it is hereby notified that the revised water and sanitation tariffs for NIWASCO for the period 2024/2025 to 2027/2028 shall be as follows:
1.0 Approved Tariff Structure
1.1 Water Tariff Structure for the period 2024/2025 to 2027/2028
Consumer Categories Consumption Block Approved Tariff
(m3) (KSh/m3)
Domestic/Residential
1-6 75
7-20. 91
21-50 100
51-100 110
101-300 125
>300 140
Multi-Dwelling Units Per m3 100
Commercial/Industrial
1-50 100
51-100 110
101-300 125
>300 140
Government/Institutions
1-50 100
51-100 110
100-300 125
>300 140
Public Schools
1-600 95
601-1200 125
>1200m3 140
Unique Consumer Categories Water Kiosks (Per m3) 70
Bulk Water Supply (Per m3) 91
Customers with non-functional meters shall be billed based on the average of the last three months’ bills.
1.2 Sewerage Tariff for the period 2024/2025 to 2027/2028
1.2.1 Consumers with a Water Connection
(a) Sewerage will be charged at 75% of the water volumes, billed at the tariff for water specified (in 1.1) above for all customer categories.
(b) Disconnected water accounts shall be charged based on the average of the last three months’ sewerage charges before the disconnection.
1.2.2 Customer with no water connection
Sewerage consumers without a water connection shall be charged as follows:
THE KENYA GAZETTE 6th December, 2024 a) Domestic customers without a metered source of water (Per Single dwelling unit): KSh. 350 Per Month;
b) All other categories: 75% of the volume of water consumed as per the metered source of water including boreholes, at the rates specified in
(1.1) above.
1.3 Indexation
The utility’s approved tariffs for water and sewerage shall be eligible for annual indexation, as per the regulations of the Water Services Regulatory
Board (WASREB). The inflation adjustment shall come into effect every July of the tariff period commencing July 2025.
1.4 Miscellaneous Charges
Item/Service Charge (KSh.)
Water Deposit
Category of consumer
Domestic 2500
Retail shops less than 10m3 3000
Retail shops more than 10m3 3,500
Bar and restaurants less than 15 m3 4000
Bar and restaurants more than 15 m3 6,000
Hotel class “A” and “B” less than 150 m3 12,000
Hotel class “A” and “B” more than 150 m3 15000
Hotel class “C” and ‘D’ less than 150 m3 18000
Hotel class “C” and ‘D’ more than 150 m3 20,000
Hospitals & Health centres more than 150 m3 20,000
Hospitals & Health centres less than 150 m3 12,000
Schools and other institutions more than 200 m3 20,000
Schools and other institutions less than 200 m3 10,000
Minor construction sites of more than 200 m3 15,000
Major construction sites more than 300 m3 50,000
Light industries less than 200 m3 30,000
Medium industries between 200 m3 and 300 m3 50,000
Heavy industries of more than 300 m3 100,000
Water Kiosks 5,000
Customers with only sewer connection are to be charged a deposit equivalent to a water connection
Other Charges
Service
New water connection fee – Connection size: ½ inch to 1 inch 2,500
New water connection fee – Connection size: 1.5 inches to 3 inches 7,500
New water connection fee – Connection size above 3inches 15,000
Water Reconnection fee – at meter point 1,000
Water Reconnection fee – at mains 5,000 and double deposit
Tanker – 8000 & 16,000 litres 3,500 & 7,000 respectively per tanker within the WSP area for all consumers
Sale of water Per M3 at bowsing point (own tanker) KSh .91
Replacement of stolen or damaged meters 100% of the market cost of the meter
Meter testing on request 500
Sewer Connection- Residential/ Domestic 5,000
Sewer Connection- Commercial, Government, Schools, Universities and
Colleges
7,500
Sewer Connection- Industrial 15,000
Private sewer unblocking 2,500
Leak detection services 1,000
Sewer Reconnection fee 15,000
Statement of account fees 200
For cutting off the supply at the request of the consumer 200
For turning on the supply otherwise than in respect of a first connection 200
Exhauster Services (Company Exhauster) KSh.7,500 within Chuka and Chogoria Schemes. To charge an additional KSh.1,500 for every 10km covered beyond the specified areas.
