GAZETTE NOTICE NO. 11795
GAZETTE NOTICE NO. 11795
THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
(No. 8 of 1999)
REGULATION
PURSUANT to regulation 21 of Environmental (Impact
Assessment and Audit) Regulations, the National Environmental
Management Authority (NEMA) has received an Environmental
Impact Assessment Study Report for the implementation of the proposed Thome Gulf Energy Service Station on plot L.R. no. block
110 along the Eastern by – Pass, Roysambu Location in Nairobi
County.
The Proponent (Gulf Energy Limited) of the proposed Thome Gulf
Energy Service Station is proposing to carry on construction of a fully equipped service station with fuel reception bay for offloading purposes, underground fuel storage tanks, LPG storage room, lubes store, generator and compressor rooms, pump dispensers and a restaurant. The station will also have an office, pit stop service, a store for its products and adequate parking area.
The following are the anticipated impacts and proposed mitigation measures:
17th August, 2012 THE KENYA GAZETTE
Possible Impact Mitigation measures
Dust and gaseous emissions
Watering should be done where appropriate during construction.
Control speed and operation of vehicle on site.
Use environmentally clean fuels for the vehicles.
Solid waste generation A reputable solid waste handler will be contracted to regularly collect solid waste.
There will be adequate provision of strategically placed waste bins at the facility to ensure that there is no idle litter.
Use durable long lasting materials that shall not need to be replaced as often thereby reducing the amount of construction wastes generated over time.
Loss of top soil cover Resurface/pave open areas after the completion of the project.
Apply soil erosion control measures such as the leveling of project site to reduce runoff, velocity and increase infiltration of storm water into the soil.
Surface drainage system Drainage channels should be covered with gratings to prevent occurrence of accidents and entry dirt that would compromise flow of run-off.
The channels should be designed with regards to the peak volumes such as periods or seasons when there is high intensity of rainfall for avoid overflow.
Provide suitable storm water drainage channels to effectively discharge water to safe areas.
Maintain existing drainage channels to avoid blockages.
Increased energy demand Switch off all electrical appliances when not in use.
Put off all lights immediately when not in use/required or are not needed.
Use energy conserving electric lamps for general lighting.
Accidents and occupational risks
Implementation of safety measures and emergency plans to contain accident risks associated with the product being handled.
A fully equipped first aid kit.
The contractor should have workmen‘s compensation cover.
Noise Workers should be provided with
Personal Protective Equipment such as earmuffs when operating noisy operations.
There should not be unnecessary horning of the trucks at the site.
Vehicle drivers and machinery operators to switch off engines of vehicles or machineries not being used.
Noisy operations should be done during the day.
Leaks from installations Regularly tests to ensure integrity of the installations such as air separators, valves, couplings, dispensing hoses and storage tanks.
Drops or wetness to ensure no leakage must be checked regularly.
Inventory management / stock reconciliation shall be done daily to ensure no leakages and to monitor available stocks.
Installations shall be made of strong material such as steel to ensure no leaks.
Cross contamination Use color codes for product storage tank identification.
Offload one product at a time.
Carry out density tests to confirm the quality of the product being offloaded .
Accidental spills Sound engineering must be put in place.
Reliable operations and effective written operating procedures, good preventive and predictive maintenance techniques commitment to safety.
Oil interceptors should be provided.
Risk of fire Install smoke detectors at strategic locations.
Install gas detection system in a strategic location.
Install fire alarms.
Install and maintain firefighting equipment located at strategic points
Sand buckets shall be easily accessible, full and ready to use.
Observe safety precautions during loading and offloading of trucks.
Forecourt should be clean, no litter, oil or spillage.
―No Smoking‖ rule shall be observed and all signs displayed, clean and easily legible to the customer.
No use of mobile phones at the forecourt.
All electrical components at the site shall be of appropriate quality to minimize risks associated with faulty electrical fittings.
Emergency response plan Provide emergency numbers at strategic points.
Ensure that all workers have access to communication facilities (phones etc.) for quick emergency response.
Install emergency Stop Buttons.
Install firefighting equipment and train staff on how to use them.
Install vehicle collision protection bars at the loading bay.
Traffic flow management Ensure sufficient parking space.
Avoid unnecessary delays at the loading bay.
One staff should be assigned the role of traffic management.
The full report of the proposed project is available for inspection during working hours at:
(a) Director-General, NEMA, Popo Road, off Mombasa Road, P.O. Box 67839–00200, Nairobi.
