers of GAWASCO that the structure of approved tariffs for water services for the four financial years 2025/2026, 2026/2027, 2027/2028 and 2028/2029 shall be as follows:
1.0 Approved Tariff Structure
1.1 Water Tariff Structure for the period 2025/2026 to 2028/2029
Consumer Categories Consumption Block (m3) Approved Tariff (KSh./m3)
Domestic/Residential 1-6 80
7-20 120
21-50 135
51-100 160
101-300 180
>300 220
Multi-Dwelling Units Per M3 120
Commercial/Industrial 1-50 135
51-100 160
101-300 180
>300 220
Government/Institutions 1-50 135
51-100 160
101-300 180
>300 220
Public Schools, Colleges, and
Universities
1-600 110
601-1200 120
>1200m3 130
Unique Consumer Categories Per M3 50
Customers with non-functional meters shall be billed based on the average of the last three months’ bills.
1.2 Sewerage Tariff Structure for the period 2025/2026 to 2028/2029.
(a) Consumers with a Water Connection
(i) Sewerage will be charged at 75% of the water volumes, billed at the tariff for water specified (in 1.1) above, for all customer categories.
(ii) Disconnected water accounts shall be charged based on the average of the last three months’ sewerage charges before the disconnection.
(b) Consumers without a Water Connection
Sewerage consumers without a water connection shall be charged as follows:
(i) Single dwelling Domestic unit: Ksh. 300 Per Month.
(ii) 75% of the volume of water consumed as per the metered source of water at the rates specified (in 1.1) above.
1236 1236
1.3 Indexation
The utility’s approved tariffs for water and sewerage shall be eligible for annual indexation, as per the regulations of the Water Services
Regulatory Board (WASREB). The inflation adjustment shall come into effect every July of the tariff period commencing July 2027.
1.4 Miscellaneous Charges
These shall be as follows:
Item/ Service Charge (Ksh.)
Water Deposit
Category of consumer
Domestic 2,500
Retail shops less than 10m3 3,000
Retail shops with more than 10m3 3,500
Bar and restaurants with less than 15 m3 4000
Bar and restaurants more than 15 m3 6,000
Hotel class “A” and “B” with less than 150 m3 12,000
Hotel class “A” and “B” with more than 150 m3 15000
Hotel class “C” and ‘D’, with less than 150 m3 18000
Hotel class “C” and ‘D’ more than 150 m3 20,000
Hospitals and Health centres more than 150 m3 20,000
Hospitals and Health centres with less than 150 m3 12,000
Schools and other institutions have more than 200 m3 20,000
Schools and other institutions with less than 200 m3 10,000
Minor construction sites of more than 200 m3 15,000
Major construction sites with more than 300 m3 50,000
Light industries with less than 200 m3 30,000
Medium industries between 200 m3 and 300 m3 50,000
Heavy industries of more than 300 m3 100,000
Water Kiosks 5,000
Customers with only a sewer connection are to be charged a deposit equivalent to a water connection
Other Charges
Service
New water connection fee – Connection size: ½ inch to 1 inch 2,500
New water connection fee – Connection size: 1.5 inches to 3 inches 7,500
New water connection fee – Connection size above 3inches 15,000
Water Reconnection fee – at meter point 1,000
Water Reconnection fee – at mains 5,000 and double deposit
Tanker – 8000 and 16,000 litres 2,500 and 5,000, respectively, per tanker within GAWASCO’s area for all consumers
Sale of water per M3 at Bowsing Point (own tanker) KSh. 120
Replacement of stolen or damaged meters 100% of the market cost of the meter
Meter testing on request 500
Sewer Connection- Residential/ Domestic 5,000
Sewer Connection- Commercial, Government, Schools, Universities, and
Colleges
7,500
Sewer Connection- Industrial 15,000
Private sewer unblocking 2,500
Leak detection services 1,000
Sewer Reconnection fee 15,000
Statement of account fees 200
For cutting off the supply at the request of the consumer 200
For turning on the supply other than in respect of a first connection 200
Exhauster Services (Company Exhauster) 5,000 for other customers and 4,000 for informal settlements
Private Exhausters (Dumping into the company’s sewer system) 15,000 per truck per month
Penalties
