GAZETTE NOTICE NO. 8426
GAZETTE NOTICE NO. 8426
THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
(Cap. 387)
ACT
PURSUANT TO section 59 of the Environmental Management and Co-ordination Act, the National Environment Management
Authority (NEMA) has received an Environmental Impact Assessment
Study Report for the above proposed project.
The proponent, Central Park Residency Limited, proposes to develop 5No. blocks of 25 floors each (5No. basements, ground plus
25 floors) comprising a total of 1090 residential apartments (601 one- bedroom units, 435 two-bedroom units, 50 three-bedroom units and 4 four-bedroom units), 808No. parking bays, convenience store, swimming pool, running and fitness area, kids play area, padel, study area, a coffee area, other associated amenities and facilities on amalgamated Plot L.R. No. Nairobi/Block 22/211, 213, 218 and 230 located along Laikipia Road in Kileleshwa Area, Nairobi City County.
The following are the anticipated impacts and proposed mitigation measures:
Impact Proposed Mitigation Measures
Soil erosion • Obtain an excavation permit from
Nairobi City County before excavation begins.
• Stabilize exposed surfaces through compaction, grading and levelling to reduce susceptibility to erosion.
Air pollution • Screen the entire site using dust screens/nets to control and arrest construction-related dust.
• Sprinkle water in the work areas twice every day to prevent fugitive dust violations.
• Undertake ambient air quality monitoring within the site.
Noise and excessive vibrations
• Construction activities will be undertaken on weekdays between 0800 hrs to 1800 hrs and on Saturdays between 0800 hrs to 1300 hrs.
• Use standard equipment for the excavation works to minimize excessive vibrations.
• Undertake ambient noise quality monitoring within the site.
Water demand • Extend the connection of the main water supply to the proposed development upon acquisition of a connection permit from NCWSC.
• Drill a borehole to supplement the existing NCWSC water supply.
• Harvest rainwater for reuse to
5th June, 2026 THE KENYA GAZETTE
Impact Proposed Mitigation Measures supplement the existing surface and subsurface water sources.
• Install water-efficient fixtures and fittings that turn off automatically such as low flow rate taps.
• Monitor the water consumption within the site every month.
Energy demand • Install an on-site transformer to supply energy to the proposed development subject to the acquisition of a connection permit from KPLC.
• Install solar panels as an alternative source of renewable energy for the proposed development.
• Install a standby generator as a backup source of energy for the development.
• Install energy-efficient fixtures and fittings within the development such as
LED bulbs.
• Monitor the energy consumption within the site every month.
Liquid waste • Construct a mini–Sewer Treatment
Plant (STP) for pre-treatment of liquid waste before final discharge into the existing sewer system.
• Extend the connection of the proposed development to the existing conventional sewer system.
• Design and construct an internal reticulation system which can consistently handle the loads even at peak volumes.
Storm water management
• Design and construct gently sloping drainage channels to convey runoff at non-erosive velocities and prevent scouring.
• Install adequate sediment and erosion control measures such as silt trap to prevent sediment discharge into the watercourse.
Solid waste • Design and implement a three-year
Waste Management Plan (WMP).
• Provide a centralised Waste Collection
Centre (WCC) with colour-coded receptacles for solid waste management.
• Segregate non-hazardous waste into organic and non-organic fractions before final disposal.
• Engage a NEMA-licensed waste transporters to collect and dispose of the segregated waste at designated disposal sites.
Traffic density • Ferry building materials and construction waste during the off-peak hours.
• Engage traffic marshals to control traffic in and out of the site.
• Install traffic control/warning signs to inform motorists and the public of the potential hazards.
• Provide temporary car parking spaces for the construction vehicles within the property to prevent disruption along the Laikipia road.
Impact Proposed Mitigation Measures
Health and safety risks • Register the construction site as a workplace with the DOSHS before the construction begins.
• Obtain insurance coverage against accidents for all the workers before the construction begins
• Provide adequate and appropriate PPE and ensure that all workers wear them at all times.
• Develop an Emergency Response Plan
(ERP) to manage the occurrence of anticipated hazards.
• Comply with the Occupational Safety and Health Act (OSHA), 2007 and subsidiary regulations.
Security risks • Engage licensed security personnel to safeguard the property and monitor the movement of people in and out of the site.
• Keep records of all construction workers as per DOSHS requirements.
Loss of vegetation • Transplant the conservation-sensitive species such as hibiscus fragilis within the riparian buffer zone.
• Retain all existing trees and shrubs within the riparian reserve.
• Obtain a tree-cutting clearance certificate from the Nairobi County
Director of Forestry before cutting down the trees.
• Undertake a comprehensive landscaping exercise by planting indigenous trees within the riparian reserve and designated open spaces.
The full report of the proposed project is available for inspection during working hours at:
(a) Principal Secretary, Ministry of Environment, Climate
Change and Foresty, NHIF Building, 12th Floor, Ragati
Road, Upper Hill, Upper Hill, P.O. Box 30126–00200, Nairobi.
(b) Director-General, NEMA, Popo Road, off Mombasa Road, P.O. Box 67839–00200, Nairobi.
(c) County Director of Environment, Nairobi City County.
A copy of the EIA report can be downloaded at www.nema.go.ke
The National Environmental Management Authority, invites members of the public to submit oral or written comments within thirty (30) days from the date of publication of this notice to the Director-
General, NEMA to assist the Authority in the decision making process for this project. Kindly quote ref. No. NEMA/ENVIS/SR/00560.
Comments can also be e-mailed to dgnema@nema.go.ke
MAMO B. MAMO, MR/7804019 Director-General.
Dated the 5th June, 2026.
MAMO B. MAMO,
Director-General.
Extracted Entities (1)
previous_gazette_ref
8426
Details
- Act / Legislation
- THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
- Reference
- Cap. 387
- Section
- section 59
- Signed By
- MAMO B. MAMO
- Title
- Director-General
- Ministry
- Ministry of Environment, Climate
- Date Signed
- 5th June 2026
- Page
- 36
- Extraction Method
- regex
Source Gazette
Vol. CXXVIII No. 97 (SUPPLEMENT)
Published 5th June 2026