(b) Permanent Secretary, Ministry of Environment and Mineral
Resources, NHIF Building, Community, P.O. Box 30521, Nairobi
(c) County Director of Environment, Nairobi County.
The National Environment Management Authority invites members of the public to submit oral or written comments within thirty (30) days from the date of publication of this notice to the
Director-General, NEMA, to assist the Authority in the decision making process of the plan.
THE KENYA GAZETTE 17th August, 2012
3050 3050
B. M. LANGWEN, for Director-General, MR/0430891 National Environment Management Authority.
GAZZETE NOTICE NO. 11796
THE LOCAL GOVERNMENT ACT
(Cap. 265)
THE TOWN COUNCIL OF UKWALA
REPOSSESSION OF UNDEVELOPED PLOTS
NOTICE is given to all the concerned parties that following the numerous repossession notices issued to them concerning the intention by the council to repossess the undeveloped plots within the jurisdiction of the council, pursuant to the provision of the Local Government Act, and pursuant to allotment conditions contained in the ‗Allocation of plots‘ by-laws together with the Council‘s resolution made on 12th April, 2012, under Full
Council Minute No. UTC/FC/03/2012, all the undeveloped plots that appear in the table below shall be repossessed by the council after the lapse of twenty-one (21) days from the date of this notice and the plots will be allocated to new applicants for development.
Name Plot No. Size Market Centre
Thomas Owino Ogonda 06 SITE 705 50x100 Ukwala
Mathew Collins Omondi 10A 40x80 Yenga
William Achieng 24 80x40 Yenga
Henry Wandera Baraza 10 40x80 Uriya
Vincent Omondi Onjoro F 80x40 Aboke
George Omondi Okwayo 11 80x40 Yenga
Daniel Onyango A 100x50 Sega
Benson Owino Omondi 44 40x80 Yenga
Michael Oloo Odhiambo 06 40x80 Bar-Awendo
Joseph Otieno Ochieng 09 40x80 Uriya
M/s Hugo Maro and W.Adongo 1 80x40 Kagonya
Joseph Siambe 2 80x40 Kagonya
M/s E.Mwanga Olila and Co. 3 80x40 Kagonya
M/s P.Opiyo &Co. 4 80x40 Kagonya
F.O.Olwenyo 5 80x40 Kagonya
N.Ochieng Ondulo 6 80x40 Kagonya
W.Onyango 7 80x40 Kagonya
Rosebella Akoth Jairo 11 80x40 Kagonya
Joseph Opiyo Mwenge 13 80x40 Kagonya
Julius Juma Dimo 15 80x40 Kagonya
Sylvarius Muga Mulungu 17 80x40 Kagonya
Christopher Ogola Siambe 14 80x40 Kagonya
Odero Aluoch&Adhiambo Lumbe 1 80x40 Lwero
Lucas Otieno&Co. 1A 80x40 Lwero
Adhiambo Lumbe&Odero Oluoch 2 80x40 Lwero
John Myoma Opondo 3 80x40 Lwero
Wangnaya&Co. 4 80x40 Lwero
M.L.T.R Oyugi&Co. 5 80x40 Lwero
Alex Odhiambo 6 80x40 Lwero
Hanyango Group Society 7 80x40 Lwero
M.L.Ajuang&Odero&Co. 8 80x40 Lwero
Odongo Owuor 9 80x40 Lwero
Mr.Alloys Ochieng 10 80x40 Lwero
Daudi Wambendha 15 80x40 Luhano
Ondeng Ogayo&Co. 18 80x40 Luhano
Obonyo Gaya &P.Nyambundo 19 80x40 Luhano
Thomas Owino Odipo B 80x40 Uwai
Nobert Odhiambo Akuom G 80x40 Uwai
Lawrence Oluoch 2 80x40 Odiado
Naboth Hangala 3 80x40 Odiado
Wilson Oduor 7 80x40 Odiado
Mr.Oguda Omolo &Okingo Ochiel 11 80x40 Odiado
William Opel 13 80x40 Odiado
Dated the 24th July 2012.
P. O.WAKINE, Town Clerk.
Dated the 24th July, 2012.
P. O.WAKINE,
Town Clerk.
Extracted Entities (1)
previous_gazette_ref
11795
Details
- Act / Legislation
- THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
- Reference
- No. 8 of 1999
- Signed By
- P. O.WAKINE
- Title
- Town Clerk
- Ministry
- Ministry of Environment And Mineral
- Date Signed
- 24th July 2012
- Page
- 80
- Extraction Method
- regex
Source Gazette
Vol. CXIV No. 76
Published 17th August 2012