Illegal water connection -Commercial, Industry, Construction (Fraud) 100,000 plus estimated consumption during the period of illegality
Illegal water connection (Fraud) – Domestic 30,000 plus estimated consumption during the period of the illegality
Overcharging (fraud) at the water kiosk 15,000
Illegal sewer connection- Commercial, Industry, Construction 100,000
Illegal sewer connection- Domestic, Government, Schools, Universities and Colleges
30,000
Self-reconnection after cut-off for non-payment 5,000, and billing to be backdated from the date of the cut-off
Surcharge for tampering with meters (this includes meter removal, reversing of meter, etc)
5,000
Surcharge for direct suction of water from the supply line using a pump 10,000
2.0 Cost Structure
2.1 Cost Summary
Below is the summary of the projected annual cost structure that makes up the total costs to be incurred by GAWASCO during the tariff period:
Expenditure Item 2024/2025 2025/2026 2026/2027 2027/2028 2028/2029
Operations 244,386,673 268,971,955 277,371,062 282,318,042 283,403,695
Maintenance 24,801,886 58,775,3276 63,998,078 69,710,365 75,959,505
Regulatory Levy 12,293,073 17,161,502 22,987,106 23,612,994 23,904,008
Total O&M Costs 281,481,632 873,886,733 364,356,246 375,641,401 383,267,208
19th March, 2026 THE KENYA GAZETTE
Investment Costs 2,500,000 9,520,000 49,078,496 63,593,852 63,593,852
Debt Repayment - 81,922,205 88,608,970 95,837,399
Total Costs 283,981,632 354,428,783 495,356,947 527,844,223 542,698,459
Total Billing (KShs) 307,326,833 429,037,551 574,677,643 590,324,850 597,600,199
Collection Efficiency (%) 70% 85% 90% 95% 95%
Projected Revenue 215,128,783 364,681,918 517,209,878 560,808,607 567,720,189
O&M Cost Coverage 76% 106% 142% 149% 148%
Total Cost Coverage 76% 103% 104% 106% 105%
3.0 Conditions attached to the tariff approval.
The conditions attached to this approval which shall form part of the license conditions of GAWASCO are:
3.1 Service Delivery Conditions attached to the Tariff
Target 2024/2025 2025/2026 2026/2027 2027/2028 2028/2029
Water Coverage (%) 62% 65% 66% 67% 68%
Water quality standards (%) 100%
Personnel Expenditure as % of O&M 36% 31% 30% 30% 30%
Non-Revenue Water 32% 28% 27% 26% 25%
Hours of Supply (Hrs.) 22 22 22 22 23
Staff per 1000 connections 10 9 8 7 7
Metering ratio (%) 64% 80% 90% 100% 100%
Collection Efficiency (%) 65% 85% 90% 95% 95%
Resale at kiosk Kshs. 5.00 per 20l jerry can
Other Conditions
3.2 Annual budgets: The WSP shall adhere to the budgetary levels set in the tariff.
3.3 Surpluses: The surpluses realised during the tariff period shall be used to implement priority service delivery capital projects approved by
WASREB
3.4 Reporting: The utility shall submit to WASREB a quarterly performance report in the format provided
3.5 Creation of distinct water and sewer cost centres: GAWASCO shall create separate water and sewer cost centres and maintain a distinct record of operations of the two centres
3.6 Metering: GAWASCO shall progressively enhance the metering ratio to attain 100% as per condition (3.1) above
3.7 Regulatory Levy: The utility is to pay a monthly regulatory levy based on 4% of turnover, which is inclusive of billing for other services and interest income earned.
3.8 Investments: The utility shall undertake the investments in Appendix 1:
4. Penalty notice
4.1 Take note that failure of an Accounting Officer to administer this tariff and the conditions attached to it is an offence subject to section 196
(2) of the Public Finance Management Act 2012, 117 (1) (aa) of the County Governments Act 2012, Sections 147 and 158 of the Water Act
2016, and Regulations 46 (1), 101 and 105 of the Water Services Regulations 2025.
4.2 Failure to comply with the tariff and conditions attached to it amounts to a breach of licence conditions and shall attract sanctions pursuant to section 92 of the Water Act 2016, including:
(i) Payment of a penalty.
(ii) Suspension or cancellation of the licence.
(iii) Placement of the utility under Special Regulatory Regime.
(iv) Prosecution.
Appendix 1: PROPOSED INVESTMENTS FROM INTERNALLY GENERATED FUNDS FOR GAWASSCO
FY 2026/2027
Activity ITEM Financial
Year
Quantity Unit Price
(KSh.)
