Back
APPROVAL 100% confidence via regex

GAZETTE NOTICE NO. 5968

GAZETTE NOTICE NO. 5968

THE WATER ACT

(No. 43 of 2016)

APPROVAL


in accordance with the requirements of section 139 of the Water Act, 2016. After considering the application, the written and oral submissions by all stakeholders during the consultation period, and based on the latest available data, WASREB has determined an upward tariff review for TAWASCO is justified to improve service delivery, operate sustainably and protect consumer interests by meeting the tariff conditions attached to the tariff. WASREB gives a one (1) months’ notice to all existing and potential customers of TAWASCO that the approved tariffs for the three Financial Years 2024, 2025, and 2026 shall be as follows: 1.0 Approved Tariff Structure 1.1 Water Tariff for the period 2024 to 2026 Consumer Categories Consumption Block (m3) Approved Tariff (KSh./m3) Domestic/Residential 1-6 45 7-20 53 21-50 58 51-100 65 101-300 75 >300 85 Yard Taps (Less than 20 shared connections) Per m3 50 Government/ Institutions/Commercial/Industrial 1-50 58 51-100 65 101-300 75 >300 80 Public Schools/ Colleges/Universities 1-600 48 600-1200m3 55 >1200m3 60 Water Kiosks Per m3 70 1.2 Indexation The utility shall be eligible for annual indexation of the approved tariff, as per the regulations of the Water Services Regulatory Board (WASREB). The inflation adjustment shall come into effect every July of the tariff period commencing January 2025 1.3 Miscellaneous Charges Item/ Service Charge (KSh.) Water Deposit Category of consumer Domestic 2500 Retail shops less than 10m3 3000 Retail shops more than 10m3 3,500 Bar, restaurants less than 15 m3 4,000 Bar, restaurants more than 15 m3 6,000 Hotel less than 150 m3 12,000 Hotel more than 150 m3 15,000 17th May, 2024 THE KENYA GAZETTE Item/ Service Charge (KSh.) Hospitals more than 150 m3 20,000 Health centres less than 150 m3 12,000 Schools less than 200 m3 10,000 Schools and other institutions more than 200 m3 20,000 Minor construction sites more than 200 m3 15,000 Major construction sites more than 300 m3 50,000 Light industries less than 200 m3 30,000 Medium industrial between 200 m3 and 300 m3 50,000 Heavy industries more than 300 m3 100,000 Water Kiosks 5,000 Other Charges Service New water connection fee 2,500 Water Reconnection fee – at meter point 1,000 Water Reconnection fee – at mains 5,000 and double deposit Tanker – 8000, 16,000 litres 2,500, 5,000 respectively per tanker within WSP area for all consumers Sale of water Per M3 at bowsing point (own tanker) 70 Replacement of stolen or damaged meters 100% of the market cost of the meter Meter testing on request 500 Leak detection services 1,000 For cutting off the supply at the request of the consumer 200 For turning on the supply otherwise than in respect of a first connection 200 Exhauster Services (Company Exhauster) 5,000 for other customers and 4,000 for informal settlements Private Exhausters (Dumping into the company’s sewer system) 15,000 per Truck per month Penalties Illegal water connection, -Commercial, Industry, Construction (Fraud) 100,000 plus estimated consumption during the period of the illegality Illegal water connection, (Fraud) – Domestic 30,000 plus estimated consumption during the period of the illegality Overcharging (fraud) at water kiosk 15,000 Self-reconnection after cut off for non-payment 5,000 and billing to be backdated from date of cut off Surcharge for tampering with meters (this to include meter removal, reversing of meter etc) 5,000 Surcharge for direct suction of water from the supply line using a pump 10,000 2.0 Cost Structure 2.1 Cost Summary Below is the summary of the projected cost structure that makes up the total costs to be incurred by TAWASCO during the tariff period: Expenditure Item 2022 2023 2024 2025 2026 Operations 3,281,305 4,276,704 5,332,134 5,599,127 5,844,588 Maintenance 307,000 956,400 1,071,168 1,199,708 1,343,673 Regulatory Levy 75,000 206,215 591,246 623,600 654,780 Operation and Maintenance (O&M) Costs 3,663,305 5,439,319 6,994,548 7,422,435 7,843,041 Investments - - 5,699,000 6,080,000 6,650,000 Debt Repayment - - 505,416 337,073 - Total Costs 3,663,305 5,439,319 13,198,964 13,839,508 14,493,041 Total Billing (KShs) 4,082,185 5,155,375 14,781,150 15,589,992 16,369,491 Collection Efficiency (%) 89% 89% 90% 91% 92% Projected Revenue 3,619,196 4,588,283 13,303,035 14,186,892 15,059,932 Total Cost Coverage (%) 99% 84% 101% 103% 104% 3.0 Conditions attached the tariff approval The conditions attached to this approval which shall form part of the license conditions of TAWASCO are: (i) Service Delivery Conditions attached to the Tariff Target 2022 2023 2024 2025 2026 Water Coverage (%) 95% 95% 96% 97% 98% Water quality standards (%) 93% 100% Compliance with Standards Personnel Expenditure as % of O&M 48% 39% 39% 39% 39% Non-Revenue Water 25% 25% 25% 24% 23% Hours of Supply (Hrs.) 24 24 24 24 24 Staff per 1000 connections 9 9 8 8 8 Metering ratio (%) 91% 91% 100% 100% 100% Resale at Kiosk KSh. 5.00 per 20l Jerry Can THE KENYA GAZETTE 17th May, 2024 (ii) Annual budgets: The utility shall adhere to the budgetary levels set in the tariff. (iii) Surpluses: The surpluses projected to be realised shall be set aside to implement priority service delivery capital projects. TAWASCO shall be required at the end of every financial year to identify the priority project to be implemented and obtain approval from WASREB. (iv) Catchment Protection: The utility shall undertake measures to conserve/ protect the catchment areas of their source of water as part of Corporate Social Responsibility. (v) Reporting: The utility shall submit to WASREB a quarterly performance report in the format provided. (vi) Investments: The utility shall undertake the investments in Table 1: Table 1: Investments INVESTMENTS SCHEDULE - INTERNALLY GENERATED FUNDS Proposed Implementation Year Targetted Investment Project Area Guide Size Descriptions Unit Unit Cost Qty 2024 2025 2026 A.NRW Reduction Plan Reduce NRW from 25% to 23% Replace Faulty Customer Metres 1/2 inch KENT/ ITRON PCS 3,500 300 - - 1,050,00 Meters for Unmetered Connections 1/2 inch KENT PCS 3,500 500 1,400,00 - 350,000 Purchase and Installation of Master 4 inch KENT PCS 120,000 8 480,000 480,000 Upgrading Billing System - 500,000 - Labour 700,000 100,000 250,000 Sub -Total 2,580,00 1,080,000 1,650,00 B. Rehabilitat ion of Service Lines Rehabilita tion of Service Lines (10.4 KM Maraba - Kamalam bu) Purchase and Replace Worn Out Pipes 1/2 inch HDPE PN16 Rolls 6,000 153 918,000 Purchase and Replace Worn Out Pipes 1 inch HDPE PN16 Rolls 9,000 14 126,000 Purchase and Replace Worn Out Pipes 1inch HDPE PN17 Rolls 9,000 10 90,000 Purchase and Replace Worn Out Pipes 1 1/2 inch HDPE PN12 Rolls 12,000 20 240,000 Fittings and Accessories 137,400 Labour 414,600 Sub -Total 1,926,00 - - C. Last Mile Connections Last-Mile Connectio ns in Kabolebo Sublocati on and Kamalam bu in Got ne Lel Sublocati on Purchase of Pipes for Last mile connections connections Connections 1/2incH HDPE PN ROL LS 6,000 26 156,000 Purchase of Pipes for Last mile connections connections Connections 1 inch HDPE PN ROL LS 9,000 4 36,000 Fittings and Accessories 38,400 Labour 57,600 Sub -Total 288,000 - - D. Equipping Lab Purchase of Lab Equipmen t and Reagents Purchase of Lab Equipment and Reagents 905,000 905,000 E. Capital Works Filtration units at Kamelil and Inapngetu ny Design capacity 25-35 m3/hr 5,000,00 2 5,000,000 5,000,00 17th May, 2024 THE KENYA GAZETTE INVESTMENTS SCHEDULE - INTERNALLY GENERATED FUNDS Proposed Implementation Year Targetted Investment Project Area Guide Size Descriptions Unit Unit Cost Qty 2024 2025 2026 Sub -Total 905,000 5,000,000 5,000,00 TOTAL 5,699,00 6,080,000 6,650,00 18,390,600 Dated the 2nd May, 2024. JULIUS ITUNGA, MR/5723150 Ag. Chief Executive Officer, Water Services Regulatory Board.

Dated the 2nd May, 2024.

JULIUS ITUNGA,

Ag. Chief Executive Officer, Water Services Regulatory Board.

Extracted Entities (1)

previous_gazette_ref

5968

Details

Act / Legislation
THE WATER ACT
Reference
No. 43 of 2016
Section
section 72 (1) (b)
Signed By
JULIUS ITUNGA
Title
Ag. Chief Executive Officer, Water Services Regulatory Board
Date Signed
2nd May 2024
Page
50
Extraction Method
regex