Back
REGULATION
100% confidence
via regex
GAZETTE NOTICE NO. 9491
GAZETTE NOTICE NO. 9491
THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
(No. 8 of 1999)
REGULATION
PURSUANT to regulation 21 of Environmental (Impact
Assessment and Audit) Regulations, the National Environment
Management Authority, (NEMA) has received an environmental impact assessment study report for the implementation of the proposed
Nyosia Farm.
The proposed development is for the proposed Nyosia farm to be utilized by Kisii University College. The University intends to develop the farm into a fully fledged faculty of Agriculture and Natural resources including hostels, lecture halls, laboratories, Offices, workshops, catering, library, processing and value addition plant.
The proposed project (hereafter called Nyosia farm) is located at
Nyosia Village, Kegati sub-location, Kegati location, Keumbu division, Kisii Central District. It is about 2 kilometres off the Kisii
Keroka road turning at the Kegati water treatment works following the
Kegati Rigoma Road.
The following are the anticipated impacts and proposed mitigation measures:
Possible Environmental
Impacts
Suggested Mitigation Measures
Dust Use water boozers to minimize dust pollution.
Erect a 3 m high iron sheet fence to restrict spread of dust during construction of farm structures.
Noise Provide ear muffs to workers.
Proper maintenance of construction vehicles, machinery and equipment.
Institute a strict inspection program for all machineries.
Socio-economic Awareness creation on modern livestock and farming husbandry.
Adoption of modern livestock breeds and agricultural practices.
introduction of fodder crops and their adoption to neighborhood.
Natural terrain and scenery
Planting of indigenous, nectar-rich and environmentally-friendly tree species along the river bank buffer strip.
Soil conservation measures.
Runoff harvesting.
Minimize environmental disturbances.
Rehabilitate affected areas.
Site accidents
Health and safety
Provision of first Aid Kit to workers.
Training workers on first Aid techniques.
Display emergency numbers at strategic points.
Disposal of waste effluents
Ensure regular checks on the drains and waste manholes.
Instill strict personal hygiene among farm workers.
Recycle/re-use strategies (Biogas).
Construction of septic systems/ purification const. wetlands.
Land and aquatic ecosystem utilization
Ensure appropriate stocking levels.
Re-use of pong water for farm.
Ensure appropriate stocking levels.
Re-use of pong water for farm irrigation.
Maintain vegetative buffer zones along the stream.
Employ well trained chemical operators.
Colonization of the river valley ecosystem
Establish indigenous & nectar-rich tree shrubs.
Restrict & inspect imported bee species to the farm.
Employ well trained apiculture technicians.
Use of agro-chemicals
Noise emission
Adoption of integrated Pesticide management (IPM) including biological control methods.
THE KENYA GAZETTE 5th August, 2011
Recruit well trained chemical operators.
Overflow of sewage onto the ground surface
Ensure regular checks on the drains and waste manholes.
Instill strict personal hygiene among farm workers.
Recycle/re-use strategies (Biogas).
Construction of septic systems/ purification const. wetlands.
The full report of the proposed project is available for inspection during working hours at:
(a) Director-General, the National Environment Management
Authority (NEMA), Popo Road, off Mombasa Road, P.O. Box
67839–00200, Nairobi.
(b) Permanent Secretary, Ministry of Environment and Mineral
Resources, N.H.I.F. Building, Community, P.O. Box 30521, Nairobi.
(c) Provincial Director of Environment, Nyanza Province.
(d) District Environment Officer, Kisii District.
The National Environment Management Authority invites members of the public to submit oral or written comments within thirty (30) days from the date of publication of this notice to the
Director-General, NEMA, to assist the Authority in the approval process of the project.
B. M. LANGWENI, for Director-General, MR7680014 National Environment Management Authority.
Dated the 5th August, 2011.
B. M. LANGWENI,
for Director-General, MR7680014 National Environment Management Authority.
Extracted Entities (1)
previous_gazette_ref
9491
Details
- Act / Legislation
- THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
- Reference
- No. 8 of 1999
- Signed By
- B. M. LANGWENI
- Title
- for Director-General, MR7680014 National Environment Management Authority
- Ministry
- Ministry of Environment And Mineral
- Date Signed
- 5th August 2011
- Page
- 63
- Extraction Method
- regex
Source Gazette
Vol. CXIII No. 76
Published 5th August 2011