Back
APPROVAL
100% confidence
via regex
GAZETTE NOTICE NO. 2703
GAZETTE NOTICE NO. 2703
THE WATER ACT
(No. 43 of 2016)
APPROVAL
in accordance with the requirements of section 139 of the Water Act, 2016.
After considering the application, the written and oral submissions by all stakeholders during the consultation period, and based on latest available data, WASREB has determined an upward tariff review for MAVWASCO is justified in order to improve service delivery, operate sustainably and protect consumer interests by meeting the tariff conditions.
WASREB gives a one (1) month notice to all existing and potential customers of MAVWASCO that the approved tariffs for the three financial years 2023/24, 2024/25, and 2025/26 shall be as follows:
8th March, 2024 THE KENYA GAZETTE
1.0 Approved Tariff Structure
1.1 Water Tariff Structure for the period 2023/2024 to 2025/2026
Consumer Categories Consumption Block Approved Tariff
(M3) (KSh./ M3)
Domestic/Residential 1-6 120
7-20. 135
21-50 152
51-100 157
100-300 162
>300 170
Multi-Dwelling Units N/A 152
Government Institutions 1-50 152
51-100 160
100-300 170
>300 180
Commercial/Industrial 1-50 152
51-100 160
100-300 170
>300 180
Public Schools/ Colleges/Universities 1-600 140
600<1200m3 150
>1200m3 160
Unique Consumer Categories Bulk Water Supply (Per m3) 152
Bowsing Points (Drawing point for private tankers)- Per m3 152
Water Kiosks (Per m3) 50
1.2 Sewerage Tariff Structure for the period 2023/2024 to 2025/2026 a) Consumers with a Water Connection i. Sewerage will be charged at 75% of the water volumes, billed at the tariff for water specified (in 1.1) above for all customer categories.
ii. Disconnected water accounts shall be charged based on the average of the last three months sewer charges before the disconnection.
b) Consumers without a Water Connection
Sanitation consumers without a water connection shall be charged as follows:
i. Single room, given an approximate water consumption of 2m3 sewer charge should be KSh. 180 per month.
ii. One and two-bedroom units, given an approximate water consumption of 5m3, sewer charge should be KSh. 450 per month.
iii. Three-bedroom units and above an approximate water consumption of 8m3, sewer charge should be KSh. 742 per month.
iv. All other categories: 75% of the volume of water consumed as per the metered source of water.
1.3 Miscellaneous Charges
These shall be as follows:
Item/ Service Charge (KSh.)
Water Deposit
Category of Consumer
Domestic 2,500
Multi Dwelling Units (MDU - Small); 4-10 units 5,000
Multi Dwelling Units (MDU - Medium); 11-20 units 10,000
Multi Dwelling Units (MDU - Large); > 21 units 20,000
Retail shops less than 10m3 3,000
Retail shops more than 10m3 3,500
Bar, restaurants less than 15 m3 4,000
Bar, restaurants more than 15 m3 6,000
Hotel less than 150 m3 12,000
Hotel more than 150 m3 15,000
Hospitals more than 150 m3 20,000
Health centres less than 150 m3 12,000
Schools less than 200 m3 10,000
Schools and other institutions more than 200 m3 20,000
Minor construction sites more than 200 m3 15,000
Major construction sites more than 300 m3 50,000
Light industries less than 200 m3 30,000
Medium industrial between 200 m3 and 300 m3 50,000
Heavy industries more than 300 m3 100,000
Water Kiosks 5,000
*Customers with only sewer connection to be charged a deposit equivalent to water connection
Other Charges
Service
New water connection fee 2,500
Water Reconnection fee–at meter point 1,000
Water Reconnection fee–at mains 5,000 and double deposit
Tanker – 8000, 16,000 litres 2,500, 5,000 respectively per tanker within WSP Service Area for all consumers
860 860
Item/ Service Charge (KSh.)
Sale of water per m3 at bowsing point (own tanker) As per rates specified (in 1.1) above
Replacement of stolen or damaged meters 100% of the market cost of the meter
Meter testing on request 500
Sewer Connection–Residential/ Domestic 2,500
Sewer Connection–Commercial, Government, schools, Universities and
Colleges
5,000
Sewer Connection-Industrial 15,000
Private sewer unblocking 2,500
Leak detection services 1,000
Sewer Reconnection fee (At mains) 15,000
For cutting off the supply at the request of the consumer 200
For turning on the supply otherwise than in respect of a first connection 200
Exhauster Services (Company Exhauster) 5,000 for other customers and 4,000 for informal settlements
Private Exhausters (Dumping into the company’s sewer system) 15,000 per truck per month
Penalties
Illegal water connection–Commercial, Industry, Construction (Fraud) 100,000 plus estimated consumption during the period of the illegality
Illegal water connection, (Fraud)–Domestic 30,000 plus estimated consumption during the period of the illegality
Overcharging (fraud) at water kiosk 15,000
Illegal sewer connection–Commercial, Industry, Construction 100,000
Illegal sewer connection–Domestic, Government, Schools, Universities and Colleges
30,000
Self-reconnection after cut off for non-payment 5,000 and billing to be backdated from date of cut off
Surcharge for tampering with meters (this to include meter removal, reversing of meter etc)
5,000
Surcharge for direct suction of water from the supply line using a pump 10,000
2.0 Analysis of Cost Structure
Below is the summary of the projected Annual cost structure that makes up the total costs to be incurred by MAVWASCO during the tariff period:
Expenditure Item 2021/22 2022/23 2023/24 2024/25 2025/26
Operations 202,728,191 219,671,788 234,612,579 258,101,918 270,163,270
Maintenance 29,998,159 36,837,963 40,349,471 44,271,852 48,666,790
Regulatory Levy (WASREB) 9,652,873 11,895,811 13,986,625 16,333,883 18,681,773
Abstraction Levy (WRA) 422,188 732,118 1,080,000 1,080,000 1,080,000
Operation and Maintenance (O & M) 242,379,223 268,405,562 288,948,675 318,707,653 337,511,832
