Back
BILL 100% confidence via regex

GAZETTE NOTICE NO. 6528

GAZETTE NOTICE NO. 6528

THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT

(Cap. 387)

BILL


PURSUANT to section 59 of the Environmental Management and Co-ordination Act, (Cap. 387), the National Environment Management Authority (NEMA) has received an Environmental Impact Assessment Study Report for the above proposed project. The proponent, Customs Homes Limited, proposes to construct two 15 storey residential towers (basement, ground, mezzanine floor, 15 upper floors plus roof top floor) comprising a total of 260No. residential units (60No. studio units, 90No. one bedroom units and 110No. two bedroom units) office, badminton court, play area, swimming pool, gym, parking spaces and other associated facilities and amenities on Plot L.R. No. Nairobi/Block 21/226 on Riverside gardens, off Riverside drive in Riverside area, Nairobi City County. The following are the anticipated impacts and proposed mitigation measures: Environmental/Social Impact Proposed Mitigation Measures Waste management • Waste minimization by ordering right/accurate quantities and sizes rather than cutting to sizes leaving wastes or ordering excess quantities leaving residuals. • Reduction and segregation of waste at source and suitable bins properly labeled to facilitate recycle, reuse and/or sound disposal. • Engage the services of NEMA registered waste collector for disposal of solid waste. • Sound waste management system by incorporating suitable facilities for collection, segregation and safe disposal of solid wastes to support recycling and reuse. • Proper storage, handling and disposal of new and used oil. • Installation of sanitary systems that use less water. • Connection to sewer for wastewater disposal. • Ensure compliance with Waste Management Regulations, 2006 and The Environmental/Social Impact Proposed Mitigation Measures Sustainable Waste Management Act. Constraints to infrastructure and services • Liason with respective service providers for proper installation/expansion. • Adequate provision for infrastructure and services. • Installation of internal infrastructure (drainage, water, roads, sewer, parking, rain water harvesting and storage etc) to best standards. • Installation of transformer(s) and supplementary sources such as solar systems. • Adoption of green building technologies. Soil disturbance and erosion • Control earthworks and compact loose soils. • Install drainage structures properly. • Landscaping on project completion. • Control and manage excavation activities. • Provide soil erosion control and conservation structures/means where necessary. • Ensure standard appropriate practices. • Efficient drainage structures by proper design, construction and maintenance. Air pollution • Enclose the site with suitable double dust screens. • Sprinkle water to dry soils in excavated areas and earth roads to suppress dust. • Covering friable material loads during transportation. • Sound condition of machinery and equipment • Strict adherence to Air Quality Regulations, 2014. Noise pollution • Erect suitable barriers to control noise. • Maintain machinery, plant equipment. • Construction activities to be restricted between 8a.m. to 5p.m. • Workers exposed to high-level noise to wear safety and protective gear. • Adherence to Noise and Excessive Vibration Pollution (Control) Regulations, 2009. Increased pressure on resources • Adoption of green building technologies. • Conservation of resources; use of renewable resources; rain water harvesting and storage; installation of solar energy systems. • Sourcing materials from environmentally compliant suppliers/sources. • Use of recyclable materials; Installation of water conserving taps and facilities; waste water recycling and reuse. • Installation of transformer(s) and supplementary sources such as solar systems and standby generators. 30th April, 2026 THE KENYA GAZETTE Environmental/Social Impact Proposed Mitigation Measures • Ensure electrical equipment, appliances and lights are switched off when not being used. • Design to provide for adequate natural lighting and ventilation. Public health, occupational health and safety • Train staff/workers on occupational health and safety; Provide full PPEs and workmen’s compensation cover in addition to the right tools and operational instructions and manuals. • Design and disseminate appropriate emergency response plans. • Installation and maintenance of fire prevention, control and management measures. • Ensure machinery and equipment servicing and maintenance as per schedules and legal requirements. • Ensure adherence OSHA, 2007. • Ensure use of standard construction materials and to the specifications. Avoid undesirable, substandard, hazardous or unauthorized materials during construction and maintenance. • Provide fully equipped First Aid kits & train staff on its use. • Provide bill boards at the site/entrance to notify motorists and public about the development. • Waste water management installations (e.g. Sewers) be isolated from water pipes to avoid contamination of domestic water. • Design to include adequate circulation. The full report of the proposed project is available for inspection during working hours at: (a) Director-General, NEMA, Popo Road, off Mombasa Road, P.O. Box 67839–00200, Nairobi. (b) County Director of Environment, Nairobi City County. A copy of the report can be downloaded at www.nema.go.ke The National Environment Management Authority invites members of the public to submit oral or written comments within thirty (30) days from the date of this publication to the Director- General, NEMA, to assist the Authority in the decision making process regarding this project. Comments can also be emailed to dgnema@nema.go.ke MAMO B. MAMO, Director-General, MR/8118487 National Environment Management Authority.

Dated the 30th April, 2026.

MAMO B. MAMO,

Director-General, National Environment Management Authority.

Extracted Entities (1)

previous_gazette_ref

6528

Details

Act / Legislation
THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
Reference
Cap. 387
Section
section 59
Signed By
MAMO B. MAMO
Title
Director-General, National Environment Management Authority
Date Signed
30th April 2026
Page
38
Extraction Method
regex