Back
EXTENSION
100% confidence
via regex
GAZETTE NOTICE NO. 12822
GAZETTE NOTICE NO. 12822
THE WATER ACT
(No. 43 of 2016)
EXTENSION
in accordance with the requirements of section 139 of the Water Act, 2016.
After considering the application, the written and oral submissions by all stakeholders during the consultation period, and based on the latest available data, WASREB has determined an upward tariff review for RWL is justified to improve service delivery, operate sustainably and protect consumer interests by meeting the tariff conditions attached to the tariff.
WASREB gives a one (1) months’ notice to all existing and potential customers of RWL that the approved tariffs for the four financial years
2024,2025, 2026 and 2027, shall be as follows:
2 Approved Tariff Structure for the period 2024 to 2027
1.1 Water Tariff
Consumer Categories Consumption Block Approved Tariff
(M3) (KSh./M3)
Domestic/Residential 1-6 160
7-20 180
21-50 185
51-100 190
101-300 195
>300 210
4th October, 2024 THE KENYA GAZETTE
Consumer Categories Consumption Block Approved Tariff
(M3) (KSh./M3)
Other Consumers 1-50 170
51-100 185
101-300 195
>300 210
Customers with non-functional meters shall be billed based on the average of the last three months’ bills.
1.2 Indexation
The utility’s approved tariffs for water and sewerage shall be eligible for annual indexation, as per the regulations of the Water Services Regulatory
Board (WASREB). The inflation adjustment shall come into effect every July of the tariff period commencing July 2025.
1.3 Miscellaneous Charges
Service Charge (KSh.)
Water Connection fee
Water Connection fee 30,000
Water deposit (Refundable) 6,000
Re-connection fees
Normal 1,000
At Mains 5,000 and double deposit
Other Charges
Leak detection services 1,000
Statement of account fees 200
For cutting off the supply at the request of the consumer 200
For turning on the supply otherwise than in respect of a first connection 200
Penalties
Illegal water connection, Commercial/Industrial/Construction (Fraud) 100,000 plus estimated consumption during the period of illegality
Illegal water connection, (Fraud) – Domestic 30,000 plus estimated consumption during the period of the illegality
Self-reconnection after cut-off for non-payment 5,000 and billing to be backdated from the date of cut-off
Surcharge for tampering with meters (this to include meter removal, reversing of meter etc)
5,000
Surcharge for direct suction of water from the supply line using a pump 10,000
Other Charges
Leak detection services 1,000
Statement of account fees 200
For cutting off the supply at the request of the consumer 200
For turning on the supply otherwise than in respect of a first connection 200
2.0 Cost Summary
Below is the summary of the recommended cost structure that makes up the total costs to be incurred by RWL during the tariff period:
Expenditure Item 2024 (KSh.) 2025 (KSh.) 2026 (KSh.) 2027 (KSh.)
Operations 71,441,470 69,956,978 74,230,283 77,081,763
Maintenance 8,354,690 8,111,068 8,658,576 9,277,335
Regulatory Levy 3,600,000 5,066,538 5,090,866 5,117,064
Total O&M Costs 83,396,160 83,134,584 87,979,725 91,476,162
Investment Costs 20,945,000 23,049,047 22,532,005 24,472,005
Debt Repayment 12,110,170 12,147,605 12,147,605 12,147,605
Total Costs 116,451,330 118,331,235 122,659,335 128,095,771
Total Billing (KShs) 126,663,439 127,271,656 127,926,588 128,578,661
Collection Efficiency (%) 95% 95% 95% 95%
Projected Revenue 120,330,267 120,908,074 121,530,258 122,149,728
Total Cost Coverage 103% 102% 99% 95%
3.0 Conditions attached to the tariff approval
The conditions attached to this approval which shall form part of the license conditions of RWL are:
(i) Service Delivery Conditions attached to the Tariff
Service Delivery Conditions
Target 2023 2024 2025 2026 2027
Water Coverage (%) 100% 100% 100% 100% 100%
Water quality standards (%) 100% Compliance with Standards
Personnel Expenditure as % of O&M 25% 21% 22% 22% 22%
Maintenance Expenditure as % of O&M 2% 10% 10% 10% 10%
Investment Expenditure as a % of Total Expenditure 3% 18% 19% 18% 19%
Non-Revenue Water 11% 11% 11% 11% 11%
Hours of Supply (Hrs.) 24 24 24 24 24
Staff per 1000 connections 18 18 18 18 18
Metering ratio (%) 100% 100% 100% 100% 100%
Collection Efficiency (%) 100% 95% 96% 97% 98%
(i) Annual budgets: The WSP shall adhere to the budgetary levels set in the tariff.
THE KENYA GAZETTE 4th October, 2024
(ii) Surpluses: The surpluses realised during the tariff period shall be used to implement priority service delivery capital projects approved by
WASREB.
(iii) Reporting: The utility shall submit quarterly performance reports to WASREB in the prescribed format.
(iv) Investments: The utility shall undertake the investments in Table 1 within the tariff period:
Investment Project Area Guide Size Sample
Descriptions
Unit Unit
Cost
Quantity Total amount in
KSh.
(KSh.)
(KSh.)
(KSh.)
(KSh.)
