GAZETTE NOTICE NO. 3506

GAZETTE NOTICE NO. 3506

THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT

(No. 8 of 1999)

REGULATION


PURSUANT to regulation 21 of Environmental (Impact Assessment and Audit) Regulations, the National Environment Management Authority, (NEMA) has received an environmental impact assessment study report for the implementation of the proposed demolition and reconstruction of the Lamu Customs Jetty. The proposed project involves three phase‘s namely planning, demolition, reconstruction and operation of the jetty. The proposed demolition, construction and civil works and later on, subsequent operation of the jetty will be located on the Lamu waterfront. The following are the anticipated impacts and proposed mitigation measures: Possible Impacts Mitigation measures Soil erosion Control earthworks. Install drainage structures properly. Ensure management of excavation activities. Air pollution Stockpiles of earth should be sprayed with water or cover during dry seasons. Provide dust masks for the personnel in dust generation areas. Sensitize construction workers. Noise pollution Sensitize workforce including operators of construction machines. Install sound barriers for pile driving activity. Install portable barriers to shield compressors and other small stationary equipment where necessary. Put up signs to indicate construction activities. Maintain all equipments. Workers in the vicinity of high level noise to wear safety and protective gear. Dust generation Spray stock piles of earth with water. Cover all trucks hauling soil, sand and other loose materials. Provide dust screen where necessary. Exhaust emissions Vehicle idling time shall be minimized. Alternatively fuelled construction equipment shall be used where feasible. Equipment shall be properly tuned and maintained. Water sources Management of water usage. Avoid unnecessary wastage of water. Avail storage tanks. Harvesting of rain water. Site cleanliness and sanitary facilities Special attention shall be paid to the sanitary facilities on site. Garbage shall be disposed off periodically. Road safety Road signs on main roads. Enforce speed limits for construction vehicles. Possible Impacts Mitigation measures Public health and occupational safety Ensure proper solid waste disposal and collection facilities. Proper handling and disposal of solid waste. Provide suitable safety gear for all personnel. Biodiversity impact Non drilling of the sand dunes if found on site. Flora: very limited; moved if encountered Fauna. Best construction and drilling methods will be applied to avoid disturbance. Appropriate design and construction of the jetty. Regular monitoring. The full report of the proposed project is available for inspection during working hours at: (a) Director-General, the National Environment Management Authority (NEMA), Popo Road, off Mombasa Road, P.O. Box 67839–00200, Nairobi. (b) Permanent Secretary, Ministry of Environment and Mineral Resources, N.H.I.F. Building, Community, P.O. Box 30521, Nairobi. (c) Provincial Director of Environment, Coast Province. (d) District Environment Officer, Lamu District. The National Environment Management Authority invites members of the public to submit oral or written comments within thirty (30) days from the date of publication of this notice to the Director-General, NEMA, to assist the Authority in the approval process of the project. B. M. LANGWEN, for Director-General, MR1662219 National Environment Management Authority.

Dated the 1st April, 2011.

B. M. LANGWEN,

for Director-General, MR1662219 National Environment Management Authority.

Extracted Entities (1)

previous_gazette_ref

3506

Details

Act / Legislation
THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
Reference
No. 8 of 1999
Signed By
B. M. LANGWEN
Title
for Director-General, MR1662219 National Environment Management Authority
Date Signed
1st April 2011