GAZETTE NOTICE NO. 11943
GAZETTE NOTICE NO. 11943
THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
(No. 8 of 1999)
REGULATION
PURSUANT to regulation 21 of Environmental (Impact
Assessment and Audit) Regulations, the National Environment
Management Authority, (NEMA) has received an environmental impact assessment study report for the implementation of the proposed liquefied petroleum gas storage and distribution depot.
The proponent proposes to construct and operate an LPG storage and distribution terminal. The project will in include construction of the following infrastructure: LPG storage area comprising of four steel
LPG mounted tanks having a total capacity of 800m
, cylinder filing area which comprise of filling shed and storage ar ea, compressor/pump house, LPG loading and offloading area, LPG accessories store, fire fighting shed, fire fighting system, generator/switch room building, weigh bridge, office block and a workshop/worker rooms/toilets
The proposed project is located off Mombasa road on plot No.
12715/604 which is approximately 2.022 hectares in size.
The following are the anticipated impacts and proposed mitigation measures:
Environmental issue Mitigation Measures
Air quality Develop and implement effective measures for minimization of dust during construction phase.
Ensure that construction and demolition take into account the need to prevent and minimize release of fugitive emissions during the operational phase.
Ensure the design, monitoring and safety systems installed for the facility must comply with established industry standards and national and international best practice.
Implement, audit and regularly improve
HSE measures for emergency response to air pollution incidents during the operation phase.
Waste Develop and implement safe procedures for management of non hazardous and hazardous wastes in accordance with
L.N. 121, Waste Management
Regulations of 2006.
Contractor is responsible for waste during construction and the proponent during the operational phase of the project.
Spill response Establish an early warning system and identification of contingency plans for spill response.
Waste Water management
Monitor quality of water used as hydroset water for the storage tanks and pipelines used for the project before being discharged into the environment.
Management of water quality as per
L.N. 120, the Water Quality regulations of 2006.
23rd September, 2011 THE KENYA GAZETTE
Noise and vibration Implement measures during the construction, operation and decommissioning phases to prevent and manage noise and vibration.
Socio-economic Compatibility with existing and proposed land uses.
Proponent to create public awareness about ‗safe‘ land uses of any future projects in the vicinity of the proposed project area.
Implement where feasible measures to employ local community members during both construction and operational phase.
Occupational health and safety
Risk of fire outbreak and explosion
Develop, and implement measures to promote the health and safety of contractors and employees during construction and operational phases.
Develop, and implement measures to minimize risks and injuries to the workers and public during construction and operational phases.
The full report of the proposed project is available for inspection during working hours at:
(a) Director-General, the National Environment Management
Authority (NEMA), Popo Road, off Mombasa Road, P.O. Box
67839–00200, Nairobi.
(b) Permanent Secretary, Ministry of Environment and Mineral
Resources, N.H.I.F. Building, Community, P.O. Box 30521, Nairobi.
(c) Provincial Director of Environment, Eastern Province.
(d) District Environment Officer, Machakos District.
The National Environment Management Authority invites members of the public to submit oral or written comments within thirty (30) days from the date of publication of this notice to the
Director-General, NEMA, to assist the Authority in the approval process of the project.
Z. O. OUMA, for Director-General, MR8256153 National Environment Management Authority.
Dated the 23rd September, 2011.
Z. O. OUMA,
for Director-General, MR8256153 National Environment Management Authority.
Extracted Entities (1)
previous_gazette_ref
11943
Details
- Act / Legislation
- THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
- Reference
- No. 8 of 1999
- Signed By
- Z. O. OUMA
- Title
- for Director-General, MR8256153 National Environment Management Authority
- Ministry
- Ministry of Environment And Mineral
- Date Signed
- 23rd September 2011