Amount (KSh.)
Metering
Water Meters -New Connections +
Fittings
26/27 No. 109 7,128
776,952.00
Water Meters - The Existing
Unmetered Connections+Fittings
26/27 No. 1,250 7,128
8,910,000.00
Water Meters -New Connections +
Fittings
26/27 No. 163 7,128
1,161,864.00
Water Meters - The Existing
Unmetered Connections Fittings
26/27 No. 1,250 7,128
8,910,000.00
Sub-Total Metering Sub-Total Metering Sub-Total Metering 26/27
19,758,816.00
Nrw Management
Bulk/ Production Master Meters and Works
26/27
DN 400 Mechanical Water Meter 26/27 1 480,000.00
480,000.00
DN 300 Mechanical Water Meter 26/27 1 410,000.00
410,000.00
DN 250 Mechanical Water Meter 26/27 1 330,000.00
330,000.00
1238 1238
Activity ITEM Financial
Year
Quantity Unit Price
(KSh.)
Amount (KSh.)
DN 200 Mechanical Water Meter/to consider changing the type(ultrasonic)
26/27 2 300,000.00
600,000.00
DN 250 Mechanical Water Meter 26/27 1 330,000.00
330,000.00
DN 200 Mechanical Water Meter 26/27 2 300,000.00
600,000.00
Construction of 4 bulk water meter chamber
Construction and installation of series bulk meters and production meter chambers (2
Chambers every year)
26/27
100,000.00
Construction of 4 bulk water meter chambers
Construction and installation of series bulk meters and production meter chambers ( 2
Chambers every year)
26/27 2 50,000.00
100,000.00
SUB-TOTAL-Bulk/ Production Master Meters and
Works
26/27
2,950,000.00
DMA Master Meters and Works 26/27
DN 250 Electromagnetic Water
Meter
Township Zone
(10" 3pcs), 26/27 1
330,000.00
DN 200 Electromagnetic Water
Meter
Township Zone (8"
4pcs), Iftin Zone(8"
2pcs )
26/27 2
600,000.00
DN150 Single Jet AMR-Enabled
Meter
Township Zone (6"
2pcs), Galbet Zone
(6" 1pc), Waberi
Zone (6'' 2pcs), Iftin Zone(6" 9pcs)
26/27
1,250,000.00
NRW
MANAGEMENT
DN100 Single Jet AMR-Enabled
Meter
Galbet Zone (4"
5pcs), Waberi Zone
(4" 5pcs), Iftin
Zone(4" 5pcs)
26/27
550,000.00
DN75 Single Jet AMR-Enabled
Meter
Galbet Zone (3"
3pcs), Waberi Zone
(3" 2pcs), Township Zone (3"
1pc)
26/27
340,000.00
DN63 Single Jet AMR Enabled
Meter
26/27
90,000.00
DN50 Single Jet AMR-Enabled
Meter
26/27
75,000.00
Gate valves/ Sluice valves 10 will be bought and installed per year
26/27
400,000.00
DMA creation and Isolation physical works
9 DMAs will be created for the three years, with 3 DMAs being created each year
26/27
600,000.00
Construction of DMA meter chambers
Construction and installation of DMA
Meter chambers
26/27
680,000.00
Construction of DMA valve chambers
Construction and installation of DMA
Valve chambers
26/27
400,000.00
DN 250 Electromagnetic Water
Meter
Township Zone
(10" 3pcs), 26/27 3 330,000.00
330,000.00
DN 200 Electromagnetic Water
Meter
Township Zone (8"
4pcs), Iftin Zone(8"
2pcs )
26/27 2 300,000.00
600,000.00
DN150 Single Jet AMR-Enabled
Meter
Township Zone (6"
2pcs), Galbet Zone
(6" 1pc), Waberi
Zone (6'' 2pcs), Iftin Zone(6" 9pcs)
26/27 4 250,000.00
1,000,000.00
DN100 Single Jet AMR-Enabled
Meter
Galbet Zone (4"
5pcs), Waberi Zone
(4" 5pcs), Iftin
Zone(4" 5pcs)
26/27 5 110,000.00
550,000.00
19th March, 2026 THE KENYA GAZETTE
Activity ITEM Financial
Year
Quantity Unit Price
(KSh.)
Amount (KSh.)
