Back
REGULATION 100% confidence via regex

GAZETTE NOTICE NO. 14284

GAZETTE NOTICE NO. 14284

THE ENVIRONMENTAL MANAGEMENT AND CO - ORDINATION ACT

(No. 8 of 1999)

REGULATION


PURSUANT to regulation 21 of Environmental (Impact Assessment and Audit) regulations, the National Environmental Management Authority (NEMA) has received an Environmental Impact Assessment Study Report for the implementation of the proposed 200 3-bedroomed apartments. The proposed development will entail construction of 200 spacious apartments (in 20 blocks each having 10 units) with excellent finishes on a five acre compound. They will be 3 bedrooms (plus DSQ) with a plinth area of approximately 150 sq metres. These will be built in phases development will include a jogging truck, ample parking, baby swimming pool, Gazebo, baby class, shops and recreational areas. The proposed project is located on plot L.R No. 7149/26, before Mlolongo, along Mombasa Road, Mavoko Municipality. The site is next to the railway line after Muthama Heights and Easypark apartments The following are the anticipated impacts and proposed mitigation measures: Environmental issue Mitigation Measures Soil Erosion and Compaction The contractor will provide adequate soil conservation structures to ensure that areas prone to soil erosion are protected from runoff. Areas susceptible to erosion shall be properly sloped and compacted to reduce the effect of runoff, and shall be seeded immediately; Rehabilitation of exposed sites as soon as practicable The site preparation activity should be scheduled Re-plant degraded areas with local species common in the area to complement natural vegetation regeneration to improve ground cover. Occupational Health and Safety Workers will be provided with adequate Personal Protective Equipment during the construction phase, these will include safety boots, overalls, helmets, goggles and earmuffs. Workers will also be provided with safety harnesses and proper secure equipment for scaling heights Workers will be provided with a well stocked first aid box, which will be replenished at all times and managed by trained first aiders. Sensitize workers on occupational health and safety. Adequate sanitary facilitates will be provided with proper segregation for both genders where applicable. Fencing off the entire construction site Air and dust pollution The contractor to protect stockpiles of friable material subject to wind- throw by wetting, or with barrier or windscreen; Restrict speed on loose surface roads during dry or dusty conditions; incidence Suppress dust during dry periods by use of water sprays; Maintain equipment in good running condition-no vehicle to be used that generates excessive black smoke; Enforce vehicle load restrictions to avoid excess emissions from engine overloading; The contractor shall institute appropriate measures to minimize or avoid air quality impacts. This can be achieved through formulation of air quality management plan The contractor to minimize/control emission of dust due to traffic movement and erosion of stockpile material and exposed soil. The contractor to ensure that all equipment used and all facilitates erected on site are designed and operated to control the emission of smoke, dust, fumes and any other air impurity into the atmosphere; Noise Pollution and Excessive Vibration The contractor shall comply with the legal requirements for the managements of the noise impact specified in the recently 11th November, 2011 THE KENYA GAZETTE gazetted noise quality regulations. The contractor shall formulate noise management plan for minimizing the generation of noise and vibration from construction activities occurring on site and its impact on surrounding residents, businesses and workers. All internal combustion equipment will have properly functioning silencers ort mufflers; Neighbours to the site to be notified about the construction schedule and activities, including blasting, should it be required; Restriction of construction activities to daytime only.. Increase in Solid Waste Proponent will use an integrated solid waste management system by source reduction, recycling, composting, reuse or sanitary land filling. The proponent will ensure that debris is collected by a NEMA approved waste handlers. There will be a central collection point for waste generated preferably with segregation of the same. The proponent will provide or construct proper waste receptacles to avoid littering. Effluent Disposal The proponent will connect to Mavoko sewer trunk line along Mombasa road. The proponent will ensure that the materials used for construction are of the right standards as per the building code. The proponent will ensure that there are routine checks for the sewer lines to ensure that there are no leakages. Security Traffic Movement for Construction Vehicles The proponent will ensure that guards are available and proper intrusion surveillance equipments are installed and are working all the times. The proponent will ensure that there is adequate lighting in all areas and risk assessment is done regularly to identify any new threats. The proponent will ensure the neighbours are informed through signage about irregular movements and guards to be used to direct traffic Water Resources and Water quality Measures shall be instituted to minimize erosion and sediment transport, especially during construction activities. These measures should include: limiting areas cleared of vegetation, stabilizing the soils on the sloppy areas with stone pitching and planting of grass. Remedial measures shall be implemented by the Contractor in the event of erosion resulting in the sedimentation of surrounding areas after due consideration of the costs and benefits of such removal activity Infrastructure shall be designed to ensure that contaminated run-off does not reach watercourses In the event of an oil spill the procedures contained in the emergency response plan will come into effect. The full report of the proposed project is available for inspection during working hours at: (a) Director General, NEMA, Popo Road, off Mombasa Road, P.O. Box 67839-00200, Nairobi. (b) Permanent Secretary, Ministry of Environment and Mineral Resources, NHIF Building, Community, P.O. Box 30521, Nairobi. (c) Provincial Director of Environment, Eastern Province. (d) District Environment Officer, Machakos District. The National Environment Management Authority invites members of the public to submit oral or written comments within thirty (30) days from the date of publication of this notice to the Director General, NEMA, to assist the Authority in the decision making process of the plan. OUMA Z. O., For: Director General, MR8245826 National Environment Management Authority.

Dated the 11th November, 2011.

OUMA Z. O.,

For: Director General, MR8245826 National Environment Management Authority.

Extracted Entities (1)

previous_gazette_ref

14284

Details

Act / Legislation
THE ENVIRONMENTAL MANAGEMENT AND CO - ORDINATION ACT
Reference
No. 8 of 1999
Signed By
OUMA Z. O.
Title
For: Director General, MR8245826 National Environment Management Authority
Date Signed
11th November 2011
Page
42
Extraction Method
regex