Back
RESTORATION 100% confidence via regex

GAZETTE NOTICE NO. 10530

GAZETTE NOTICE NO. 10530

THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT

(No. 8 of 1999)

RESTORATION


PURSUANT to section 59 of the Environmental Management and Co-ordination Act, 1999, the National Environment Management Authority (NEMA) has received an Environmental Impact Assessment Study Report for the above proposed project. The proponent, Girini Company Limited, proposes to construct 3No. blocks (A&B) residential apartments comprising two-level basements (basement 01 with 99No.parking bays and basement 02 with 99No. parking bays), ground floor (99No. parking bays), mezzanine floor(94No. parking bays), 1No. 8 bedroom and DSQ duplex unit, 2No. 6 bedroom and DSQ duplex units, 1-20th floors and roof level floor with a total of 517No.units (21No. one bedroom with study room units, 164No. two bedroom units, 84No. two bedroom units with DSQ, 17No. three bedroom units with DSQ, 19No. four bedroom units with DSQ, 2No. four bedroom units), playground, parking spaces, swimming pool, gym, other associated facilities and amenities on Plot L.R. No. Nairobi/Block 19/696 (L.R. No. 1/1380), along Turbo Road, Kilimani, Nairobi City County. The following are the anticipated impacts and proposed mitigation measures: 23rd August, 2024 THE KENYA GAZETTE Impacts Mitigation Measures Soil erosion • Control earthworks. • Install drainage structures properly. • Ensure management of excavation activities. Vegetation disturbance • Restore/re-establish vegetation in some parts of the disturbed areas through implementation landscaping programme. Noise pollution • Sensitize workforce including drivers of construction vehicles. • Install sound barriers for pile driving activity. • Install portable barriers to shield compressors and other small stationary equipment where necessary. • Display signs to indicate construction activities. • Maintain all equipment. • Workers in the vicinity of high-level noise to wear safety and protective gear. Dust generation • Spray stock piles of earth with water. • Avoid pouring dust materials from elevated areas to ground. • Cover all trucks hauling soil, sand and other loose materials. • Provide dust screen where necessary. Exhaust emissions • Vehicle idling time shall be minimized. • Equipment shall be properly serviced. Increased water use • Installation of motion-sensing taps, urinals, and toilets to automatically switch off once the user leaves the station. • A motion sensor tap would cut up to 85% of annual water usage compared to conventional taps. • Rainwater harvesting. • The harvested water would be used for cleaning, flushing toilets, watering plants, etc. Waste management • Special attention shall be paid to the sanitary facilities on site. • Garbage shall be disposed periodically. • Contract a NEMA licensed waste handler. Public health and occupational safety • Ensure proper solid waste disposal and collection facilities. • Ensure dustbin cubicles are protected from animals, rains and are well covered. • Provide suitable safety gear for all personnel. • Proper treatment of waste water. Climate change risks and vulnerability • The project should invest in water management strategies like rainwater harvesting, storage facilities, and efficient water use practices. These measures aim to mitigate water scarcity during dry periods and reduce flood risks during heavy rainfall events. • Incorporate resilient features to withstand extreme weather like flooding, storms, and high temperatures. • Implement technologies and practices to reduce greenhouse gas emissions and dependency on fossil fuels. Impacts Mitigation Measures • Protect and enhance natural ecosystems to preserve biodiversity and ecosystem services, including reforestation, habitat restoration, and sustainable land management practices. Traffic disruption • Properly plan for transportation of materials to ensure that vehicles are optimally filled to reduce the number of trips done or the number of vehicles on the access roads; Employment of formal flagmen/women to ensure the public safety. • Place clear signage’s at the gate to alert drivers to be cautious about the construction and to look out for entering and/or exiting vehicles. Fire risks • Install fire alarm with smoke sensors; Have standby fire extinguishers at the site in case fire erupts; Declare places with flammable construction materials as “NO SMOKING ZONES” and display conspicuous notices of the same. Encroachment of the area • Demarcate the project area affected by construction activities to prevent unnecessary interference with areas not meant for proposed project. • Avoid encroachment into road reserves in totality. The full report of the proposed project is available for inspection during working hours at: (a) Principal Secretary, Ministry of Environment, Climate Change and Foresty, NHIF Building, 12th Floor, Ragati Road, Upper Hill, Upper Hill, P.O. Box 30126–00200, Nairobi. (b) Director General, NEMA, Popo Road, off Mombasa Road, P.O. Box 67839–00200, Nairobi. (c) County Director of Environment, Nairobi City County. A copy of the EIA report can be downloaded at www.nema.go.ke The National Environmental Management Authority, invites members of the public to submit oral or written comments within thirty (30) days from the date of publication of this notice to the Director General, NEMA to assist the Authority in the decision making process for this project. Comments can also be e-mailed to dgnema@nema.go.ke MAMO B. MAMO, Director-General, MR/6161595 National Environment Management Authority.

Dated the 23rd August, 2024.

MAMO B. MAMO,

Director-General, National Environment Management Authority.

Extracted Entities (1)

previous_gazette_ref

10530

Details

Act / Legislation
THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
Reference
No. 8 of 1999
Section
section 59
Signed By
MAMO B. MAMO
Title
Director-General, National Environment Management Authority
Date Signed
23rd August 2024
Page
42
Extraction Method
regex