Back
ESTABLISHMENT
100% confidence
via regex
GAZETTE NOTICE NO. 12826
GAZETTE NOTICE NO. 12826
THE WATER ACT
(No. 43 of 2016)
ESTABLISHMENT
in accordance with the requirements of section 139 of the Water Act, 2016.
After considering the application, the written and oral submissions by all stakeholders during the consultation period, and based on the latest available data, WASREB has determined an upward tariff review for BOMWASCO is justified to improve service delivery, operate sustainably and protect consumer interests by meeting the tariff conditions attached to the tariff.
WASREB gives a one (1) months’ notice to all existing and potential customers of BOMWASCO that the approved tariffs for the three financial years 2024/2025, 2025/2026, and 2026/2027 shall be as follows:
6 Approved Tariff Structure for the period
1.1 Water Tariff Structure for the period 2024/2025 to 2026/2027
Consumer Categories Consumption Block Approved Tariff
(m3) (KSh./M3)
Domestic/Residential 1-7 130
7-20. 150
21-50 170
51-100 200
101-300 220
>300 280
Multi-Dwelling Units Per M3 170
Commercial/Industrial/ Government & Institutions 1-50 170
51-100 200
101-300 220
>300 280
Public Schools, Colleges and Universities 1-600 170
601-1200 220
>1200m3 280
Unique Consumer Categories (Per M3) Water Kiosks 150
Bowsing Point 150
Bulk Water Supply 150
Customers with non-functional meters shall be billed based on the average of the last three months’ bill.
1.2 Sewerage Tariff
1.2.1 Consumers with a Water Connection
(a) Sewerage will be charged at 75% of the water volumes, billed at the tariff for water specified (in 1.1) above for all customer categories
(b) Disconnected water accounts shall be charged based on the average of the last three months’ sewerage charges before the disconnection.
1.2.2 Customer with no water connection
Sewerage consumers without a water connection shall be charged as follows:
• Domestic customers without a metered source of water (Per Single dwelling unit): KSh. 300 Per Month
• All other categories: 75% of the volume of water consumed as per the metered source of water including boreholes, at the rates specified in
(1.1) above.
1.3 Indexation
The utility’s approved tariffs for water and sewerage shall be eligible for annual indexation, as per the regulations of the Water Services
Regulatory Board (WASREB). The inflation adjustment shall come into effect every July of the tariff period commencing July 2025.
1.4 Miscellaneous Charges
Item/ Service Charge (KSh.)
Water Deposit
Category of consumer
Domestic 2,500
Retail shops less than 10m3 3,000
Retail shops more than 10m3 3,500
Bar and restaurants less than 15 m3 4,000
Bar restaurants more than 15 m3 6,000
Hotel class “A” and “B” less than 150 m3 12,000
Hotel class “A” and “B” more than 150 m3 15,000
Hotel class “C” and ‘D’ less than 150 m3 18,000
Hotel class “C” and ‘D’ more than 150 m3 20,000
Hospitals more than 150 m3 20,000
Health centres less than 150 m3 12,000
Schools and other institutions more than 200 m3 20,000
4th October, 2024 THE KENYA GAZETTE
Item/ Service Charge (KSh.)
