Back
APPROVAL
100% confidence
via regex
GAZETTE NOTICE NO. 12832
GAZETTE NOTICE NO. 12832
THE WATER ACT
(No. 43 of 2016)
APPROVAL
in accordance with the requirements of section 139 of the Water Act, 2016.
After considering the application, the written and oral submissions by all stakeholders during the consultation period, and based on the latest available data, WASREB has determined an upward tariff review for OWSC is justified to improve service delivery, operate sustainably and protect consumer interests by meeting the tariff conditions attached to the tariff.
WASREB gives a one (1) months’ notice to all existing and potential customers of OWSC that the approved tariffs for the five financial years
2024/2025, 2025/2026, 2026/2027, 2027/2028 and 2028/2029 shall be as follows:
THE KENYA GAZETTE 4th October, 2024
12 Approved Tariff Structure for the period 2024/2025 to 2028/2029
1.1 Water Tariff
Consumer Categories Consumption Block Approved Tariff
(M3) (KSh./M3)
Domestic/Residential 1-6 190
7-20. 210
21-50 220
51-100 230
101-300 240
>300 250
Multi-Dwelling Units Per M3 210
Commercial/Industrial/Government/Institutions 1-50 220
51-100 230
101-300 240
>300 250
Public Schools/Colleges/Universities 1-600 195
601-1200 230
>1200m3 250
Unique Consumer Categories–Water Kiosk Per M3 185
Customers with non-functional meters shall be billed based on the average of the last three months’ bill.
1.2 Sewerage Tariff
1.2.1 Consumers with a Water Connection
(a) Sewerage will be charged at 75% of the water volumes, billed at the tariff for water specified (in 1.1) above for all customer categories
(b) Disconnected water accounts shall be charged based on the average sewerage charges for the last three months before the disconnection.
1.2.2 Customer with no water connection
Sewerage consumers without a water connection shall be charged as follows:
• Domestic customers without a metered source of water (Per Single dwelling unit): KSh. 350 Per Month
• All other categories: 75% of the volume of water consumed as per the metered source of water including boreholes, at the rates specified in
(1.1) above
1.3 Indexation
The utility’s approved tariffs for water and sewerage shall be eligible for annual indexation, as per the regulations of the Water Services Regulatory
Board (WASREB). The inflation adjustment shall come into effect every July of the tariff period commencing July 2025.
1.4 Miscellaneous Charges
Item/ Service Charge (KSh.)
Water Deposit
Category of consumer
Domestic 2,500
Retail shops less than 10m3 3,000
Retail shops more than 10m3 3,500
Bar and restaurants less than 15 m3 4,000
Bar and restaurants more than 15 m3 6,000
Hotel class “A” and “B” less than 150 m3 12,000
Hotel class “A” and “B” more than 150 m3 15,000
Hotel class “C” and ‘D’ less than 150 m3 18,000
Hotel class “C” and ‘D’ more than 150 m3 20,000
Multi-Dwelling Units less than 200m3 20,000
Multi-Dwelling Units more than 200m3 30,000
Malls and Supermarkets 25,000
Filling Stations, Garages and Car Wash 25,000
Hospitals and Health centres more than 150 m3 20,000
Hospitals and Health centres less than 150 m3 12,000
Schools and other institutions more than 200 m3 20,000
Schools and other institutions less than 200 m3 10,000
Minor construction sites of more than 200 m3 15,000
Major construction sites more than 300 m3 50,000
Light industries less than 200 m3 30,000
Medium industries between 200 m3 and 300 m3 50,000
Heavy industries of more than 300 m3 100,000
Water Kiosks 5,000
Customers with only sewer connection are to be charged a deposit equivalent to a water connection
Other Charges
Service
New water connection fee – Connection size: ½ inch to 1 inch 2,500
New water connection fee – Connection size: 1.5 inches to 3 inches 7,500
New water connection fee – Connection size above 3inches 15,000
Water Reconnection fee – at meter point 1,000
Water Reconnection fee – at mains 5,000 and double deposit
4th October, 2024 THE KENYA GAZETTE
Item/ Service Charge (KSh.)
