GAZETTE NOTICE NO. 1507
GAZETTE NOTICE NO. 1507
THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
(No. 8 of 1999)
REGULATION
PURSUANT to regulation 21 of the Environmental (Impact
Assessment and Audit) Regulations, the National Environment.
Management Authority (NEMA) has received an Environmental
Impact Assessment Study Report for the implementation of proposed
Cement Manufacture Company.
The proposed project involves the mixing of the imported clinker with the correct amounts of gypsum, clay and pozzolona to produce cement.
The project is to be located on L.R. No. 12648/15 and 12648/17, Machakos District, Athi River Division, Athi River.
The project anticipates the following impacts and mitigation measures:
Possible impacts
Mitigation measures
I "Noise Pollution
• Working with noise abatement equipment.
•Regular service of equipment.
•Switch off vehicles engines when not in use.
2. Disposal of excavated soil and • All excavated areas to be properly soil and land degradation back-filled and compacted and revegetated.
Number of complaints
6
3
2
Number of complaints
5
36
Number of complaints
10
19
7th March, 2008 THE KENYA GAZETTE 471
Possible impacts Mitigation measures
5.Health and safety concerns
6.Damage to public roads and pavements
7.Air quality
•
3.Increase in ground water • pollution
•
4.Sanitation •
•Construction of conservation measures at the stock-piled sites.
Apply ecological reshaping by filling holes, soil leveling and planting trees and grass around the construction blocks.
Establish contingency measures measures to deal with spillages of oil and hazardous materials.
Any disused burrow pits to be filled or drained.
Use clean water treated from
Mavoko Council and empty wastes into the COuncil's main pipes.
•Where sewer not available, septic tanks and exhauster services should be used.
•First aid box to be on site.
•Provide and apply Material Safety
Data Sheets (MSDA).
•Provide personal protective equipments such as head gear, goggles, gas masks etc.
•Install appropriate sizes of culverts and embankments to provide adequate drainage.
•Use of covered/secure sheds for raw materials/product storage.
•Install vibrating feeders under storage yard to reduce dust emissions.
impact assessment study report for the implementation of proposed
Tongwe Mara Camp on L.R. No. CIS Mara/Talek/96 at Narok.
The proposed project will comprise of the construction of thirty
(30) tented camp.
The intake of the project is located outside the Maasai Mara Game
Reserve, about 6 kilometres from the Talek Town, in Koiyaki Group
Ranch, Narok Sotah District.
The project anticipates the following impacts and mitigation measures:
Mitigation measures
•The proponent is entitled to apply for the waste disposal licences.
•There will be need for stringent treatment of effluent.
•Dust emissions during construction may be reduced using biodegradable hydrant and sprinkling of water on the surface.
•Ensure minimal obstruction to storm water flow and prevent surface run-off from entering the sewers
•Provide fixed and permanent monitoring points for sampling and install a gauging systetn for monitoring volumes of waste water.
Possible impacts
1.Water quality
2.Air quality
3.Waste water collection
The full report of the proposed project is available for inspection during working hours at:
(a)Diiector General, National Environment Management
Authority, Kapiti Road, off Mombasa Road. P.O .Box
67839-00200. Nairobi.
(b)Permanent Secretary, Ministry of Environment and Natural
Resources. N.H.I.F. Building. P.O. Box 30521, Nairobi.
(c)Provincial Director of Environment, Eastern Province.
(d)District Environment Officer, Machakos District.
The. National Environment Management Authority, invites members of the public to submit oral or written comments within thirty (30) days from the date of publication of this notice to the
Director-General. National Environment Management Authority. to assist the Authority in the approval process of the project.
B. M. LANGWEN.
for Director-General.
National Environment Management Authority.
GAzErni Now): No. 1739
THE ENVIRONMENTAL MANAGEMENT AND
CO-ORDINATION ACT
(No. 8 of 1999)
THE NATIONAL ENVIRONMENT MANAGEMENT AUTHORITY
ENVIRONMENTAL IMPACT ASSESSMENT STUDY REPORT
FOR THE PROPOSED TONGWF. MARA CAMP ON L.R. NO. CIS
MARA/TALEK/96 AT NAROK
INvrrATioN OF Pt nLtc CONIMENTS
PURSUANT to regulation 21 of the Environmental (Impact
Assessment and Audit) Regulations. the National Environment
Management Authority (NEM A) has received an environmental
•Wastewater pre-treatment systems (if any) should be isolated and fenced off for restricted access.
•Use of serviced and greased equipment to reduce noise.
4. Noise pollution
•Ensure use of ear muffs by operators
5. Biological diversity • Lawns and gardens to be planted with diverse vegetation species.
•The riparian strip will also be enriched with indigenous tree species.
•Adhere to eco-tourism principles
The full report of the proposed project is available for inspection during working hours at:
(a)Director-General. National Environmental Management
Authority, Kapiti Road, off Mombasa Road, P.O. Box 67839-
00200, Nairobi.
(b)Permanent Secretary, Ministry of Environment and Natural
Resources, N.H.I.F. Building, P.O. Box 30521, Nairobi.
(c)Provincial Director of Environment, Rift Valley Province.
(d)District Environment Officer, Narok North District.
The National Environmental Management Authority, invites members of the public to submit oral or written comments within thirty (30) days from the date of publication of this notice to the
Director-General, National Environmental Management Authority, to assist the authority in the approval process of the project.
B. M. LANGWEN, for Director-General, National Environment Management Authority.
472 THE KENYA GAZE I 1E 7th March, 2008
Dated the 7th March, 2008.
B. M. LANGWEN,
for Director-General, National Environment Management Authority.
Extracted Entities (1)
previous_gazette_ref
1507
Details
- Act / Legislation
- THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
- Reference
- No. 8 of 1999
- Signed By
- B. M. LANGWEN
- Title
- for Director-General, National Environment Management Authority
- Ministry
- Ministry of Environment And Natural
- Date Signed
- 7th March 2008
- Page
- 42
- Extraction Method
- regex
Source Gazette
Vol. CX No. 21 (SPECIAL ISSUE)
Published 7th March 2008