Back
COMPLETION OF DEVELOPMENT PLAN
100% confidence
via regex
GAZETTE NOTICE NO. 11918
GAZETTE NOTICE NO. 11918
THE KENYA COMMUNICATIONS ACT
(No. 2 of 1998)
COMPLETION OF DEVELOPMENT PLAN
NOTICE is given that the folloWing have, pursuant to the provisions of the Kenya Cormlunications Act. 1998,' . made applications to tonununications Commission of Kenya for the grant of licences as appears against their respective names:
Name and Address
Kampala Coachs Limited, P.O. Box 5254, Eldoret
Essar Payment Services Kenya, P.O. Box
200-00600, Nairobi '
Language Solutions and Business
Communications Limited, P.O. •Box
14384-00800, Nairobi
Frotcom East Africa Limited, P.O: Box
15011-001,00. Nairobi
Kenya Commercial Bank Limited, P.O.
Box 484000-00100, Nairobi
■■■
Shtijaa Solutions Limited, P.O. Box
48183-00100. Nairobi
Lairtech (Africa) Limited, P,O. Box 6384- Applications Services
00200, Nairobi
Gateway Coonrier Services, P.O. Box 20- Regional Postal/Corier
00100, Nairobi Services
The -reason for grant of the licences is to enable the applicant to .
provide and operate Content Services, Applications Services, International Gateway Systems and Services and Postal/Cornier
Services as indicated, against their respactiVe names.
Thug rent of thcieliconces will affect public and local authorities, companies, persons or bodies of persons within the country.
Any public or locakauthority, company, person or body of persona
, desirous of -making any representation on or objection to the grant of such licences as aforesaid must do, so by a letter addressed to the
Director-General. Communitations,Commission :of Kenya, Waiyaki
Way, P.O. Box -14448-00800, Nairobi, indicating the "licence category" on the 'outside of the. cover enclosing -it on or before the expiry*" Sixty (60)days from the date of this notice and must fonvard to the applicant a copy of such representation or objection.
-Dated the-5th December, 2008: _
C. J. K. NJOROGE, Director-General.
licence Category
Regional Postal/ Courier
Services
-Content Services
Aplicationns Services
International Gateway
Systems and Services
Content Services
Content Services
Content Services
Applications Services
GazErrENCMCE No. 11668
THE ENVIRONMENTAL MANAGEMENT AND CO-
ORDINATION ACT
(No. 8 of 1999)
THE NATIONAL ENVIRONMENT MANAGEMENT
AUTHORITY
ENVIRONMENTAL IMPACT ASSESSMENT STUDY REPORT
FOR THE IMPLEMENTATION OF THE PROPOSED KEROKA —
NYANGUSU ROAD AND KIAMOKOMA LOOP •
UP-GRADING
INVITATION OF PUBLIC COMMENTS
PURSUANT to Regulation 21 of Environmental Impact
Assessment and Audit Regulations, the National Environment
Management Authority (NEMA) has received an Environmental
Impact Assessment Study Report for the implementation of proposed
Keroka — Nyangusu Road and Kiamokoma Loop Up-grading..
The road project involves Earthworks, construction of pavements and bitumen surfacing.
The project is located in Gucha and Kisii Central Districts. The road project cuts through Masaba Division, Nyancheki Division, Kiamokoma Division and Keumbu Division.
The project anticipates the following impacts and mitigation measures:
Possible Impacts Mitigation Measures
Water pollution • No solid waste, fuels or oils should be discharged ihto drainage and streams.
•Contain leakages from maintenance.
fueling and clearing of vehicles and construction equipment.
•Control asphalt preparation plants and transfer facilities.
•Identify point sources of pollution along the route and isolate them for professional handling.
Sand and soil • Contaminated soil should be degradation removed from site and treated before disposal.
•Control dumping of oil residuals, asphalt and vehicle parts.
•Top soils from materials sites should be held on site for rehabilitation.
