Back
REGULATION 100% confidence via regex

GAZETTE NOTICE NO. 3466

GAZETTE NOTICE NO. 3466

THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT

(No. 8 of 1999)

REGULATION


PURSUANT to regulation 21 of the Environmental (Impact Assessment and Audit) Regulations, the National Environment Management Authority (NEMA) ha's received an environmental impact assessment study report for the implementation of proposed up- grading of Outer Ring Road (C59). The project is located on Outer Ring Road (C59). The project anticipates the following Impacts and mitigation measures. Possible impacts Mitigation measures 1. Land degradation and loss • Soil conservation measures. of soil •Rehabilitation of quarries and borrow pits stock pits and spoilt areas. •Soil and grassing. •Tree planting. 2. Water degradation and • Provision of portable water. pollution Water drainage structures. Pollution control measures. Management of waste water. Dust control measures. Tuning of machines and engines. Noise control measures. Maintenance of plant, equipment and vehicles. Rehabilitation of quarrying and materials sites. Sensitization programme Compensation. Sensitization of the local community. •Appropriate compensation. •Provide protective wear and gear. 8. Human health and disease • HIV/AIDS awareness prevention and HIV/AIDS and training. •ProVision of potable water for 4 consumption. •First Aid. •Health clinic. 9. Road accidents and safety • Place proper road safety signs and measures. • • • 3.Air pollution • • 4.Noise pollution • • 5.Loss and treat to • Biodiversity • 6.Loss of land • 7.Blasting nuisance and hazards • •Road education for the local community. B. M. LANGWEN, for Director General National Environment Management Authority. •Enforcement of Traffic Act. 10. Generation of waste • Solid waste management. 25th April, 2008 THE KENYA GAZETTE 997 Passible impacts Mitigation measures •Liquid waste management. 1 I. Scraps and other debris • Water management as a result of and spoil on site facility decommissioning. •Demobilization. •All buildings, machinery, equipment, structures and partitions that will not be used for other purposes must be removed and recycled or used say in other projects. •Where recycling, reuse of the machinery, equipment, implements, structures, partitions and other demolition waste is not possible, the materials should be taken disposed in approved dumpsites. The full report of the proposed project is available for inspection during working hours at: (a) The Director-General National Environment Management Authority, Kapiti Road, off Mombasa Road, P.O. Box 67839-00200, Nairobi. (h) The Permanent Secretary, Ministry of Environment and Natural Resources, National Hospital Insurance Fund Building, Community, 4th Floor, P.O. Box 30521, Nairobi. (•) The District Environment Office, Nairobi East Division. The National Environment Management Authority invites members of the public to submit oral or written comments within sixty (60) days from the date of publication of this notice to the Director- General, National Environment Management Authority, to assist the authority in the approval process of the project. Dated the 18th July, 2007. M. 0. MBEGERA, for Director-General, National Environment Management Authority.

Dated the 18th July, 2008.

M. O. MBEGERA,

for Director-General, National Environment Management Authority.

Extracted Entities (1)

previous_gazette_ref

3466

Details

Act / Legislation
THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
Reference
No. 8 of 1999
Signed By
M. O. MBEGERA
Title
for Director-General, National Environment Management Authority
Date Signed
18th July 2008
Page
72
Extraction Method
regex