GAZETTE NOTICE NO. 2911
GAZETTE NOTICE NO. 2911
THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
(No. 8 of 1999)
REGISTRATION
PURSUANT to regulation 21 of Environmental (Impact
Assessment and Audit) Regulations, the National Environment
Management Authority (NEMA) has received an Environmental
Impact Assessment Study Report for the implementation of proposed
Apartments on Plot No. 589 section 1/MN Nyali, Mombasa.
The proposed project entails construction of 36 apartments in 3 blocks. Each block with 7 floors, swimming pool, gym, tennis/volley ball court, gardens and parking. Various activities such as site clearance, ground preparation, assembly of building materials and actual work will be carried out.
The project anticipates the following impacts and mitigation measures:
Possible Impacts
Mitigation Measures
1.Dust disturbance
• Regular sprinking of water.
•Provision of dust masks to workers.
•Selective cutting of trees.
8. Sensitivity to wildlife and • Develop a code of practice for biodiversity respect of wildlife and proper conservation maintenance of the equipment used in the works.
• Make optional use of environmental resources that constitute a key element in tourism development within the park, maintain essential ecological processes and helping to conserve natural heritage and biodiversity.
3.Solid Waste
• Provision of waste bins at site.
•Waste will be sorted at source.
•Color code to be used to distinguish waste bins.
•Solid waste to be handled, managed and disposed according to the waste regulations.
•Contract a licensed company to handle waste.
•Waste collection will be done regularly.
4. Increase demand for water • Installation of water saving device.
and electricity
•Apply for license to sink a borehole.
•Approximate volume of water required in order to place a mechanism for reliable supply.
•Use of energy saving bulbs.
•Promote the use of solar and wind energy.
5. Impact of sewage from the • Management to apply for a license apartment to discharge effluent.
•Effluent to be periodically analyzed.
•Septic tanks to be regularly emptied.
•Maintenance of sewer lines to address leaks and bursts.
•Treatment of waste to acceptable standards before discharge.
•Monitoring of local ground.
•Prompt address to leakages.
The full report of the proposed project is available for inspection during working hours at:
18th April, 2008 THE KENYA GAZETTE 885
(a) Director General, National Environmental Management
Authority, Kapiti Road, off Mombasa Road, P.O. Box 67839-
00200, Nairobi.
Possible impact
Mitigation measures
•Energy saving bulbs to be used in lighting.
(b)Permanent Secretary, Ministry of Environment and Natural
Resources, NHIF Community, P.O. Box 30521, Nairobi.
(c)Provincial Director of Environment, Coast Province.
(d)District Environment Officer, Mombasa District.
•Use of solar energy.
4. Solid waste
• Solid waste to be managed management.
according to the waste management regulations.
5. Sewage from apartments.
B. M. LANGWEN, for Director-General, National Environment Management Authority.
GAzErrE NOTICE No. 3182
THE ENVIRONMENTAL MANAGEMENT AND
CO-ORDINATION ACT
(No. 8 of 1999)
THE NATIONAL ENVIRONMENT MANAGEMENT
AUTHORITY
ENVIRONMENTAL IMPACT ASSESSMENT STUDY REPORT
FOR THE PROPOSED APARTMENTS ON PLOT NO. 4151/3
MALINDI
INVITATION OF PUBLIC COMMENTS
PURSUANT to regulation 21 of Environmental (Impact
Assessment and Audit) Regulations, the National Environment
Management Authority (NEMA) has received an Environmental
Impact Assessment Study Report for the implementation of proposed apartments on plot No. 4151/3, Malindi.
The proposed project entails the building of 37 apartments staff quarters, driving school, swimming pool and offices.
The Project anticipates the following impacts and mitigation measures.
Possible impact Mitigation measure.s.
1. Noise disturbance • All constrution work to be limited to daytime only.
Management of ' apartment to contract a licensed waste collection company.
•Color code to be used to distinguish waste bins of different wastes.
Waste to be sorted at source.
▪Solid waste to be disposed only at licensed disposal sites.
the • Management to apply for license to discharge effluent from NEMA.
Effluent to be periodically analyzed (every 3 months) to ensure BOD is maintained at
30gm/1 or less and COD at 50gm/1 or less.
•Septic tanks to be regularly maintained to address leakages and bursts.
•Local ground water to be maintained to address leakages and bursts.
•If septic tanks and soak pits will be preferred system, then they should be regularly emptied.
•Immediate neighbours to be notified in writing on the date of commencement of construction work at least one month in advance.
•All employees likely to be exposed to high noise to be provided with ear protectors.
.2. Increase in vehicle • Tracks ferrying materials, tools and traffic in the area equipment to the site to observe the set speed limits to avoid accidents.
•Only one personal car be allowed per apartment.
•Management to provide for adequate internal parking, each apartment to be allocated at least one parking.
3. Increased demand for • Approximate volumes of water to water and electricity be required in order to put in place supply mechanisms of reliable supply.
Water saving devices such as push taps to be installed to minimize lose through loose taps.
•Sinking of borehole to be done after obtaining clearance and licensing from all relevant government authorities.
•If a sewage treatment plant will be preferred system, then its efficiency in treating the sewage before discharge to the environment must be of the acceptable environmental standards.
The full report of the proposed project is available for inspection during working hours at:
(a) Director-General, NEMA, Kapiti Road, off Mombasa Road
P.O. Box 67839-00200, Nairobi
(h) Permanent Secretary. Ministry of Environment and Natural
Resources, NHIF Community, P.O. Box 30521, Nairobi.
(c)Provincial Director of Environment, Coast Province, Mombasa.
