Back
REGULATION 100% confidence via regex

GAZETTE NOTICE NO. 4230

GAZETTE NOTICE NO. 4230

THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT

(No. 8 of 1999)

REGULATION


PURSUANT to regulation 21 of Environmental (Impact Assessment and Audit) Regulations, the National Environment Management Authority, (NEMA) has received an environmental impact assessment study report for the implementation of the proposed service station and restaurant development. The premise facilities will include a forecourt, canopy, service bay, carwash, tyre repair section, shop, restaurant and stores among other facilities. The project will be located on Plot No. LOC 6/Gikarangu/2123, Maragua District. Possible impacts Mitigation measures Loss of biodiversity and soil erosion Minimize disturbance to flora and fauna in the neighbouring areas. Apply soil erosion control measures and carryout landscaping. Air and noise pollution Ensure that noisy machineries are insulated/temporary fenced. Ensure strict enforcement of on-site speed limits. Avoid excavation works in dry weather and sprinkle water to reduce dust. Restrict construction activities to day time only. Waste management Contract a licenced waste collection and disposal company. Segregate, separate and re-use construction wastes. Connect to a proper septic system and internal sewer network. Provide an efficient drainage system and oil interceptor. Fit hoses with improved nozzle to minimize fuel spills. Traffic Provide acceleration and deceleration lanes. Provide proper warning signs. Fire safety Install proper fire fighting equipments and sensitize workers on fire safety. Avoid storage of flammable materials near possible fire source. Occupational health and safety, security Provide and enforce use of PPEs. Shield construction activities to minimize accidents. Provide first aid facilities and training. Provide adequate security. Water & energy use Harvest rain water and reuse water where possible. Install water conserving taps and energy conserving lighting system. Raise awareness on water and energy conservations Regulatory compliance Obtains all necessary permits & licences prior to operation. The full report of the proposed project is available for inspection during working hours at: (a) Director-General, the National Environment Management Authority (NEMA), Popo Road, off Mombasa Road, P.O. Box 67839–00200, Nairobi. (b) Permanent Secretary, Ministry of Environment and Mineral Resources, N.H.I.F. Building, Community, P.O. Box 30521, Nairobi. (c) Provincial Director of Environment, Central Province. (d) District Environment Officer, Maragua District. The National Environment Management Authority invites members of the public to submit oral or written comments within thirty (30) days from the date of publication of this notice to the Director-General, NEMA, to assist the Authority in the approval process of the project. WILKISTER MANAGI, for Director-General, MR1680394 National Environment Management Authority.

Dated the 21st April, 2011.

WILKISTER MANAGI,

for Director-General, MR1680394 National Environment Management Authority.

Extracted Entities (1)

previous_gazette_ref

4230

Details

Act / Legislation
THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
Reference
No. 8 of 1999
Signed By
WILKISTER MANAGI
Title
for Director-General, MR1680394 National Environment Management Authority
Date Signed
21st April 2011
Page
70
Extraction Method
regex