Back
ESTABLISHMENT
100% confidence
via regex
GAZETTE NOTICE NO. 5967
GAZETTE NOTICE NO. 5967
THE WATER ACT
(No. 43 of 2016)
ESTABLISHMENT
in accordance with the requirements of section 139 of the Water Act, 2016.
After considering the application, the written and oral submissions by all stakeholders during the consultation period, and based on the latest available data, WASREB has determined an upward tariff review for SIBOWASCO is justified to improve service delivery, operate sustainably and protect consumer interests by meeting the tariff conditions attached to the tariff.
WASREB gives a one (1) months’ notice to all existing and potential customers of SIBOWASCO that the approved tariffs for the four Financial
Years 2024/2025, 2025/2026, 2026/2027, and 2027/2028 shall be as follows:
1.0 Approved Tariff Structure
1.1 Water Tariff for the period 2024/2025 to 2027/2028
Consumer Categories Consumption Block Approved Tariff
(m3) (KSh./m3)
Domestic/Residential
1-6 155
7-20. 167
21-50 200
51-100 220
101-300 250
17th May, 2024 THE KENYA GAZETTE
Consumer Categories Consumption Block Approved Tariff
(m3) (KSh./m3)
>300 300
Multi-Dwelling Units Per M3 167
Commercial/Industrial
1-50 200
51-100 220
101-300 250
>300 300
Government/Institutions
1-50 200
51-100 220
100-300 250
>300 300
Public Schools, Universities and Colleges
1-600 167
601-1200 250
>1200m3 300
Unique Consumer Categories Water Kiosks (Per m3) 70
Bulk Water Supply (Per m3) 110
Customers with non-functional meters shall be billed based on the average of the last three months’ bills.
1.2 Sewerage Tariff Structure
(e) Consumers with a Water Connection
Sewerage will be charged at 75% of the water volumes, billed at the tariff for water specified (in 1.1) above for all customer categories.
(f) Consumers without a Water Connection
Sewerage consumers without a water connection shall be charged as follows:
§ Single dwelling Domestic unit: KSh. 350 Per Month
§ All other categories: 75% of the Volume of water consumed as per the metered source at the rates specified (in 1.1) above.
1.3 Indexation
The utility shall be eligible for annual indexation of the approved tariff, as per the regulations of the Water Services Regulatory Board
(WASREB). The inflation adjustment shall come into effect every July of the tariff period commencing July 2025.
1.4 Miscellaneous Charges
Item/ Service Charge (KSh.)
Water Deposit
Category of consumer
Domestic 2500
Retail shops less than 10m3 3000
Retail shops more than 10m3 3,500
Bar, and restaurants less than 15 m3 4000
Bar, restaurants more than 15 m3 6,000
Hotel class “A” and “B” less than 150 m3 12,000
Hotel class “A” and “B” more than 150 m3 15000
Hotel class “C” and ‘D’ less than 150 m3 18000
Hotel class “C” and ‘D’ more than 150 m3 20,000
Hospitals more than 150 m3 20,000
Health centres less than 150 m3 12,000
Schools and other institutions more than 200 m3 20,000
Schools less than 200 m3 10,000
Minor construction sites of more than 200 m3 15,000
Major construction sites more than 300 m3 50,000
Light industries less than 200 m3 30,000
Medium industrial between 200 m3 and 300 m3 50,000
Heavy industries of more than 300 m3 100,000
Water Kiosks 5,000
Customers with only sewer connection to be charged a deposit equivalent to water connection
Other Charges
Service
New water connection fee – Connection size: ½ inch to 1 inch 2,500
New water connection fee – Connection size: 1.5 inches to 3 inches 7,500
New water connection fee – Connection size above 3inches 15,000
Water Reconnection fee – at meter point 1,000
Water Reconnection fee – at mains 5,000 and double deposit
Tanker – 8000, 16,000 litres 2,500, 5,000 respectively per tanker within WSP area for all consumers
Sale of water Per M3 at bowsing point (own tanker) KSh .167
Replacement of stolen or damaged meters 100% of the market cost of the meter
Meter testing on request 500
Sewer Connection- Residential/ Domestic 5,000
Sewer Connection- Commercial, Government, Schools, Universities and
Colleges
7,500
THE KENYA GAZETTE 17th May, 2024
Item/ Service Charge (KSh.)