DN75 Single Jet AMR-Enabled
Meter
Galbet Zone (3"
3pcs), Waberi Zone
(3" 2pcs), Township Zone (3"
1pc)
26/27 2 170,000.00
340,000.00
DN63 Single Jet AMR Enabled
Meter
26/27 1 90,000.00
90,000.00
DN50 Single Jet AMR-Enabled
Meter
26/27 1 75,000.00
75,000.00
DN25 Single Jet AMR-Enabled
Meter
26/27 1 30,000.00
30,000.00
Gate valves/ Sluice valves 10 will be bought and installed per year
26/27 10 40,000.00
400,000.00
DMA creation and Isolation physical works
9 DMAs will be created for the three years, with 3 DMAs being created each year
26/27 3 200,000.00
600,000.00
NRW
MANAGEMENT
Construction of DMA meter chambers
Construction and installation of DMA
Meter chambers
26/27 16 40,000.00
640,000.00
Construction of DMA valve chambers
Construction and installation of DMA
Valve chambers
26/27 10 40,000.00
400,000.00
SUB-TOTAL-DMA Master Meters and Works
SUB-TOTAL-
DMA Master
Meters and Works
26/27
10,370,000.00
DMA Consumer Cold water meters and Accessories
DN 20mm AMR enabled
Volumetric Cold-Water Meter -
R200/R315 Composite body c/w accessories as per attached specifications (Replace stopped meters, faulty, damaged, aged, or stolen meters ).
900 metes in a period of 3 years, which is 300 per year. This is important for the elimination of commercial losses due to stopped, aged, and faulty meters in the field, which record an inaccurate reading, leading to a loss of revenue per month that would have been collected.
26/27
1,800,000.00
Portable Water Meter Test Kit It is compact, lightweight weight and accurate, which can provide you with the data for a water meter replacement program for the improvement of non-revenue management.
26/27
45,000.00
Water Meter Anti-Tampering
Plastic Seals.
Seal all high- consumer meters with tamper-proof seals
26/27
150,000.00
DN 20mm AMR enabled
Volumetric Cold-Water Meter -
R200/R315 Composite body c/w accessories as per attached specifications (Replace stopped meters, faulty, damaged, aged, or stolen meters ).
900 metes in a period of 3 years, which is 300 per year. This is important for the elimination of commercial losses due to stopped, aged and faulty meters in the field, which record an inaccurate reading, leading to loss of revenue per month that would have been collected.
26/27 300 6,000
1,800,000.00
1240 1240
Activity ITEM Financial
Year
Quantity Unit Price
(KSh.)
Amount (KSh.)
Portable Water Meter Test Kit It is compact, lightweight weight and accurate, which can provide you with the data for a water meter replacement program for the improvement of non-revenue management.
26/27 1 45,000
45,000.00
NRW
MANAGEMENT
Water Meter Anti-Tampering
Plastic Seals.
Seal all high- consumer meters with tamper-proof seals
26/27 400 500
200,000.00
SUB-TOTAL-DMA Consumer Cold water meters and
Accessories
26/27
4,040,000.00
Pressure data loggers, Pressure
Gauges and Pressure Reducing
Valves
26/27
Pressure data loggers with 2 output channels (max pressure 10 bars)
Currently, the utility does not have pressure loggers essential for defining supply pressure regimes where high pressures may be the cause of leakages. Pressure management is critical in NRW management.
26/27 3
300,000.00
Pressure data loggers with 2 output channels (max pressure 20 bars)
26/27 3
50,000.00
NRW
MANAGEMENT
Veron Moris analogue calibrated
Pressure Gauges with up to 20Bars and have plotter paper.
Some pumping stations have no pressure gauges, which is essential for pump efficiency monitoring and data gathering.
26/27 2
150,000.00
Install Water Pressure Gauges Installation and replacement of
Water Pressure
Gauges. A total of
120 in 4 years
26/27 120
200,000.00
Pressure data loggers with 2 output channels (max pressure 10 bars)
Currently, the utility does not have pressure loggers, essential for defining supply pressure regimes where high pressures may be the cause of leakages. Pressure management is critical in NRW management.
26/27
200,000.00
Pressure data loggers with 2 output channels (max pressure 20 bars)
26/27
300,000.00
Veron Moris analogue calibrated
Pressure Gauges with up to 20Bars and has plotter paper.
Some pumping stations have no pressure gauges, which is essential for pump efficiency monitoring and data gathering.