Minor Investments - - 12,845,145 44,621,184 52,401,999
Total Costs 242,379,223 268,405,562 301,793,820 363,328,837 389,913,832
Total Billing (KSh.) 227,103,068 289,965,169 337,012,541 404,767,233 429,988,986
Collection Efficiency (%) 83% 85% 90% 95% 95%
Projected Revenue 188,495,546 246,470,394 303,311,287 384,528,871 408,489,537
O and M Cost Coverage 78% 92% 105% 121% 121%
Total Cost Coverage 78% 92% 101% 106% 105%
3.0 Conditions attached to the tariff approval.
The conditions attached to this approval which shall form part of the license conditions of MAVWASCO are:
i. Service Delivery Conditions attached to the Tariff
Target 2021/2022 2022/2023 2023/2024 2024/2025 2025/2026
Water Coverage (%) 49% 50% 51% 52% 53%
Water quality standards (%) 60% 100% Compliance with Standards
Personnel Expenditure as % of
O and M 31% 30% 29% 27% 27%
Non-Revenue Water 30% 29% 27% 25% 25%
Hours of Supply (Hrs.) 6 6 7 8 9
Staff per 1000 connections 6 6 5 5 4
Maintenance Expenditure as % of O and M 12% 14% 13% 13% 14%
Metering ratio (%) 100% 100% 100% 100% 100%
Collection Efficiency (%) 83% 85% 90% 95% 95%
Resale at Kiosk Kshs. 3.00 per 20l Jerry Can i. Annual budgets: The WSP shall adhere to the budgetary levels set in the tariff.
ii. Surpluses: The surpluses projected to be realised shall ONLY be used on the rehabilitation/ replacement of dilapidated water networks, to curb physical losses of water.
iii. Reporting: The utility shall submit to WASREB a quarterly performance report in the format provided.
iv. Tariff Assessment: MAVWASCO will be required to carry out a self-assessment of the trend in Billing (KSh.) within the first three (3) months of approval and implementation of the tariff. The detailed report should be submitted to WASREB.
v. Investments: The utility shall undertake the investments in Table 1:
8th March, 2024 THE KENYA GAZETTE
Table 1: Investments
SUMMARY OF CAPITAL INVESTMENTS TO BE CARRIED OUT BY MAVOKO WATER AND SEWERAGE COMPANY LIMITED FOR
THE PERIOD 2023/24-2025/26
Description 2023/2024 2024/2025 2025/2026
New connections (meters and fittings) 4,000,000 4,000,000 4,000,000
Extensions of Networks Syokimau pipeline extensions - 2,250,000 4,027,500
Athi river town pipeline extensions - 8,302,495 5,234,510
Mlolongo pipeline extensions - 1,710,000 1,822,515
Kinanie pipeline extensions - 2,069,995 4,732,300
Sub-total network extensions - 14,332,490 15,816,824
Non-Revenue Water Reduction Plan Replacement of water meters 400,000 800,000 2,000,000
Network Rehabilitation Town pipeline augmentation - 4,500,000 3,240,002
Mlolongo pipeline upgrades - 765,150 1,964,535
Syokimau pipeline upgrades - 764,980 2,129,455
Kinanie pipeline upgrades - 2,400,005 1,369,435
Sub-total network extensions - 8,430,135 8,703,427
Sewer improvements - 5,000,000 10,000,000
Purchase of Movable Assets (Administration) 3 No. Motor vehicles - double cab pick up (4 x4) 3,000 cc diesel 7,000,000 7,000,000 7,000,000
7 No. Motor bikes 150cc offroad 900,000 600,000 600,000
Assorted office furniture - 393,560 216,748
ICT equipment 545,145 700,000 700,000
Sub-total movable assets 8,445,145 8,693,560 8,516,748
Plant and machinery 3,365,000 3,365,000
Total 12,845,145 44,621,184 52,401,999
Dated the 1st March, 2024.
J. ITUNGA, MR/6229676 Ag. Chief Executive Officer, Water Service Regulatory Board.
Dated the 1st March, 2024.
J. ITUNGA,
Ag. Chief Executive Officer, Water Service Regulatory Board.
Extracted Entities (1)
previous_gazette_ref
2703
Details
- Act / Legislation
- THE WATER ACT
- Reference
- No. 43 of 2016
- Section
- section 72 (1)
- Signed By
- J. ITUNGA
- Title
- Ag. Chief Executive Officer, Water Service Regulatory Board
- Date Signed
- 1st March 2024
- Page
- 54
- Extraction Method
- regex
Source Gazette
Vol. CXXVI No. 29
Published 3rd January 2024