Schools and other institutions less than 200 m3 10,000
Minor construction sites of more than 200 m3 15,000
Major construction sites more than 300 m3 50,000
Light industries less than 200 m3 30,000
Medium industries between 200 m3 and 300 m3 50,000
Heavy industries of more than 300 m3 100,000
Water Kiosks 5,000
Customers with only sewer connection are to be charged a deposit equivalent to a water connection
Other Charges
Service
New water connection fee – Connection size: ½ inch to 1 inch 4,000
New water connection fee – Connection size: 1.5 inches to 3 inches 7,500
New water connection fee – Connection size above 3inches 15,000
Water Reconnection fee – at meter point 1,000
Water Reconnection fee – at mains 5,000 and double deposit
Tanker – 8000 and 16,000 litres 2,500 and 5,000 respectively per tanker within the WSP area for all consumers
Sale of water Per M3 at bowsing point (own tanker) As per rates specified (in 1.1) above
Replacement of stolen or damaged meters 100% of the market cost of the meter
Meter testing on request 500
Special meter reading under customer’s request 500
Sewer Connection- Residential/ Domestic 5,000
Sewer Connection- Commercial, Government, Schools, Universities and
Colleges
7,500
Sewer Connection- Industrial 15,000
Private sewer unblocking 2,500
Leak detection services 1,000
Sewer Reconnection fee 15,000
Printing of customer’s statement under own request 200
For cutting off the supply at the request of the consumer 200
For turning on the supply otherwise than in respect of a first connection 200
Exhauster Services (Company Exhauster) 4,000 for informal settlements, All Other Customers are to be charged based on distance as below;
Distances Exhauster Graduated Rates
Within Central Business
District (CBD) 6000
15-30 Kms Radius 10,000
31-60 Kms Radius 14,000
61-80 Kms Radius 20,000
81-90 Kms Radius 30,000
Over 90 Kms Radius 35,000
Private Exhausters (Dumping into the company’s sewer system) 15,000 per Truck per month
Penalties
Illegal water connection, -Commercial, Industry, Construction (Fraud) 100,000 plus estimated consumption during the period of illegality
Illegal water connection, – Domestic(Fraud) 30,000 plus estimated consumption during the period of the illegality
Overcharging (fraud) at water kiosk 15,000
Illegal sewer connection- Commercial, Industry, Construction 100,000
Illegal sewer connection- Domestic, Government, Schools, Universities &
Colleges
30,000
Self-reconnection after cut-off for non-payment 5,000 and billing to be backdated from the date of cut-off
Surcharge for tampering with meters (this to include meter removal, reversing of meter etc)
15,000
Surcharge for direct suction of water from the supply line using a pump 10,000
2.0 Cost Summary
Below is the summary of the recommended cost structure that makes up the total costs to be incurred by BOMWASCO during the tariff period:
Expenditure Item 2022/2023 (KSh.) 2023/2024 (KSh.) 2024/2025 (KSh.) 2025/2026 (KSh.) 2026/2027 (KSh.)
Operations 195,416,660 202,221,745 214,676,837 222,024,404 229,681,935
Maintenance 13,821,216 7,763,440 7,918,709 8,077,083 8,238,625
Regulatory Levy 3,833,290 4,024,955 9,218,000 9,463,768 9,748,918
Total O&M Costs 213,071,166 214,010,140 231,813,546 239,565,255 247,669,478
Investment Costs - - 21,645,900 17,706,400 16,965,000
Debt Repayment 6,000,000 6,000,000 6,000,000 6,000,000 -
Total Costs 219,071,166 220,010,140 259,459,446 263,271,655 264,634,478
Total Billing (KShs) 95,832,251 100,623,864 230,450,008 236,594,211 243,722,953
Collection Efficiency (%) 78% 89% 89% 90% 91%
Projected Revenue 74,959,812 89,951,775 205,100,507 212,934,790 221,787,888
THE KENYA GAZETTE 4th October, 2024
Cost Coverage Without Subsidy 34% 41% 79% 81% 84%
Proposed Subsidy - - 63,000,000 63,000,000 63,000,000
Projected Revenue With Subsidy 74,959,812 89,951,775 268,100,507 275,934,790 284,787,888
Cost Coverage With Subsidy 34% 41% 103% 105% 108%
3.0 Conditions attached to the tariff approval
The conditions attached to this approval which shall form part of the license conditions of BOMWASCO are:
(i) Service Delivery Conditions attached to the Tariff
Target 2022/2023 2023/2024 2024/2025 2025/2026 2026/2027
Water Coverage (%) 10% 13% 16% 19% 22%
Water quality standards (%) 100% 100% Compliance with Standards
Personnel Expenditure as % of O&M 39% 39% 37% 37% 36%
Non-Revenue Water 63% 63% 61% 60% 59%
Hours of Supply (Hrs.) 15 16 16 17 17
Staff per 1000 connections 23 22 21 21 20
Metering ratio (%) 53% 100% 100% 100% 100%
Collection Efficiency (%) 78% 89% 89% 90% 91%
Resale at Kiosk KSh. 5.00 per 20l Jerry Can
(ii) Annual budgets: The WSP shall adhere to the budgetary levels set in the tariff.
(iii) Subsidy: The County Government of Bomet shall support the WSP with subsidy as follows:
Period Production cost - Electricity (KSh.)
Year 1: 2024/2025 63,000,000
Year 2: 2025/2026 63,000,000
Year 3: 2026/2027 63,000,000
Total 189,000,000
(i) Surpluses: The surpluses realised during the tariff period shall be used to implement priority service delivery capital projects approved by
WASREB.
(ii) Reporting: The utility shall submit quarterly performance reports to WASREB in the prescribed format.