26/27
50,000.00
Install Water Pressure Gauges Installation and replacement of
Water Pressure
Gauges. A total of
120 in 4 years
26/27
150,000.00
19th March, 2026 THE KENYA GAZETTE
Activity ITEM Financial
Year
Quantity Unit Price
(KSh.)
Amount (KSh.)
SUB-TOTAL-Pressure data loggers, Pressure Gauges and Pressure Reducing Valves
26/27 - -
1,400,000.00
NRW MANAGEMENT TOTAL 26/27 - -
18,760,000.00
REHABILITATION
WORKS
Rehabilitation of Boreholes
(Flushing, Flood proofing, Disinfecting the borehole draw pipe, pump, and motor replacement)
3,967,740 26/27 No. 2 3,967,740
7,935,480.00
Pipe replacement of 3/4 “ uPVC pipe
420 26/27 m. 2,000 420
840,000.00
Replacement Sewerage Manhole covers
15,000 26/27 No. 40 15,000
600,000.00
Inline dosing points for
Chlorination
592,100 26/27 No. 2 592,100
1,184,200.00
Total 592,100.00 26/27 10,559,680.00
GRAND TOTAL - - 49,078,496.00
FY 2027/2028
Item Financial
Year
Quantity Unit Price
(KSh.)
AMOUNT
(KSHS) Bulk/ Production Master Meters and Works
NRW
MANAGEMENT
DN 200 Mechanical Water Meter 27/28
300,000.00
SUB-TOTAL 27/28
300,000.00
DMA Master Meters and Works 2728
DN 250 Electromagnetic Water Meter Township Zone (10" 3pcs), 27/28
330,000.00
DN 200 Electromagnetic Water Meter Township Zone (8" 4pcs), Iftin
Zone(8" 2pcs )
27/28
600,000.00
DN150 Single Jet AMR-Enabled
Meter
Township Zone (6" 2pcs), Galbet Zone (6" 1pc), Waberi
Zone (6'' 2pcs), Iftin Zone(6"
9pcs)
27/28
1,250,000.00
DN100 Single Jet AMR-Enabled
Meter
Galbet Zone (4" 5pcs), Waberi
Zone (4" 5pcs), Iftin Zone(4"
5pcs)
27/28
550,000.00
DN75 Single Jet AMR-Enabled Meter Galbet Zone (3" 3pcs), Waberi
Zone (3" 2pcs), Township
Zone (3" 1pc)
27/28
340,000.00
DN63 Single Jet AMR Enabled Meter 27/28
90,000.00
DN50 Single Jet AMR-Enabled Meter 27/28
75,000.00
Gate valves/ Sluice valves 10 will be bought and installed per year
27/28
400,000.00
DMA creation and Isolation physical works
9 DMAs will be created for the three years, with 3 DMAs being created each year
27/28
600,000.00
Construction of DMA meter chambers
Construction and installation of
DMA Meter chambers
27/28
680,000.00
Construction of DMA valve chambers Construction and installation of
DMA Valve chambers
27/28
400,000.00
SUB-TOTAL 27/28 5,315,000.00
DMA Consumer Cold water meters and Accessories 2728
DN 20mm AMR enabled Volumetric
Cold Water Meter -R200/R315
Composite body c/w accessories as per attached specifications (Replace stopped meters, faulty, damaged, aged, or stolen meters ).
900 metes in a period of 3 years, which is 300 per year.
This is important for the elimination of commercial losses due to stopped, aged, and faulty meters in the field, which record an inaccurate reading, leading to a loss of revenue per month that would have been collected.
27/28
1,800,000.00
Water Meter Anti-Tampering Plastic
Seals.
Seal all high-consumer meters with tamper-proof seals
27/28
150,000.00
SUB-TOTAL 27/28
-
-
1,950,000.00
Pressure data loggers, Pressure Gauges and Pressure Reducing Valves 2728
Pressure data loggers with 2 output channels (max pressure 10 bars)
Currently, the utility does not have pressure loggers essential
27/28
200,000.00
1242 1242
Item Financial
Year
Quantity Unit Price
(KSh.)
AMOUNT
(KSHS)
Pressure data loggers with 2 output channels (max pressure 20 bars) for defining supply pressure regimes where high pressures may be the cause of leakages.
Pressure management is critical in NRW management.
27/28
300,000.00
Veron Moris analog calibrated
Pressure Gauges with up to 20Bars and has plotter paper.
Some pumping stations have no pressure gauges, which is essential for pump efficiency monitoring and data gathering.