Tanker – 8000 and 16,000 litres 2,500 and 5,000 respectively per tanker within OWSC’s area for all consumers
Sale of water Per M3 at bowsing point (own tanker) KSh. 200
Replacement of stolen or damaged meters 100% of the market cost of the meter
Meter testing on request 500
Sewer Connection- Residential/ Domestic 5,000
Sewer Connection- Commercial, Government, Schools, Universities and
Colleges
7,500
Sewer Connection- Industrial 15,000
Private sewer unblocking 2,500
Leak detection services 1,000
Sewer Reconnection fees 15,000
Statement of account fees 200
For cutting off the supply at the request of the consumer 200
For turning on the supply otherwise than in respect of a first connection 200
Exhauster Services (Company Exhauster) 5,000 for other customers and 4,000 for informal settlements
Private Exhausters (Dumping into the company’s sewer system) 15,000 per Truck per month
Penalties
Illegal water connection, -Commercial, Industry, Construction (Fraud) 100,000 plus estimated consumption during the period of illegality
Illegal water connection,– Domestic (Fraud) 30,000 plus estimated consumption during the period of the illegality
Overcharging (fraud) at water kiosk 15,000
Illegal sewer connection- Commercial, Industry, Construction 100,000
Illegal sewer connection- Domestic, Government, Schools, Universities &
Colleges
30,000
Self-reconnection after cut-off for non-payment 5,000 and billing to be backdated from the date of cut-off
Surcharge for tampering with meters (this to include meter removal, reversing of meter etc)
5,000
Surcharge for direct suction of water from the supply line using a pump 10,000
2.0 Cost Summary
Below is the summary of the recommended cost structure that makes up the total costs to be incurred by OWSC during the tariff period:
Expenditure Item 2022/23
(KSh.)
2023/24
(KSh.)
2024/25
(KSh.)
2025/26
(KSh.)
2026/27
(KSh.)
2027/28
KSh.)
2028/29
(KSh.)
Operations 155,521,604 168,386,858 197,687,848 216,264,956 229,703,187 241,300,280 254,379,153
Maintenance 5,589,873 7,221,970 7,221,970 7,583,069 7,962,222 8,360,333 8,778,350
Regulatory Levy 4,769,504 4,843,216 9,597,778 10,201,801 10,665,228 11,347,307 11,859,349
Total O&M Costs 165,880,981 180,452,044 214,507,595 234,049,825 248,330,637 261,007,919 275,016,852
Investment Costs - - 5,740,000 4,140,000 2,984,800 2,784,800 2,534,800
Debt Repayment - - - - - - -
Total Costs 165,880,981 180,452,044 220,247,595 238,189,825 251,315,437 263,792,719 277,551,652
Total Billing (KShs) 121,447,406 130,867,342 239,944,439 255,045,029 266,630,699 283,682,671 296,483,732
Collection Efficiency (%) 94% 94% 95% 95% 95% 95% 95%
Projected Revenue 114,160,562 123,015,301 227,947,217 242,292,777 253,299,164 269,498,537 281,659,545
Total Cost Coverage 69% 68% 103% 102% 101% 102% 101%
3.0 Conditions attached to the tariff approval
The conditions attached to this approval which shall form part of the license conditions of OWSC are:
(i) Service Delivery Conditions attached to the Tariff
Target 2022/2023 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028 2028/2029
Water Coverage (%) 77% 78% 79% 80% 81% 82% 83%
Water quality standards (%) 93% 100% Compliance with Standards
Personnel Expenditure as % of O&M 56% 53% 50% 47% 45% 43% 42%
Non-Revenue Water 35% 35% 35% 34% 33% 32% 31%
Hours of Supply (Hrs.) 16 17 17 18 18 19 19
Staff per 1000 connections 20 16 16 15 15 15 14
Metering ratio (%) 100% 100% 100% 100% 100% 100% 100%
Resale at Kiosk KSh. 5.00 per 20l Jerry Can
(ii) Annual budgets: The WSP shall adhere to the budgetary levels set in the tariff.
(iii) Surpluses: The surpluses realised during the tariff period shall be used to implement priority service delivery capital projects approved by
WASREB.
(iv) Reporting: The utility shall submit quarterly performance reports to WASREB in the prescribed format.
(v) Catchment Protection: The utility shall undertake measures to conserve/protect the catchment areas of their water source as part of
Corporate Social Responsibility.