(d)District Environment Office, Malindi District
NEMA invites members of the public to submit oral or written comments within sixty (60) days from the date of publication of this notice to the Director General, NEMA, to assist the Authority in the approval process of the project
B. M. LANGWEN, for Director-General, National Environment Management Authority.
GAzerrE NOTICE No. 3183
THE ENVIRONMENTAL MANAGEMENT AND
CO-ORDINATION ACT
(No. 8 of 1999)
THE NATIONAL ENVIRONMENT MANAGEMENT
AUTHORITY
ENVIRONMENTAL IMPACT ASSESSMENT STUDY REPORT
FOR THE PROPOSED STEEL MILL ON PLOT NO. MV 478 AND
MV/479 KILIFI
INVITATION OF PUBLIC COMMENTS
PURSUANT to regulation 21 ' of Environmental (Impact
Assessment and Audit) Regulations, the National Environment
Management Authority (NEMA) has received an Environmental
Impact Assessment Study Report for the Implementation of proposed man steel mill on plot No. MV/478 and MV/479, Kilifi.
The proposed project entails the manufacture high quality steel from scrap metal using electric arc furnace technology.
The project anticipates the following impacts and mitigation measures:
Possible Impacts Mitigation Measures
1.Solid waste management • All solid waste generated will be managed and disposed according to the waste management regulations, 2006.
2.Air Pollution • Install scrubbers to remove particulate matter.
•Install bag type filters to trap dust and particulate matter and associated toxic substance.
•Use wet system such as water shower to trap any impurities in the emissions.
3. Water Pollution • Install an effluent treatment plant to treat waste water to acceptable environmental standards before discharge to the environment.
•Sedimentation of the effluent to remove suspended solids.
•Chemical treatment of effluent by PH adjustment to precipitate heavy metal.
•Physical treatment by filtration to remove solids.
4. Dust disturbance
• Regular sprinkling of water on open surface and dust grounds.
•Selective cutting of trees on the site. Planting trees on open areas.
•Provision of dust mask to employees.
5. Noise disturbance
• Construction work to be limited to daytime only.
•Immediate neighbours to be notified in writing on the date of commencement of construction work at least one month in advance.
•Provision of ear protectors to workers.
Noisy machines to be fitted with noise reduction devices.
6. Occupational hazards
Provide all workers with appropriate working tools and equipment.
•Provide all workers with appropriate personal protective equipment.
•First aid facilities and services to be readily available on site.
Possible Impacts Mitigation Measures
7. Furnace slug • The slug to be stabilized to remove heavy metals and to ensure that resulting lactates are within the acceptable environmental standards.
The full report of the proposed project is available for inspection during working hours at:
(a) Director General, National Environmental Management
Authority, Kapiti Road, off Mombasa Road, P.O. Box 67839-
00200, Nairobi.
(h) Permanent Secretary, Ministry of Environment and Natural
Resources, NHIF Community, P.O. Box 30521, Nairobi.
(c)Provincial Director of Environment, Coast Province.
(d)District Environment Officer, Kilifi District.
National Environmental Management Authority invites members of the public to submit oral or written comments within sixty (60) days from the date of publication of this notice to the Director General, NEMA, to assist the Authority in the approval process of the project.
B. M. LANGWEN, for Director General
National Environment Management Authority.
GAZETTE NOTICE. No. 3184
THE ADVOCATES (ADMISSION) REGULATIONS
(Cap. 16, Sub. Leg. No. 12 of 1995)
NOTIFICATION OF EXAMINATION DATES
PURSUANT to regulation 10 (3) of the Advocates (Admission)
Regulations, it is notified for general information that the Council of
Legal Education Supplementary Examinations will be held at the
Kenya School of Law, Langata South Road, Karen, Nairobi, from 9th to 26th June, 2008, both days inclusive.
The examination timetable is as follows:
Date
Morning 9.00 a.m. — Afternoon 2.00
12.00 noon p.m.-4.00 p.m.
Monday, 9th June, 2008
Accounts
Tuesday, 10th June, 2008 Family Law
Wednesday, 11th June, Legal Advocacy and
Drafting Skills
Thursday, 12th June, 2008 Law of Succession
Friday, 13th June, 2008
Commercial Law
Criminal Law
Monday, 16th June, 2008 Land Law
Tuesday, 17th June, 2008 Criminal Procedure
Wednesday, 18th June, Civil Procedure
Thursday, 19th June, 2008 Company Law
Law of Contract
Friday, 20th June, 2008
Conveyancing
Monday, 23rd June, 2008 Professional Ethics and
Practice
Tuesday, 24th June, 2008 Constitutional Law and
Legal System of
Kenya
Wednesday, 25th June, Evidence
Thursday, 26th June, 2008 Equity Law of Tort
The deadline for registration is Friday, 16th May, 2008.
Dated the 9th April, 2008.
W. KULUNDU-BITONYE, Director/Chief Executive and Secretary, Council of Legal Education
18th April, 2008 THE KENYA .GAZETTE
Dated the 9th April, 2008.
W. KULUNDU-BITONYE,
Director/Chief Executive and Secretary, Council of Legal Education 18th April, 2008 THE KENYA .GAZETTE.
Extracted Entities (1)
previous_gazette_ref
2911
Details
- Act / Legislation
- THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
- Reference
- No. 8 of 1999
- Section
- section 1
- Signed By
- W. KULUNDU-BITONYE
- Title
- Director/Chief Executive and Secretary, Council of Legal Education 18th April, 2008 THE KENYA .GAZETTE
- Ministry
- Ministry of Environment And Natural
- Date Signed
- 9th April 2008
- Page
- 44
- Extraction Method
- regex
Source Gazette
Vol. CX No. 34 (SUPPLEMENT)
Published 18th April 2008