27/28
50,000.00
Install Water Pressure Gauges Installation and replacement of
Water Pressure Gauges. A total of 120 in 4 years
27/28
150,000.00
SUB-TOTAL 27/28
-
-
700,000.00
27/28
NRW MANAGEMENT TOTAL 27/28 - -
8,265,000.00
METERING Water Meters -New Connections +
Fittings
7,128 27/28 No. 541 7,128
3,856,248.00
METERING Water Meters - The Existing
Unmetered Connections Fittings
7,128 27/28 No. 1,478 7,128
10,535,184.00
SUB-TOTAL
METERING
SUB-TOTAL METERING SUB-TOTAL METERING 27/28
14,391,432.00
REHABILITATION
WORKS
Rehabilitation of Boreholes (Flushing, Flood proofing, Disinfecting the borehole draw pipe, pump, and motor replacement)
3,967,740 27/28 No. 2 3,967,740
7,935,480.00
Pipe replacement of 3/4 “ uPVC pipe 420 27/28 m. 2,000 420 840,000.00
Replacement Sewerage Manhole
Covers
15,000 27/28 No. 40 15,000 600,000.00
Inline dosing points for Chlorination 592,100 27/28 No. 2 592,100 1,184,200.00
Rehabilitation of Boreholes (Flushing, Flood proofing, Disinfecting the borehole draw pipe, pump, and motor replacement)
27/28 No. 6 3,967,740 23,806,440.00
Pipe replacement of 3/4 " uPVC pipe 27/28 m. 3,000 420 1,260,000.00
Pipe replacement of 1" uPVC pipe 27/28 m. 500 420 210,000.00
Pipe replacement of 1 1/2" uPVC pipe 27/28 m. 500 840 420,000.00
Pipe replacement of 2" uPVC pipe 27/28 m. 1,000 1,210 1,210,000.00
Pipe replacement of 3" uPVC pipe 27/28 m. 500 2,490 1,245,000.00
Replacement Sewerage Manhole
Covers
27/28 No. 30 15,000 450,000.00
Inline dosing points for Chlorination 27/28 No. 3 592,100 1,776,300.00
SUB-TOTAL -REHABILITATION WORKS Sub-total -rehabilitation works 27/28 40,937,420.00
GRAND TOTAL 27/28 63,593,852.00
FY 2028/2029
Item Financial
Year
Quantity Unit Price
(KSh.)
Amount (KSh.)
Bulk/ Production Master Meters and Works 28/29
NRW
MANAGEMENT
DN 200 Mechanical Water Meter 28/29 300,000.00
SUB-TOTAL 28/29 300,000.00
DMA Master Meters and Works 28/29
DN 250 Electromagnetic Water Meter Township Zone (10"
3pcs), 28/29 330,000.00
DN 200 Electromagnetic Water Meter Township Zone (8"
4pcs), Iftin Zone(8" 2pcs
)
28/29 600,000.00
DN150 Single Jet AMR-Enabled Meter Township Zone (6"
2pcs), Galbet Zone (6"
1pc), Waberi Zone (6''
2pcs), Iftin Zone(6"
9pcs)
28/29 1,250,000.00
DN100 Single Jet AMR-Enabled Meter Galbet Zone (4" 5pcs), Waberi Zone (4" 5pcs), Iftin Zone(4" 5pcs)
28/29 550,000.00
DN75 Single Jet AMR-Enabled Meter Galbet Zone (3" 3pcs), Waberi Zone (3" 2pcs), Township Zone (3" 1pc)
28/29 340,000.00
DN63 Single Jet AMR Enabled Meter 28/29 90,000.00
DN50 Single Jet AMR-Enabled Meter 28/29 75,000.00
Gate valves/ Sluice valves 10 will be bought and installed per year
28/29 400,000.00
19th March, 2026 THE KENYA GAZETTE
Item Financial
Year
Quantity Unit Price
(KSh.)
Amount (KSh.)
DMA creation and Isolation physical works
9 DMAs will be created for the three years, with
3 DMAs being created each year
28/29 600,000.00
Construction of DMA meter chambers Construction and installation of DMA
Meter chambers
28/29 680,000.00
Construction of DMA valve chambers Construction and installation of DMA
Valve chambers
28/29 400,000.00
SUB-TOTAL 28/29 5,315,000.00
DMA Consumer Cold water meters and Accessories 2829
DN 20mm AMR enabled Volumetric
Cold Water Meter -R200/R315
Composite body c/w accessories as per attached specifications (Replace stopped meters, faulty, damaged, aged, or stolen meters ).