(iii) Catchment Protection: The utility shall undertake measures to conserve/ protect the catchment areas of their water source as part of
Corporate Social Responsibility
(iv) Investments (Metering and NRW Management): The utility shall undertake the investments in Table 1:
Table 1: Investments
S/N Investments Description Qty. Unit Cost (KSh.) 2024/2025 2025/2026 2026/2027
1 Metering
1.1 Water Meter - New
Connections
AMR smart enabled meters (DN
15 meters)
2,000 5,500 5,500,000 2,750,000 2,750,000
AMR smart enabled meters (DN
20 meters)
400 7,500 1,500,000 750,000 750,000
1.2 Water Meter - meter replacements
Replacement of meters that have surpassed their economic life
(6yrs) - 200 DN 15 meters each year
4500 5,500 8,250,000 8,250,000 8,250,000
2 Non-Revenue Water
Management
2.1 Bulk/ Production Master
Meters and Works
DN100 Single Jet AMR Enabled
Meter
3 100,000 100,000 100,000
DN75 Single Jet AMR Enabled
Meter
3 80,000 80,000 80,000
Construction and installation of series bulk meters and production meter chambers (2
Chambers every year)
8 50,000 100,000 100,000 100,000
DN 450 Electromagnetic Water
Meter
1 350,000 - - -
DN150 Single Jet AMR Enabled
Meter
2 150,000 - - 150,000
2.2 DMA Master Meters and
Works
For installation of meters within DMAs that will be created for determination of the actual NRW position and establishment of
DMAs for effective NRW
DN 200 Electromagnetic Water
Meter
3 162,400 162,400 162,400
DN150 Single Jet AMR Enabled
Meter
4 150,000 150,000 150,000 150,000
DN100 Single Jet AMR Enabled
Meter
3 100,000 100,000 100,000 100,000
4th October, 2024 THE KENYA GAZETTE management to support revenue growth
12 DMAs will be created for the five years with 3
DMAs being created each year
DMA creation and Isolation physical works
9 1,000,000 3,000,000 3,000,000 3,000,000
Accessories Pipe Wrenches 48" 5 85,000 255,000 170,000 -
Pipe Wrenches 24" 5 38,000 114,000 76,000 -
Pipe Wrenches 18" 5 6,500 19,500 13,000 -
Pipe Wrenches 14" 10 3,500 10,500 10,500 10,500
Pipe Wrenches 12" 10 1,500 4,500 4,500 4,500
2.3 Cold Water Meter Testing and Calibration
Meter Calibration bench for meter sizes DN15mm to
DN40mm
1,000,000 1,000,000 - -
Portable Water Meter Test Kit 6 400,000 800,000 400,000
Water Meter Anti-Tampering
Plastic Seals
4000 500 500,000 500,000 500,000
2.4 Active Leakage
Management Equipment for DMA operationalization
Portable Ultrasonic Flow meter
(UFM): DN 15mm to DN
250mm
1 1,750,000 - - -
Advanced Leak Noise
Correlator
1 2,500,000 - - -
Pipe locators (PVC) - 1 600,000 - - -
Pipe locators (ferrous) 1 16,000 - - -
2.5 Pressure data loggers, Pressure Gauges &
Pressure Reducing Valves
Pressure data loggers with 2 output channels (max pressure
10 bars)
3 200,000 200,000 200,000 200,000
Pressure data loggers with 2 output channels (max pressure
20 bars)
3 300,000 300,000 300,000 300,000
Veron Moris analog calibrated
Pressure Gauges with up to 20 bars and has plotter paper.
2 50,000 50,000 50,000 -
Install Water Pressure Gauges 120 5,000 150,000 150,000 150,000
Tank ball valves 4" 10 35,000 70,000 70,000 70,000
Tank ball valves 3" 1 30,000 30,000 - -
Total 21,645,900 17,706,400 16,965,000
Dated the 6th September, 2024.
RICHARD K. CHERUIYOT, MR/6547681 Ag. Chief Executive Officer, Water Service Regulatory Board.
Dated the 6th September, 2024.
RICHARD K. CHERUIYOT,
Ag. Chief Executive Officer, Water Service Regulatory Board.
Extracted Entities (1)
previous_gazette_ref
12826
Details
- Act / Legislation
- THE WATER ACT
- Reference
- No. 43 of 2016
- Section
- section 72 (1) (b)
- Signed By
- RICHARD K. CHERUIYOT
- Title
- Ag. Chief Executive Officer, Water Service Regulatory Board
- Date Signed
- 6th September 2024
- Page
- 56
- Extraction Method
- regex
Source Gazette
Vol. CXXVI No. 151
Published 9th July 2024