(vi) Investments: The utility shall undertake the investments in Table 1 within the tariff period:
THE KENYA GAZETTE 4th October, 2024
Table 1: Investments
Proposed Investments for OWSC 2024/2025 to 2028/2029
Proposed
Activity
Metering
_New
Connections
Location/ point of use
Item Unit Quantity Unit Price 2024/2025 2025/2026 2026/2027 2027/2028 2028/2029
All zones in the water supply:
consumer connections
15mm water meter no 500 3,500 1,750,000 - - - -
All zones in the water supply:
consumer connections
15mm water meter no 300 3,500 - 1,050,000 - - -
All zones in the water supply:
consumer connections
15mm water meter no 300 3,500 - - 1,050,000 - -
Water Kiosks in the Low-Income
Areas
25mm water meter no 4 8,700 - - 34,800 - -
All zones in the water supply:
consumer connections
15mm water meter no 250 3,000 - - - 750,000 -
All zones in the water supply:
consumer connections
25mm water meter no 4 8,700 - - - 34,800 -
All zones in the water supply:
consumer connections
15mm water meter no 150 4,000 - - - - 600,000
All zones in the water supply:
consumer connections
25mm water meter no 4 8,700 - - - - 34,800
1,750,000 1,050,000 1,084,800 784,800 634,800
Water
Networks
Extensions
Network extensions of varied diameters
50mm to 63mm
Ngong and
Matasia water supplies m 1 800,000 800,000 - - - -
Bulbul
Township -
Ngong Water
Supply m 500 1,200 - 600,000 - - -
Matasia Water
Supply m 1000 1,200 - - 600,000 600,000 -
Scheme 305 -
Ngong Water
Supply m 500 1,200 - - - - -
800,000 600,000 600,000 600,000 600,000
Water works, Equipment, Pumps and
Motors
Construction of bulk Meter
Chambers
(Masonry type)
All zones in the water supply
- 5 15,000 75,000 - - - -
Pumps and equipment
Boreholes within the water supply
- 1 1,000,000 1,000,000 - - - -
Supply and install inline chlorine dozers
Boreholes in
Ngong Water
Supply
LS 2 60,000 - 120,000 - - -
Pumps and
Motors
Boreholes
Ngong Water
Supply ls 1 1,000,000 - 1,000,000 - - -
Pumps and
Motors
Boreholes within Matasia and Ngong water supplies ls 1 1,000,000 - - 1,000,000 - -
Pumps and
Motors
Boreholes -
Ngong water supply ls 1 1,000,000 - - - 1,000,000 -
Pumps and
Motors
Boreholes -
Ongata Rongai
Water Supply ls 1 1,000,000 - - - -
- - - 1,075,000 1,120,000 1,000,000 1,000,000 1,000,000
4th October, 2024 THE KENYA GAZETTE
Office
Furniture and
Equipment
Board Room chairs
Company
Board room no 10 5,000 - 50,000 - - -
Small Single pedestal desk
Company
Head Office no 5 5,000 - 25,000 - - - filling cabinets Company
Head Office no 5 15,000 - 75,000 - - -
Reception
Partitioning
Reception/ front office no 1 50,000 - 50,000 - - -
Office Chairs Company
Head Office no 10 2,000 - 20,000 - - -
Laptops Commercial/
Finance
Departments no 5 60,000 - 300,000 - - -
Conference Table Company
Board room no 1 100,000 - 100,000 - - -
Sub - Total - - - - 620,000 - - -
NRW-Management
Interventions
2,115,000 750,000 300,000 400,000 300,000
Total Annual Budgets 5,740,000 4,140,000 2,984,800 2,784,800 2,534,800
Dated the 6th September, 2024.
RICHARD K. CHERUIYOT, MR/6547681 Ag. Chief Executive Officer, Water Service Regulatory Board.
Dated the 6th September, 2024.
RICHARD K. CHERUIYOT,
Ag. Chief Executive Officer, Water Service Regulatory Board.
Extracted Entities (1)
previous_gazette_ref
12832
Details
- Act / Legislation
- THE WATER ACT
- Reference
- No. 43 of 2016
- Section
- section 72 (1) (b)
- Signed By
- RICHARD K. CHERUIYOT
- Title
- Ag. Chief Executive Officer, Water Service Regulatory Board
- Date Signed
- 6th September 2024
- Page
- 79
- Extraction Method
- regex
Source Gazette
Vol. CXXVI No. 151
Published 9th July 2024