Back
ACT 100% confidence via regex

GAZETTE NOTICE NO. 5225

GAZETTE NOTICE NO. 5225

THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT

(No. 8 of 1999)

ACT


PURSUANT to section 59 of the Environmental Management and Co-ordination Act, 1999, the National Environment Management Authority (NEMA) has received an Environmental Impact Assessment Study Report for the above proposed project. The proponent, Elgon Kenya Limited, proposes to establish a steam-granulated fertilizer manufacturing plant to produce NPK fertilizer along with other related crop nutrition products, together with associated office spaces, a perimeter wall, ablution block with septic tanks and other associated facilities and amenities on Plot L.R. 24605/12, Ngelani Village, Mavoko Municipality, Machakos County. The following are the anticipated impacts and proposed mitigation measures: Impacts Mitigation measures Air quality  Minimize generation of air pollutants through using modern equipment that have minimum emissions.  Ensure all containers of volatile products are kept close.  Regular monitoring of air quality in the plant. Parameters for monitoring include SO2, dust and other pollutants.  Switch off engines when not in use. Health and safety for workers  Provision of appropriate protective clothing such as dust masks, gloves and safety goggles to workers during construction and operation phase of the project.  Regular training on pro-active safety for employees.  Conducting health and safety audits annually.  Provide adequate sanitary facilities.  Establish an ‘employees clinic’ manned by a qualified physician. Public health and safety  Restrict access into the facility by members of the public. 10th April, 2026 THE KENYA GAZETTE Impacts Mitigation measures  Monitor annually for air based infections from the nearby health facilities. Waste management  Hazardous waste should be incinerated.  Waste water from the facility should be directed into soak pits or an artificial wetland.  Office wastes to be burnt on site.  Storm water to be properly directed into the Athi River by drains - Medical waste to be incinerated. Soil erosion and ground water pollution  Ensure that all the activities at the fertilizer plant do not encroach the riparian.  Plant trees along the perimeter fence and other areas within the facility - Carryout soil conservation measures. Noise and vibrations  Construction activities and vehicle movement to be restricted to daytime hours.  All vehicles and machinery should be maintained at standard noise levels. Solid waste and hazardous waste  Use integrated solid waste management system through waste management hierarchy options of reuse, recycle.  Provide sanitary facilities to the workers.  Reuse fertilizer dust sweepings to spread in the gardens. Occupational health and safety  Prepare an EMP to be made available to the public and government officials.  The proponent will be responsible for managing, supervising and controlling health and safety on site.  All reasonable precautions to safeguard the health and safety of all persons, employees and the general public. The full report of the proposed project is available for inspection during working hours at: (a) Director-General, NEMA, Popo Road, off Mombasa Road, P.O. Box 67839–00200, Nairobi. (b) County Director of Environment, Machakos County. A copy of the report can be downloaded at www.nema.go.ke The National Environment Management Authority invites members of the public to submit oral or written comments within thirty (30) days from the date of this publication to the Director- General, NEMA, to assist the Authority in the decision making process regarding this project. Comments can also be emailed to dgnema@nema.go.ke MAMO B. MAMO, Director-General, MR/8098393 National Environment Management Authority.

Dated the 10th April, 2026.

MAMO B. MAMO,

Director-General, National Environment Management Authority.

Extracted Entities (1)

previous_gazette_ref

5225

Details

Act / Legislation
THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
Reference
No. 8 of 1999
Section
section 59
Signed By
MAMO B. MAMO
Title
Director-General, National Environment Management Authority
Date Signed
10th April 2026
Page
86
Extraction Method
regex