GAZETTE NOTICE NO. 15429
PURSUANT to clause 1 of part III of the Schedule of Tariffs 2008, notice is given that all prices for electrical energy specified in part II of the said schedule will be liable to a fuel cost charge of plus 607 cents per kWh. for all meter readings taken in October, 2012.
Information used to calculate the fuel cost charge:
Power Station Fuel Price in Sh./Kg.
(Ci) September, 2012
Fuel Displacement Charge/Fuel
Charge September, 2012 Sh./kWh. Variation from August, 2012
Prices Increase/(Decrease)
Units in September, 2012 in kWh. (Gi)
Kipevu I Diesel Plant 66.94 5.14 18,726,000
Kipevu II Diesel Plant (Tsavo) 66.26 3.92 15,580,500
Kipevu III Diesel Plant 68.94 7.09 31,192,000
Embakasi GT2 99.37 8.39 1,600,499
Rabai Diesel (with steam turbin) 70.20 4.59 31,179,000
Iberafrica Diesel 71.60 0.54 26,493,643
Iberafrica Diesel–Additional Plant 71.39 0.54 27,774,560
Mumias Sugar Company 2.88 0.02 8,035,000
Orpower4 3.01 0.06 35,562,850
UETCL Import 16.80 0.90 2,651,900
UETCL Export 16.80 0.90 (1,907,400)
Olkaria Welhead OW37 5.03 0.03 2,258,590
Emergency Power (Embakasi 8) New 115.82 7.96 14,315,360
Emergency Power (Embakasi 7) 115.83 7.96 9.763,670
Emergency Power (Muhoroni) 117.94 7.81 4.563,960
Garissa Diesel 102.54 11.73 1,628,624
Lamu Diesel 101.49 7.48 535,362
Lodwar Diesel (thermal) 134.31 3.85 350,529
Mandera Diesel 143.40 3.84 406,045
Marsabit Diesel (thermal) 137.09 5.82 189,225
Wajir Diesel 135.18 7.17 423,251
Moyale Diesel (thermal) 142.96 3.77 1,520
Mpeketoni 120.07 2.18 149,305
Hola (thermal) 114.67 (4.89) 163,548
THE KENYA GAZETTE 26th October, 2012
4128 4128
Power Station Fuel Price in Sh./Kg.
(Ci) September, 2012
Fuel Displacement Charge/Fuel
Charge September, 2012 Sh./kWh. Variation from August, 2012
Prices Increase/(Decrease)
Units in September, 2012 in kWh. (Gi)
Merti (thermal) 134.69 (2.39) 17,045
Habaswein (thermal) 128.39 (4.74) 68,685
Elwak (thermal) 142.90 (1.26) 39,550
Baragoi 126.16 (0.64) 14,892
Mfangano 129.70 — 10,824
Lokichogio 140.58 5.41 42,055
Tabaka (New) 144.80 11,445
Eldas (New) 151.22 6,243
Rhamu (New) 143.61 24,200
Emergency Powe Energy Charge Recovery 0.76 — 28,642,990
WARMA Water use Charge for Hydro plants above 1mW—
Recovery for September, 2012
0.05
—
333,488,620
Total units generated and purchased including hydros, excluding export (G) = 657,173,675 kWh.
L. K. NJAGI, Company Secretary.
Extracted Entities (1)
previous_gazette_ref
15429
Details
- Signed By
- L. K. NJAGI
- Title
- Company Secretary
- Date Signed
- 26th October 2012