Sewer Connection- Industrial 15,000
Private sewer unblocking 2,500
Leak detection services 1,000
Sewer Reconnection fee 15,000
Statement of account fees 200
For cutting off the supply at the request of the consumer 200
For turning on the supply otherwise than in respect of a first connection 200
Exhauster Services (Company Exhauster) 5,000 for other customers and 4,000 for informal settlements
Private Exhausters (Dumping into the company’s sewer system) 15,000 per Truck per month
Penalties
Illegal water connection, -Commercial, Industry, Construction (Fraud) 100,000 plus estimated consumption during the period of illegality
Illegal water connection, (Fraud) – Domestic 30,000 plus estimated consumption during the period of the illegality
Overcharging (fraud) at water kiosk 15,000
Illegal sewer connection- Commercial, Industry, Construction 100,000
Illegal sewer connection- Domestic, Government, Schools, Universities and
Colleges
30,000
Self-reconnection after cut-off for non-payment 5,000 and billing to be backdated from the date of cut-off
Surcharge for tampering with meters (this to include meter removal, reversing of meter etc)
5,000
Surcharge for direct suction of water from the supply line using a pump 10,000
2.0 Cost Structure
2.1 Cost Summary
Below is the summary of the projected cost structure that makes up the total costs to be incurred by SIBOWASCO during the tariff period:
Expenditure Item 2022/23 2023/24 2024/25 2025/26 2026/27 2027/28
Operations 155,301,201 164,795,956 181,944,483 194,367,017 206,424,715 217,717,305
Maintenance 11,595,157 14,811,352 15,318,813 15,701,125 16,096,662 16,506,163
Regulatory Levy 5,302,557 10,080,624 14,668,576 16,275,653 17,633,315 19,580,554
Total O&M Costs 172,198,915 189,687,933 211,931,872 226,343,796 240,154,691 253,804,022
Investment Costs - 21,586,000 12,870,900 28,056,400 37,065,000 35,467,400
Debt Repayment 24,036,541 30,621,131 120,110,028 117,735,529 115,361,031 112,986,534
Total Costs 196,235,456 241,895,064 344,912,800 372,135,725 392,580,722 402,257,956
Total Billing (KSh.) 132,563,929 252,015,602 366,714,412 406,891,326 440,832,874 468,593,963
Collection Efficiency (%) 95% 95% 95% 95% 95% 95%
Projected Revenue 125,935,732 239,414,822 348,378,692 386,546,760 418,791,231 445,164,265
Total Cost Coverage 64% 99% 101% 104% 107% 111%
3.0 Conditions attached to the tariff approval
The conditions attached to this approval which shall form part of the license conditions of SIBOWASCO are:
(i) Service Delivery Conditions attached to the Tariff
Target 2022/2023 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Water Coverage (%) 38% 41% 44% 47% 50% 53%
Water quality standards (%) 90% 100% Compliance with Standards
Personnel Expenditure as % of O&M 36% 31% 29% 28% 28% 28%
Non-Revenue Water 57% 52% 47% 42% 37% 32%
Hours of Supply (Hrs.) 18 19 19 20 20 20
Staff per 1000 connections 6 9 7 6 5 5
Collection Efficiency (%) 95% 95% 95% 95% 95% 95%
Resale at Kiosk KSh. 5.00 per 20l Jerry Can
(ii) Annual budgets: The utility shall adhere to the budgetary levels set in the tariff.
(iii) Surpluses: The surpluses realised during the tariff period shall be used to implement priority service delivery capital projects approved by
WASREB.
(iv) Creation of distinct water and sewer cost centres: SIBOWASCO will ensure it creates separate water and sewer cost centres and maintains distinct record of operations of the two centres.
(v) Metering: SIBOWASCO shall progressively enhance the metering ratio to attain 100% as per condition (3i) above
(vi) Reporting: The utility shall submit to WASREB a quarterly performance report in the format provided.
(vii) Investments: The utility shall undertake the investments in Table 1:
Table 1: Investments
S/No. Investments Description Qty. Unit Cost
(KSh.)
2024/2025 2025/2026 2026/2027 2027/2028
1 Metering
1.1 Water Meter -
New Connections
AMR smart enabled meters (DN 15 meters)
500 5,500 2,750,000 - - -
17th May, 2024 THE KENYA GAZETTE
S/No. Investments Description Qty. Unit Cost
(KSh.)
