Back
REGULATION 100% confidence via regex

GAZETTE NOTICE NO. 7269

GAZETTE NOTICE NO. 7269

THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT

(No. 8 of 1999)

REGULATION


PURSUANT to regulation 21 of Enviro nmental (Impact Assessment and Audit) Regulations, the National Environment Management Authority, (NEMA) has received an environmental impact assessment study report for the implementation of the proposed 235 apartments. The project will entail construction of 235 3&2-bedroomed residential units on a 1.128 hectares. The development will be implemented in phases from block 1-47 depending on the success of the predecessor phases and it will entail 5 number 3&2-bedroomed apartments in each block, green area behind the blocks, parking on ground floor and a waste treatment plant. The proposed project is located on plot L.R Nos. 12715/7828-7875, Syokimau area, Mavoko Municipality next to Easy Prestige Apartments off Mombasa Road The following are the anticipated impacts and proposed mitigation measures: Possible Impact Mitigation measures Soil erosion and compaction The contractor will provide adequate soil conservation structures to ensure that areas prone to soil erosion are protected from runoff. Avoid steep slopes. Areas susceptible to erosion shall be properly sloped and compacted to reduce the effect of runoff, and shall be seeded immediately. Rehabilitation of exposed sites as soon as practicable. The site preparation activity should be scheduled. Re-plant degraded areas with local species common in the area to complement natural vegetation regeneration to improve ground cover. Occupational health and safety Ensure that building plans are approved by Mavoko Municipality Council. Workers will be provided with adequate PFEs during the construction phase, these will include working boots, overalls, helmets, goggles, earmuffs and goggles. Workers will also be provided with harnesses and proper secure equipment s for scaling heights. Workers will be provided with a well stocked first aid box, which will be replenished at all times and managed by trained first aiders. The proponent will ensure that the contractor thro‘ the project manager obtain a workmen‘s act, as well as ordinance and regulations. Adequate sanitary facilitates will be provided with proper segregation for both genders where applicable. The contractor will ensure that people providing food to the workers have been 1st July, 2011 THE KENYA GAZETTE 2037 sensitized on the safe handling of food to avoid outbreaks of food poisoning. Air and dust pollution The contractor to protect stockpiles of friable material subject to wind- throw by wetting, or with barrier, vegetable, or windscreen. Restrict speed on loose surface roads during dry or dusty conditions; incidence. Suppress dust during dry periods by use of water sprays. Maintain equipment in good running condition-no vehicle to be used that generates excessive black smoke. Enforce vehicle load restrictions to avoid excess emissions from engine overloading. The contractor shall institute appropriate measures to minimize or avoid air quality impacts. This can be achieved through formulation of air quality management plan. The contractor to minimize/control emission of dust due to traffic movement and erosion of stockpile material and exposed soil. The contractor to ensure that all equipment used and all facilitates erected on site are designed and operated to control the emission of smoke, dust, fumes and any other air impurity into the atmosphere. Noise pollution and excessive vibration The contractor shall comply with the legal requirements for the managements of the noise impact specified in the recently gazetted noise quality regulations. The contractor shall formulate noise management plan for minimizing the generation of noise and vibration from construction activities occurring on site and its impact on surrounding residents, businesses and workers. All internal combustion equipment will have properly functioning silencers ort mufflers. Neighbours to the site to be notified about the construction schedule and activities, including blasting, should it be required. Noise generating activities that take place near residential or sensitive institutional receptors will be restricted to between 0600-2000hrs, which is defined as ‗daytime‘ in the Kenyan noise regulations. Increase in solid waste Proponent will use an integrated solid waste management system by source reduction, recycling, composting, reuse or sanitary land filling. The proponent will ensure that debris is collected by a NEMA approved waste handlers. There will be central collection point for waste gene8rated preferably with segregation of the same. The proponent will provide or construct proper waste receptacles to avoid littering. Effluent disposal The proponent will use waste treatment plant for effluent management. The proponent will ensure that the materials used for construction are of the right standards as per the building code. The proponent will ensure that required standards of effluent are maintained before disposal is done through quarterly laboratory analysis. The proponent will ensure that there are routine checks for the sewer lines to ensure that there are no leakages. Security Traffic movement for construction vehicles The proponent will ensure that guards are available and proper intrusion surveillance equipments are installed and are working all the times. The proponent will ensure that there is adequate lighting in all areas and risk assessment is done regularly to identify any new threats. The proponent will ensure the neighbours are informed through signage about irregular movements and guards to be used to direct traffic. Water resources and water quality Remedial measures shall be implemented by the Contractor in the event of erosion resulting in the sedimentation of surrounding areas after due consideration of the costs and benefits of such removal activity. Infrastructure shall be designed to ensure that contaminated run-off does not reach watercourses. In the event of an oil spill the procedures contained in the emergency response plan will come into effect. The full report of the proposed project is available for inspection during working hours at: (a) Director-General, the National Environment Management Authority (NEMA), Popo Road, off Mombasa Road, P.O. Box 67839–00200, Nairobi. (b) Permanent Secretary, Ministry of Environment and Mineral Resources, N.H.I.F. Building, Community, P.O. Box 30521, Nairobi. (c) Provincial Director of Environment, Eastern Province. (d) District Environment Officer, Machakos District. The National Environment Management Authority invites members of the public to submit oral or written comments within thirty (30) days from the date of publication of this notice to the Director-General, NEMA, to assist the Authority in the approval process of the project. Z. O. OUMA, for Director-General, MR2067739 National Environment Management Authority.

Dated the 1st July, 2011.

Z. O. OUMA,

for Director-General, MR2067739 National Environment Management Authority.

Extracted Entities (1)

previous_gazette_ref

7269

Details

Act / Legislation
THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
Reference
No. 8 of 1999
Signed By
Z. O. OUMA
Title
for Director-General, MR2067739 National Environment Management Authority
Date Signed
1st July 2011
Page
62
Extraction Method
regex