•Stabilize out sections, fills and quarries.
Topography, • Identify key environmental and solid hydrology features likely to be affected by and drainage cutting.
•Integrate landscaping designs to moderate effects of cutting.
•Stabilize road side surface with structures.
•Vegetation should be left intact on stream flood plains for silt buffering.
•All surface runoff to be directed to existing natural drains.
Health, safety and security
•Contractor to prepare and implement health and safety measures, and present there in a health and safety plan.
•Sensitization on HIV/AIDS should be done in the workmen's camps.
•Install appropriate signage on diversions for safety of road users.
•Provide medical and insurance cover for all employees.
Mitigation Measures
•Material sites exploitation be planned such that one is exhausted and rehabilitated before opening another section.
•Requested quarrying be formalized and benefits defined, no impacts to neighbours.
Hold top soils, and vegetation matter near the quarries for back filling and rehabilitation.
•Undertake an inventory of the types and qualities of waste generated.
•Access opportunities for reducing solid waste generation from operations.
•Determine appropriate management options for each type of waste.
•Excess soil should be disposed off- sites appropriately.
•Provisional material storage on site should be designed and installed.
Possible Impacts
Quarrying and borrow pits
Waste
Management
(mainly soils, oil/grease, filters, camp waste, etc)
The full report of the proposed project is available for inspection during working hours at:
(a)Permanent Secretary, Ministry of Environment and Natural
Resources, NHIF Building, P.O. Box 30521, Nairobi.
(b)Director-General, .National Environment Management
Authority, Kapiti Road, off Mombasa Road, P.O. Box
67839 — 00200, Nairobi.
(c)District Environment Office, Kisii District.
The National Environment Management Authority invites members of the public to submit oral or written comments within thirty (301, days from the date of publication of this notice to the
Director4eneral, National Environment Management Authority, to assist the Authority in the approval process of the project.
B. M. LANGWEN.
for Director-General.
National Environment Management Authority.
GAZETTE NOTICE No. I i 919
THE PHYSICAL PLANNING ACT
(Cap. 286)
COMPLETION OF PART DEVELOPMENT PLANS
(PDP Nos. R/372/2008/2 and R/372/2008/1 for Eiisting Site for
County Council of Transmara Offices and Kilgoris Youth Polytechnic respectively
NOTICE is given that preparation of the above part development plans were completed on the 21st November. 2008 and 18th
November, 2008 respectively.
The part development plan relates to land situated within Kilgoris
Town, Transmara District.
Copies of the part development plan as prepared have been deposited for public inspection at the offices of the District Physical
Planning Officer, Transmara and the Clerk, County Council of
Transmara at Kilgoris.
•
The copies so deposited are available for inspection free of charge by all persons interested at the offices of the District Physical Planning
Officer, Transmara and the Clerk, County Council of Transmara, Kilgoris the between the hours of 8.00 a.m. to 5.00 p.m., Monday to
Friday.
Dated the 8th December. 2068.
MUTUKU, for Director of Physical Planning.
KENYA.bAZETTE
Any interested person(s) who wi
_ ligke . m connection erith or ohjecdort to the above-nernba7patt develnpluiutt plan may send such representation or objection in writing to be received by the District Physical. Planning Officer. P.O: Box, 401-
- 40700., Kilgoris, not later than sixty (60)- days from the date of
. publication of this notice' and any such representation or objection shall state the grounds on which it is made.
MUTUKU,
for Director of Physical Planning.
Extracted Entities (1)
previous_gazette_ref
11918
Details
- Act / Legislation
- THE KENYA COMMUNICATIONS ACT
- Reference
- No. 2 of 1998
- Signed By
- MUTUKU
- Title
- for Director of Physical Planning
- Ministry
- Ministry of Environment And Natural
- Page
- 41
- Extraction Method
- regex
Source Gazette
Vol. CX No. 96
Published 9th February 2008