2024/2025 2025/2026 2026/2027 2027/2028
AMR smart enabled meters (DN 20 meters)
350 7,500 2,625,000 - - -
AMR smart enabled meters (DN 15 meters)
3000 5,500 - 16,500,000 - -
AMR smart enabled meters (DN 20 meters)
500 7,500 - 3,750,000 - -
AMR smart enabled meters (DN 15 meters)
4500 5,500 - - 24,750,000 -
AMR smart enabled meters (DN 20 meters)
700 7,500 - - 5,250,000 -
AMR smart enabled meters (DN 15 meters)
4000 5,500 - - - 22,000,000
AMR smart enabled meters (DN 20 meters)
800 7,500 - - - 6,000,000
1.2 Water Meter - meter replacements
Replacement of meters that have surpassed their economic life (6yrs) -
200 DN 15 meters each year
1000 4,400 1,100,000 1,100,000 1,100,000 1,100,000
1.3 Bulk/Production meters
Production meter -2 DN 450 for
KSh.350,000 each and 2 DN 150 for
KSh.150,000 each for the 1st year. 3
DN 150 for Kshs.150,000 each and 3
DN 100 for KSh.100,000 each from the 3rd year. Installation of production meters at Yala treatment plant, Asembo treatment plant, Bondo treatment plant, South Sakwa treatment plant
750,000 750,000 750,000
2 Non-Revenue
Water
Management
2.1 Bulk/Production
Master Meters and
Works
DN100 Single Jet AMR Enabled
Meter
3 100,000 100,000 100,000 100,000
DN75 Single Jet AMR Enabled
Meter
3 80,000 80,000 80,000 80,000
Construction and installation of series bulk meters and production meter chambers (2 Chambers every year)
8 50,000 100,000 100,000 100,000 100,000
DN 450 Electromagnetic Water
Meter
1 350,000 350,000
DN150 Single Jet AMR Enabled
Meter
2 150,000 - - 150,000 150,000
2.2 DMA Master
Meters and Works
For installation of meters within
DMAs that will be created for determination of the actual NRW position and for establishment of
DMAs for effective NRW management to support revenue growth
DN 200 Electromagnetic Water
Meter
3 162,400 162,400 162,400 162,400
DN150 Single Jet AMR Enabled
Meter
4 150,000 150,000 150,000 150,000 150,000
DN100 Single Jet AMR Enabled
Meter
3 100,000 100,000 100,000 100,000
12 DMAs will be created for the five years with 3
DMAs being created each year
DMA creation and Isolation physical works
9 1,000,000 3,000,000 3,000,000 3,000,000 3,000,000
Accessories Pipe Wrenches 48" 5 85,000 255,000 170,000 - -
Pipe Wrenches 24" 5 38,000 114,000 76,000 - -
Pipe Wrenches 18" 5 6,500 19,500 13,000 - -
Pipe Wrenches 14" 10 3,500 10,500 10,500 10,500 3,500
Pipe Wrenches 12" 10 1,500 4,500 4,500 4,500 1,500
2.3 Cold Water Meter
Testing and
Calibration
Meter Calibration bench for meter sizes DN15mm to DN40mm
1,000,000 1,000,000
Portable Water Meter Test Kit 6 400,000 800,000 400,000 800,000
Water Meter Anti-Tampering Plastic
Seals
4000 500 500,000 500,000 500,000 500,000
2.4 Pressure data loggers, Pressure
Gauges & Pressure
Reducing Valves
Pressure data loggers with 2 output channels (max pressure 10 bars)
3 200,000 200,000 200,000 200,000 -
Pressure data loggers with 2 output channels (max pressure 20 bars)
3 300,000 300,000 300,000 300,000 -
THE KENYA GAZETTE 17th May, 2024
S/No. Investments Description Qty. Unit Cost
(KSh.)
2024/2025 2025/2026 2026/2027 2027/2028
Veron Moris analog calibrated
Pressure Gauges with up to 20 bars and has plotter paper.
2 50,000 50,000 50,000 - -
Install Water Pressure Gauges 120 5,000 150,000 150,000 150,000 150,000
Tank ball valves 4" 10 35,000 70,000 70,000 70,000 70,000
Tank ball valves 3" 1 30,000 30,000
TOTAL 12,870,900 28,056,400 37,065,000 35,467,400
Dated the 2nd May, 2024.
JULIUS ITUNGA, Ag. Chief Executive Officer, MR/5723150 Water Services Regulatory Board.
Dated the 2nd May, 2024.
JULIUS ITUNGA,
Ag. Chief Executive Officer, Water Services Regulatory Board.
Extracted Entities (1)
previous_gazette_ref
5967
Details
- Act / Legislation
- THE WATER ACT
- Reference
- No. 43 of 2016
- Section
- section 72 (1) (b)
- Signed By
- JULIUS ITUNGA
- Title
- Ag. Chief Executive Officer, Water Services Regulatory Board
- Date Signed
- 2nd May 2024
- Page
- 46
- Extraction Method
- regex
Source Gazette
Vol. CXXVI No. 66
Published 24th January 2024