A. Increase water coverage
New
Connections
Purchase of
New Meters
DN 15 Mechanical Cold
Water Sensus and Kent meters
No. 360 6,000 360 2,160,000 540,000 540,000 540,000 540,000
B. To reduce
NRW
Service
Lines: Runda
Grove, Runda Drive, Runda
Close, Pan
Africa
Insurance
Avenue
Renewal of
Service
Lines
Lot Assorted Sizes Length
(M)
-
- 25,118,958 4,058,958 5,100,000 8,110,000 7,850,000
Old Runda New Zonal
Meters
DN
Mechanical Cold
Water Sensus and Kent meters
No.12
50,000
600,000 150,000 150,000 150,000 150,000
Runda
Meadows
New Zonal
Meters
DN
Mechanical Cold
Water Sensus and Kent meters
No.1
50,000
50,000 50,000 - - -
Eagle Park New Zonal
Meters
DN
Mechanical Cold
Water Sensus and Kent meters
No.1
50,000
50,000 50,000 - - -
Runda
Mimosa
Replacement of Zonal
Meters
DN
Mechanical Cold
Water Sensus and Kent meters
No. 2 50,000 2 100,000 100,000 - - -
C.
Replacemen t of Pumps, Motors &
Filter
Vessels
Vertical
Booster
Pump
Pressure pump at
Treatment works
150m3
/hr
Supply, installation and commissioning of (Grundfos vertical multi stage) pump set with a rated capacity of 150 m3/h against a total head of
140m, No. 1 - 1 2,024,084 1,012,042 1,012,042 - -
Filter Vessels Intake
Works
50m3/ hr
FC 708 domed filter c/w control valve
No. 2 - 2 5,436,014 1,812,005 1,812,005 1,812,005
Borehole
Pump
Treatment
Works
100kw
Grundf os pump of
50m3/ hr
Supply, installation and commissioning of (Grundfos vertical multistage) pump set with a rated capacity of 150 m3/h against a total head of
140m, No. 1 - 1 1,500,000 1,500,000 - - servicing of
46Kw motor and
Treatment
Works
- servicing of
46Kw motor and
No.1 Sum 1 450,000 450,000 - - - servicing of
75kw ABB motor
Treatments
- servicing of
75kw ABB motor
No.1 Sum 1 200,000 200,000 -
Replacement of Sluice
Valves
Treatment
Works
-
Replacement of
Sluice Valves
No.2 Sum 2 200,000 100,000 100,000 -
Replacement of NR Valve
Treatment
Works
-
Replacement of
NR Valve
No.1 Sum 1 115,000 115,000 -
92 Runda
Grove
Repair of washouts from raw water tanks and re- construction of wastewater drainage lines
-
-
400m3 Sum 1 1,564,000 1,564,000 - - -
4th October, 2024 THE KENYA GAZETTE
Repair of
Wash-out lines
Treatment
Works
-
Repair of Wash- out lines
Sum 1 200,000 - - -
Installation of a new
530m3 elevated tank
Treatment
Works
-
Installation of a new 530m3 elevated tank
No.1 Sum 1 28,000,000 7,000,000 7,000,000 7,000,000 7,000,000
Consultancy work to re- evaluate the effectiveness of the water recycling plant
Waste water
-
Consultancy work to re- evaluate the effectiveness of the water recycling plant
No.1 Sum 1 100,000 - 100,000 - -
D. Water
Tanks
92 Runda
Grove
Sedimentatio n Tanks
(Dia.
6.5 X
6.0
Meters
Deep)
Circular concrete tank
400m3 Sum 1 800,000 - 800,000 - -
Repair of
600m3 concrete tank
Treatment
Works
- - 600m3 Sum 1 300,000 300,000 - - -
Maintenance of 270m3 steel tank
Treatment
Works
- - 270m3 Sum 1 750,000 750,000 - - -
E.Bulk
Supply Line
Extension of
AWWDA
Bulk Supply
Line
- - Extension of
AWWDA Bulk
Supply Line
Km. Sum 1 18,480,000 4,620,000 4,620,000 4,620,000 4,620,000
G. Purchase of movable assets
Motorcycles Motorcycles 125 cc Stroke 54, Engine
Displacement
123, Max Power
10.7 bhp@7500 rpm
No.1 Sum 1 300,000 - - 300,000 -
Leakage detector/pipe locator
Equipment’s and
Accessories
- - No. Sum 1 2,500,000 - - - 2,500,000
TOTAL 90,998,056 20,945,000 23,049,047 22,532,005 24,472,005
Dated the 6th September, 2024.
RICHARD K. CHERUIYOT, MR/6547681 Ag. Chief Executive Officer, Water Service Regulatory Board.
Dated the 6th September, 2024.
RICHARD K. CHERUIYOT,
Ag. Chief Executive Officer, Water Service Regulatory Board.
Extracted Entities (1)
previous_gazette_ref
12822
Details
- Act / Legislation
- THE WATER ACT
- Reference
- No. 43 of 2016
- Section
- section 72 (1) (b)
- Signed By
- RICHARD K. CHERUIYOT
- Title
- Ag. Chief Executive Officer, Water Service Regulatory Board
- Date Signed
- 6th September 2024
- Page
- 38
- Extraction Method
- regex
Source Gazette
Vol. CXXVI No. 151
Published 9th July 2024