GAZETTE NOTICE NO. 4455

PURSUANT to Clause 5 of Part III of the Schedule of Tariffs 2023, notice is given that all prices for electrical energy specified in Part II -(A) of the said Schedule will be liable to a Water Resource Management Authority (WRMA) levy of plus 1.51 cents per kWh for all meter readings taken in April, 2024. Hydropower Plant Units Purchased in March 2024 (kWh) Gitaru 68,477,140 Kamburu 36,220,110 Kiambere 75,082,530 Kindaruma 16,338,920 Masinga 16,745,600 Tana 7,866,220 Wanjii 3,878,280 Sagana 371,831 Turkwel 31,164,000 Gogo 765,970 Sondu Miriu 21,231,890 Sangoro 8,312,818 Regen-Terem 1,029,000 THE KENYA GAZETTE 12th April, 2024 Hydropower Plant Units Purchased in March 2024 (kWh) Chania 111,386 Gura 1,487,956 Metumi 1,401,410 Information used to calculate the WRMA levy: Approved WRMA levy for energy purchased from hydropower plants of capacity equal to or above 1MW =5.00 Kenya cents per KWh. Total units purchased from hydropower plants with capacity equal to or above 1MW = 290,485,061kWh. Total units generated and purchased (G) excluding exports in February, 2024 = 1,176,518,190kWh. DANIEL K. BARGORIA, MR/6208869 Director-General.

Extracted Entities (1)

previous_gazette_ref

4455

Details

Signed By
DANIEL K. BARGORIA
Title
Director-General
Date Signed
12th April 2024
Page
29
Extraction Method
regex