Back
REGULATION 100% confidence via regex

GAZETTE NOTICE NO. 42

GAZETTE NOTICE NO. 42

THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT

(No. 8 of 1999)

REGULATION


PURSUANT to regulation 21 of the Environmental (Impact Assessment and Audit) Regulations, the National Environment Management Authority (NEMA) has received an environmental impact assessment study report for the implementation of proposed expansion of salt harvesting on L.R. No. 13427, Marereni, Malindi. The proposed project entails construction of brine concentration and salt harvesting ponds. The project is located at Marereni on plot No. L.R. 13427, Malindi. The project anticipates the following impacts and mitigation measures. Possible impacts Mitigation measures 1. Soil disturbance, erosion • Provide storm water drainage and subsequent effects channels. •Provide soil conservation structures. •Control construction activities during rainy seasons. •Plant grass with salinity tolerance on ponds. 2. Flora and fauna-loss of • Landscape and plant vegetation in all vegetation and open areas. biodiversity •Ensure free flow of water so as not to harm the habitat as a result of high salinity. 3. Human health, • All workers will be provided with occupational health and protective gear. safety. •Medical examinations for workers. •Install five alarms, equipment. 4. Water and soil pollution • Recycling of waste water in the evaporation ponds. •Provide proper sanitation for workers. •Proper waste disposal. 5. Waste management • Proponent will contract a private refuse handler. •Provision of waste collection facilities. 6.-Air and noise pollution • Regular sprinkling of water. • Regular maintenance of machines. • Protective equipment for workers. 7.Increased energy demands • Use energy conserving electric lamps 23rd May, 2008 THE KENYA GAZETTE 1225 Possible impacts Mitigation measures for lighting. • •Enhance energy conservation. •Use of alternative sources of energy. The full report of the proposed project is available for inspection during working hours at: (a)The Director-General, National Environment Management Authority, Kapiti Road, off Mombasa Road, P.O. Box 67839-00200, Nairobi. (b)The Permanent Secretary, Ministry of Environment and Natural Resources, National Hospital Insurance Fund Building, Community, 4th Floor, P.O. Box 30521, Nairobi. (c)Provincial Director of Environment, Coast Province. (d)• District Environment Officer, Malindi District The National Environment Management Authority invites members of the public to submit oral or written comments within thirty (30) days from the date of publication of this notice to the .Director-General, National Environment Management Authority, to assist the authority in the approval process of the project. Dated the 15th May, 2008. B. M. LANGWEN, for Director-General, National Environment Management Authority.

Dated the 15th May, 2008.

B. M. LANGWEN,

for Director-General, National Environment Management Authority.

Extracted Entities (1)

previous_gazette_ref

42

Details

Act / Legislation
THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
Reference
No. 8 of 1999
Signed By
B. M. LANGWEN
Title
for Director-General, National Environment Management Authority
Date Signed
15th May 2008
Page
44
Extraction Method
regex