GAZETTE NOTICE NO. 4227
GAZETTE NOTICE NO. 4227
THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
(No. 8 of 1999)
REGULATION
PURSUANT to regulation 21 of Environmental (Impact
Assessment and Audit) Regulations, the National Environment
Management Authority, (NEMA) has received an environmental impact assessment study report for the implementation of the proposed
80MW thermal power plant.
The proposed project will consist of five MAN 4-stroke medium speed diesel engines 18V48/60 and a steam turbine with a combined capacity of 80 MW, transformers, cables, switchgear, protection and metering equipment. Generation will be at 15 kV for step-up to 132 kV by a sub-station that will be constructed for the subsequent transmission of the generated electricity.
The project proposed site is along Nairobi-Thika Highway, about
38 km from Nairobi City Centre and 6 km to Thika Town. The site is on plot number L.R. 8380/2, measuring approximately 4 ha (10 acres) next to Mang‘u High School and opposite Witeithie Village.
The following are the anticipated impacts and proposed mitigation measures:
Possible Impact Mitigation measures
Extraction site impacts to ensure efficient use of raw materials in construction
Source building materials from local suppliers who use environmentally friendly processes in their operations.
Ensure accurate budgeting and estimation of actual construction material requirements to ensure that the least amount of material necessary is ordered.
Ensure that damage or loss of materials is kept minimal through proper storage.
Loss of vegetation cover Ensure proper demarcation and delineation of the project area to be affected by construction works.
Introduction and maintenance of vegetation (trees, shrubs and grass) on open spaces and around the site.
Design and implement an appropriate landscaping programme to help in re- vegetation of part of the project area after construction.
Possible Impact Mitigation measures
Air pollution by dust and
VOCs generated during construction process.
All personnel working on the project will be trained prior to starting construction on methods for minimizing air quality impacts during construction.
Construction heavy earth moving vehicle drivers will be under strict instructions to minimize unnecessary trips, refill petrol fuel tanks in the afternoon and minimize idling of engines.
Careful screening of construction site to contain and arrest construction-related dust.
Exposed stockpiles of e.g. dust and sand, will be enclosed, covered, and watered daily, or treated with non-toxic soil binders.
All workers will be required to wear protective gear while on site.
Ensure construction machinery and equipment are well maintained to reduce exhaust gas emission.
Pollution from Hazardous waste
Handling of the materials using the material safety data provided by the manufacturers.
Appoint a safety officer to ensure that proper disposal guideline are observed.
Ensuring that maintenance and/or piece of work carried out on any piece of equipment or construction work is undertaken by qualified personnel.
In case of spillage emergency spillage control measures to be instituted.
Containerization of any wastes and disposal through a licensed waste handler.
Noise and vibration by construction activities
Use of equipment designed with noise control elements will be adopted where necessary.
Trucks used at construction site shall be routed away from noise sensitive areas where feasible.
Idling time for pick-up trucks and other small equipment will be minimized to limited time.
All workers operating in noisy areas or operating noisy equipment will be provided with earpieces to protect against extreme noise.
Comply with L.N. 25: Noise prevention and control rules, 2005.
Workers accidents and hazards when handling hazardous wastes.
Adequate collection and storage of waste will be provided on site, and safe transportation to, and display methods at designated areas.
All receptacles for storing hazardous wastes shall be adequately covered.
All employees will be required to wear protective gear when handling hazardous wastes.
All workers will be adequately insured against unforeseen accidents.
Generation of solid waste Wastes to be collected regularly to control air pollution and vermin/insects etc.
Receptacles will be provided for waste storage prior to collection.
Resource recovery will be encouraged once the project takes off so as to shrink waste stream and recover non - recyclables.
Possible Impact Mitigation measures
THE KENYA GAZETTE 21st April, 2011
Refuse collection vehicles will be covered to prevent scatter of wastes by wind.
Wastes will be collected by a licensed operator to avoid illegal final dumping at unauthorized sites.
All persons involved in refuse collection shall be in full protective attire.
Workers accidents during construction process.
All workers will be sensitized before construction begins, on how to control accidents related to construction.
A comprehensive contingency plan will be prepared before construction begins, on accident response.
Possible Impact Mitigation measures
Accordingly, adherence to safety procedures will be enforced.
All workers to wear protective gear during construction, including helmets.
Construction work will be limited to daytime only.
The full report of the proposed project is available for inspection during working hours at:
(a) Director-General, the National Environment Management
Authority (NEMA), Popo Road, off Mombasa Road, P.O.
Box 67839–00200, Nairobi.
(b) Permanent Secretary, Ministry of Environment and Mineral
Resources, N.H.I.F. Building, Community, P.O. Box 30521, Nairobi.
(c) Provincial Director of Environment, Central Province.
(d) District Environment Officer, Thika District.
The National Environment Management Authority invites members of the public to submit oral or written comments within thirty (30) days from the date of publication of this notice to the
Director-General, NEMA, to assist the Authority in the approval process of the project.
B. M. LANGWEN, for Director-General, MR1681922 National Environment Management Authority.
Dated the 21st April, 2011.
B. M. LANGWEN,
for Director-General, MR1681922 National Environment Management Authority.
Extracted Entities (1)
previous_gazette_ref
4227
Details
- Act / Legislation
- THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
- Reference
- No. 8 of 1999
- Signed By
- B. M. LANGWEN
- Title
- for Director-General, MR1681922 National Environment Management Authority
- Ministry
- Ministry of Environment And Mineral
- Date Signed
- 21st April 2011
- Page
- 67
- Extraction Method
- regex
Source Gazette
Vol. CXIII No. 36
Published 21st April 2011