Back
COMPLETION OF DEVELOPMENT PLAN 100% confidence via regex

GAZETTE NOTICE NO. 11918

GAZETTE NOTICE NO. 11918

THE KENYA COMMUNICATIONS ACT

(No. 2 of 1998)

COMPLETION OF DEVELOPMENT PLAN


NOTICE is given that the folloWing have, pursuant to the provisions of the Kenya Cormlunications Act. 1998,' . made applications to tonununications Commission of Kenya for the grant of licences as appears against their respective names: Name and Address Kampala Coachs Limited, P.O. Box 5254, Eldoret Essar Payment Services Kenya, P.O. Box 200-00600, Nairobi ' Language Solutions and Business Communications Limited, P.O. •Box 14384-00800, Nairobi Frotcom East Africa Limited, P.O: Box 15011-001,00. Nairobi Kenya Commercial Bank Limited, P.O. Box 484000-00100, Nairobi ■■■ Shtijaa Solutions Limited, P.O. Box 48183-00100. Nairobi Lairtech (Africa) Limited, P,O. Box 6384- Applications Services 00200, Nairobi Gateway Coonrier Services, P.O. Box 20- Regional Postal/Corier 00100, Nairobi Services The -reason for grant of the licences is to enable the applicant to . provide and operate Content Services, Applications Services, International Gateway Systems and Services and Postal/Cornier Services as indicated, against their respactiVe names. Thug rent of thcieliconces will affect public and local authorities, companies, persons or bodies of persons within the country. Any public or locakauthority, company, person or body of persona , desirous of -making any representation on or objection to the grant of such licences as aforesaid must do, so by a letter addressed to the Director-General. Communitations,Commission :of Kenya, Waiyaki Way, P.O. Box -14448-00800, Nairobi, indicating the "licence category" on the 'outside of the. cover enclosing -it on or before the expiry*" Sixty (60)days from the date of this notice and must fonvard to the applicant a copy of such representation or objection. -Dated the-5th December, 2008: _ C. J. K. NJOROGE, Director-General. licence Category Regional Postal/ Courier Services -Content Services Aplicationns Services International Gateway Systems and Services Content Services Content Services Content Services Applications Services GazErrENCMCE No. 11668 THE ENVIRONMENTAL MANAGEMENT AND CO- ORDINATION ACT (No. 8 of 1999) THE NATIONAL ENVIRONMENT MANAGEMENT AUTHORITY ENVIRONMENTAL IMPACT ASSESSMENT STUDY REPORT FOR THE IMPLEMENTATION OF THE PROPOSED KEROKA — NYANGUSU ROAD AND KIAMOKOMA LOOP • UP-GRADING INVITATION OF PUBLIC COMMENTS PURSUANT to Regulation 21 of Environmental Impact Assessment and Audit Regulations, the National Environment Management Authority (NEMA) has received an Environmental Impact Assessment Study Report for the implementation of proposed Keroka — Nyangusu Road and Kiamokoma Loop Up-grading.. The road project involves Earthworks, construction of pavements and bitumen surfacing. The project is located in Gucha and Kisii Central Districts. The road project cuts through Masaba Division, Nyancheki Division, Kiamokoma Division and Keumbu Division. The project anticipates the following impacts and mitigation measures: Possible Impacts Mitigation Measures Water pollution • No solid waste, fuels or oils should be discharged ihto drainage and streams. •Contain leakages from maintenance. fueling and clearing of vehicles and construction equipment. •Control asphalt preparation plants and transfer facilities. •Identify point sources of pollution along the route and isolate them for professional handling. Sand and soil • Contaminated soil should be degradation removed from site and treated before disposal. •Control dumping of oil residuals, asphalt and vehicle parts. •Top soils from materials sites should be held on site for rehabilitation. •Stabilize out sections, fills and quarries. Topography, • Identify key environmental and solid hydrology features likely to be affected by and drainage cutting. •Integrate landscaping designs to moderate effects of cutting. •Stabilize road side surface with structures. •Vegetation should be left intact on stream flood plains for silt buffering. •All surface runoff to be directed to existing natural drains. Health, safety and security •Contractor to prepare and implement health and safety measures, and present there in a health and safety plan. •Sensitization on HIV/AIDS should be done in the workmen's camps. •Install appropriate signage on diversions for safety of road users. •Provide medical and insurance cover for all employees. Mitigation Measures •Material sites exploitation be planned such that one is exhausted and rehabilitated before opening another section. •Requested quarrying be formalized and benefits defined, no impacts to neighbours. Hold top soils, and vegetation matter near the quarries for back filling and rehabilitation. •Undertake an inventory of the types and qualities of waste generated. •Access opportunities for reducing solid waste generation from operations. •Determine appropriate management options for each type of waste. •Excess soil should be disposed off- sites appropriately. •Provisional material storage on site should be designed and installed. Possible Impacts Quarrying and borrow pits Waste Management (mainly soils, oil/grease, filters, camp waste, etc) The full report of the proposed project is available for inspection during working hours at: (a)Permanent Secretary, Ministry of Environment and Natural Resources, NHIF Building, P.O. Box 30521, Nairobi. (b)Director-General, .National Environment Management Authority, Kapiti Road, off Mombasa Road, P.O. Box 67839 — 00200, Nairobi. (c)District Environment Office, Kisii District. The National Environment Management Authority invites members of the public to submit oral or written comments within thirty (301, days from the date of publication of this notice to the Director4eneral, National Environment Management Authority, to assist the Authority in the approval process of the project. B. M. LANGWEN. for Director-General. National Environment Management Authority. GAZETTE NOTICE No. I i 919 THE PHYSICAL PLANNING ACT (Cap. 286) COMPLETION OF PART DEVELOPMENT PLANS (PDP Nos. R/372/2008/2 and R/372/2008/1 for Eiisting Site for County Council of Transmara Offices and Kilgoris Youth Polytechnic respectively NOTICE is given that preparation of the above part development plans were completed on the 21st November. 2008 and 18th November, 2008 respectively. The part development plan relates to land situated within Kilgoris Town, Transmara District. Copies of the part development plan as prepared have been deposited for public inspection at the offices of the District Physical Planning Officer, Transmara and the Clerk, County Council of Transmara at Kilgoris. • The copies so deposited are available for inspection free of charge by all persons interested at the offices of the District Physical Planning Officer, Transmara and the Clerk, County Council of Transmara, Kilgoris the between the hours of 8.00 a.m. to 5.00 p.m., Monday to Friday. Dated the 8th December. 2068. MUTUKU, for Director of Physical Planning. KENYA.bAZETTE Any interested person(s) who wi _ ligke . m connection erith or ohjecdort to the above-nernba7patt develnpluiutt plan may send such representation or objection in writing to be received by the District Physical. Planning Officer. P.O: Box, 401- - 40700., Kilgoris, not later than sixty (60)- days from the date of . publication of this notice' and any such representation or objection shall state the grounds on which it is made.

MUTUKU,

for Director of Physical Planning.

Extracted Entities (1)

previous_gazette_ref

11918

Details

Act / Legislation
THE KENYA COMMUNICATIONS ACT
Reference
No. 2 of 1998
Signed By
MUTUKU
Title
for Director of Physical Planning
Page
41
Extraction Method
regex