900 metes in a period of
3 years, which is 300 per year. This is important for the elimination of commercial losses due to stopped, aged, and faulty meters in the field, which record an inaccurate reading, leading to a loss of revenue per month that would have been collected.
28/29 1,800,000.00
Water Meter Anti-Tampering Plastic
Seals.
Seal all high-consumer meters with tamper- proof seals
28/29 150,000.00
SUB-TOTAL 28/29 - - 1,950,000.00
Pressure data loggers, Pressure Gauges and Pressure Reducing
Valves
Pressure data loggers with 2 output channels (max pressure 10 bars)
Currently, the utility does not have pressure loggers essential for defining supply pressure regimes where high pressures may be the cause of leakages.
Pressure management is critical in NRW management.
28/29 200,000.00
Pressure data loggers with 2 output channels (max pressure 20 bars)
28/29 300,000.00
Veron Moris analog calibrated Pressure
Gauges with up to 20Bars and has plotter paper.
Some pumping stations have no pressure gauges, which is essential for pump efficiency monitoring and data gathering.
28/29 50,000.00
Install Water Pressure Gauges Installation and replacement of Water
Pressure Gauges. A total of 120 in 4 years
28/29 150,000.00
SUB-TOTAL 28/29
-
-
700,000.00
NRW MANAGEMENT TOTAL 28/29 - - 8,265,000.00
METERING Water Meters -New Connections +
Fittings
7,128 28/29 No. 541 7,128 3,856,248.00
METERING Water Meters - The Existing Unmetered
Connections Fittings
7,128 28/29 No. 1,478 7,128 10,535,184.00
SUB-TOTAL
METERING
SUB-TOTAL METERING SUB-TOTAL
METERING
28/29 14,391,432.00
REHABILITATION
WORKS
Rehabilitation of Boreholes (Flushing, Flood proofing, Disinfecting the borehole draw pipe, pump, and motor replacement)
3,967,740 28/29 No. 2 3,967,740 7,935,480.00
Pipe replacement of 3/4 “uPVC pipe 420 28/29 m. 2,000 420 840,000.00
Replacement Sewerage Manhole Covers 15,000 28/29 No. 40 15,000 600,000.00
Inline dosing points for Chlorination 592,100 28/29 No. 2 592,100 1,184,200.00
Rehabilitation of Boreholes (Flushing, Flood proofing, Disinfecting the borehole draw pipe, pump, and motor replacement)
28/29 No. 6 3,967,740 23,806,440.00
Pipe replacement of 3/4 " uPVC pipe 28/29 m. 3,000 420 1,260,000.00
Pipe replacement of 1" uPVC pipe 28/29 m. 500 420 210,000.00
Pipe replacement of 1 1/2" uPVC pipe 28/29 m. 500 840 420,000.00
Pipe replacement of 2" uPVC pipe 28/29 m. 1,000 1,210 1,210,000.00
1244 1244
Item Financial
Year
Quantity Unit Price
(KSh.)
Amount (KSh.)
Pipe replacement of 3" uPVC pipe 28/29 m. 500 2,490 1,245,000.00
Replacement Sewerage Manhole Covers 28/29 No. 30 15,000 450,000.00
Inline dosing points for Chlorination 28/29 No. 3 592,100 1,776,300.00
SUB-TOTAL -REHABILITATION WORKS Sub-total -rehabilitation works
28/29 40,937,420.00
GRAND TOTAL 63,593,852.00
Dated the 9th March, 2026.
RICHARD CHERUIYOT, MR/7808745 Ag. CEO, Water Services Regulatory Board.
Dated the 9th March, 2026.
RICHARD CHERUIYOT,
Ag. CEO, Water Services Regulatory Board.
Extracted Entities (1)
previous_gazette_ref
4163
Details
- Act / Legislation
- THE WATER ACT
- Reference
- No. 43 of 2016
- Section
- section 72 (1) (b)
- Signed By
- RICHARD CHERUIYOT
- Title
- Ag. CEO, Water Services Regulatory Board
- Date Signed
- 9th March 2026
- Page
- 55
- Extraction Method
- regex
Source Gazette
Vol. CXXVIII No. 51 (SUPPLEMENT)
Published 19th March 2026