Back
REGULATION
100% confidence
via regex
GAZETTE NOTICE NO. 3467
GAZETTE NOTICE NO. 3467
THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
(No. 8 of 1999)
REGULATION
PURSUANT to regulation 21 of the Environmental (Impact
Assessment and Audit) Regulations, the National Environment
Management Authority (NEMA) has received an environmental impact assessment study report for the implementation of proposed road up-grading.
The project anticipates the following impacts and mitigation measures.
Possible impacts
Mitigation measures
1. Human displacement from • The affected community members road reserves and should be informed early enough.
diversions
•Compensation to affected property on market rater or • otherwise mutually agreed.
2. Contamination of soil by • Vehicle, machinery and equipment fuels and lubricants. maintenance and refueling will be carried out so that spilled materials do not seep into soil.
•Fuel storage and refilling areas will he located at least 300 metres from drainage strut:0es and important water bodies.
•Oil traps will he provided lbr service areas, full station areas, parking areas and within drainage systems for bridges.
3. Degradation of borrow • All borrow/quarry areas will be • and quarry areas refilled, re-vegetated and landscaped.
•Ilaphazard borrowing and quarrying should he avoided.
•Degraded and barren areas, river beds and wetlands to he used fir borrowing material.
•Land could . he selected through community consultation and sites subsequent developed into productive purposes.
2nd May, 2008
Possible impacts
Mitigation measures
4. Contamination of water • Traps will be provided at fueling sources by points to prevent water
•petrochemicals contamination.
•Embankment slopes leading to water bodies will be modified and screened so that contaminated do not enter the water body.
5. Sanitation and water from • Side drains in settlement areas will workmen camps discharge through a primary setting tank mainly a septic tank
•Camps will have on site sanitation facilities so that nb water pollution takes place.
6. Accidents during transport• Delivery of hazardous substances must be done under certification by respective departments according to
Waste Regulations, 2006.
•Such vehicles must be marked with appropriate signs in block capital with red print, plying during off-peak hours.
•Any spillage' will be reported to respective agency, which will be responsible for contingency measures of cleaning the spill within shortest possible time.
7. HIV/AIDS and STIS
• HIV/AIDS awareness creation to the workers.
•Provision of VCT services in the nearby health centres.
•Offer guidance and counseling to the workers.
•Provide recreational facilities in the camps to occupy workers free time.
•Provide condoms to the workers.
•Provide ARVs to affected workers.
The full report of the proposed project is available for inspection during working hours at :
(a) The Director-General National Environment Management
Authority, Kapiti Road, off Mombasa Road, P.O. Box
67839-00200, Nairobi.
(h) The Permanent Secretary, Ministry of Environment and
Natural Resources, National Hospital Insurance Fund
Building, Community, 4th Floor, P.O. Box 30521, Nairobi.
(c) District Environment Office, Wajir District.
The National Environment Management Authority invites members of the public to submit oral or written comments within thirty (30) days from the, date of publication of this notice to the
Director-General, National Environment Management Authority, to assist the authority in the approval process of the project.
Dated the I 5th August, 2008.
M. 0. MBEGERA. ' for Director-General, National Environment Management Authority.
Dated the 5th August, 2008.
30521,
Nairobi.
Extracted Entities (1)
previous_gazette_ref
3467
Details
- Act / Legislation
- THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
- Reference
- No. 8 of 1999
- Signed By
- 30521
- Title
- Nairobi
- Ministry
- Ministry of Environment
- Date Signed
- 5th August 2008
- Page
- 54
- Extraction Method
- regex
Source Gazette
Vol. CX No. 37 (SUPPLEMENT)
Published 2nd May 2008