Back
OTHER 89% confidence via regex

GAZETTE NOTICE NO. 7256

PURSUANT to clause 1 of part III of the Schedule of Tariffs 2008, notice is given that all prices for electrical energy specified in part II of the said schedule will be liable to a fuel cost charge of plus 715 cents per kWh. for all meter readings taken in June, 2011. Information used to calculate the fuel cost charge: Power Station Fuel Price in Sh./Kg. (Ci) May, 2011 Fuel Displacement Charge/Fuel Charge May, 2011 Sh./kWh. Variation from April, 2011 Prices Increase/(Decrease) Units in May, 2011 in kWh. (Gi) Kipevu I Diesel Plant 60.85 2.66 22,327,000 Kipevu II Diesel Plant (Tsavo) 64.30 5.79 37,484,400 Kipevu III Diesel Plant 59.09 4.39 52,330,000 Rabai Diesel 75.64 5,39 30,229,000 Iberafrica Diesel 68.92 1.28 35,972,757 Iberafrica Diesel–Additional Plant 68.83 1.23 35,116,400 Mumias Sugar Company 2.90 0.05 3,237,000 Orpower4 3.10 (0.13) 32,263,020 UETCL Import 15.02 0.66 2,098,400 UETCL Export 15.02 0.66 (2,581,600) Emergency Power (Embakasi 4) 99.91 4.29 18,782,310 Emergency Power (Embakasi 5) 99.92 4.30 7,672,490 Garissa Diesel 102.35 6.96 1,423,596 Lamu Diesel 107.95 3.99 552,547 Lodwar Diesel 128.38 8.86 316,114 Mandera Diesel 146.14 6.71 346,213 Marsabit Diesel 126.83 11.08 187,564 Wajir Diesel 132.63 9.50 442,142 Moyale Diesel 125.15 6.10 169,915 Mpeketoni 113.48 3.03 95,880 Hola 120.26 6.91 146,617 Merti 115.94 8.71 15,486 Power Station Fuel Price in Sh./Kg. (Ci) May, 2011 Fuel Displacement Charge/Fuel Charge May, 2011 Sh./kWh. Variation from April, 2011 Prices Increase/(Decrease) Units in May, 2011 in kWh. (Gi) Habaswein 98.65 0.38 53,426 Elwak 112.99 (0.47) 35,806 Mfangano 105.87 — 7,540 Baragoi 92.76 1.66 13,158 Total units generated and purchased including hydros, excluding export (G) = 635,887,879 kWh. L. K. NJAGI, MR1944256 Company Secretary.

Extracted Entities (1)

previous_gazette_ref

7256

Details

Signed By
L. K. NJAGI
Title
MR1944256 Company Secretary
Date Signed
24th June 2011
Page
49
Extraction Method
regex