Private Exhausters (Dumping into the company’s sewer system) 15,000 per Truck per month
Penalties
Illegal water connection, -Commercial, Industry, Construction (Fraud) 100,000 plus estimated consumption during the period of illegality
Illegal water connection, (Fraud) – Domestic 50,000 plus estimated consumption during the period of the illegality
Overcharging (fraud) at water kiosk 15,000
Illegal sewer connection- Commercial, Industry, Construction 100,000
Illegal sewer connection- Domestic, Government, Schools, Universities and Colleges
30,000
Self-reconnection after cut-off for non-payment 5,000 and billing to be backdated from the date of cut-off
Surcharge for tampering with meters (this to include meter removal, reversing of meter, etc)
10,000
Surcharge for direct suction of water from the supply line using a pump 10,000
2.0 Cost Structure
2.1 Cost Summary
Below is the summary of the recommended cost structure that makes up the total costs to be incurred by NIWASCO during the tariff period:µ
6th December, 2024 THE KENYA GAZETTE
Expenditure Item 2023/2024 2024/2025 2025/2026 2026/2027 202720/28
Operations 81,541,335 95,834,878 99,969,091 104,158,430 105,285,948
Maintenance 19,500,282 21,499,061 22,574,014 23,702,715 24,887,850
Regulatory Levy 3,016,776 5,463,712 5,719,879 5,864,710 6,013,384
Total O&M Costs 104,058,393 122,797,651 128,262,984 133,725,855 136,187,182
Total Costs 104,058,393 122,797,651 128,262,984 133,725,855 136,187,182
Total Billing (KSh.) 81,894,694 136,592,796 142,996,974 146,617,752 148,177,412
Collection Efficiency (%) 93% 95% 95% 95% 95%
Projected Revenue 76,162,065 129,763,156 135,847,126 139,286,865 140,768,542
Total Cost Coverage 73% 106% 106% 104% 103%
(a) Conditions attached to the tariff approval
The conditions attached to this approval which shall form part of the license conditions of NIWASCO are:
(i) Service Delivery Conditions attached to the Tariff
Target 2022/2023 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Water Coverage (%) 49% 51% 53% 55% 57% 59%
Water quality standards (%) 100% Compliance with Standards
Personnel Expenditure as % of O&M 38% 37% 35% 35% 35% 34%
Non-Revenue Water 65% 63% 62% 61% 60% 59%
Hours of Supply (Hrs.) 16 16 17 17 18 18
Staff per 1000 connections 6 5 5 5 5 5
Metering ratio (%) 92% 92% 100% 100% 100% 100%
Collection Efficiency (%) 93% 93% 95% 95% 95% 95%
Resale at Kiosk KSh. 5.00 per 20l Jerry Can
(ii) Annual budgets: The WSP shall adhere to the budgetary levels set in the tariff.
(iii) Surpluses: The surpluses realised during the tariff period shall be used to implement priority service delivery capital projects approved by
WASREB.
(iv) Reporting: The utility shall submit quarterly performance reports to WASREB in the prescribed format.
(v) Creation of distinct water and sewer cost centres: NIWASCO will ensure it creates separate water and sewer cost centres and maintains distinct records of operations of the two centres.
(vi) Metering: NIWASCO shall progressively enhance the metering ratio to attain 100% as per condition (3.1) above.
(vii) Catchment Protection: The utility shall undertake measures to conserve/ protect the catchment areas of their water source as part of
Corporate Social Responsibility
(viii) County Support: The County Government of Tharaka Nithi Shall advance KSh. 50,000,000 (Fifty Million) during the tariff period to
NIWASCO in each financial year, which shall be used for Capital Investments as per the investment schedule below;
Niwasco Investments Schedule
Metering:
Consumer
Meters
Scheme Size Qty Unit Cost
(KSh.)
Estimated
Cost
2024-25 2025-26 2026-27 2027-28
New
Connections
Chuka-Karingani
Scheme
Dn 25mm 70 6,000.00 420,000.00 42,000 126,000 126,000 126,000.00
Dn 20mm 105 4,500.00 472,500.00 47,250 141,750 141,750 141,750.00
Dn 15mm 2,072 4,000.00 8,288,000.00 828,800 2,486,400 2,486,400 2,486,400.00
Chogoria Scheme Dn 25mm 42 6,000.00 252,000.00 25,200 75,600 75,600 75,600.00
Dn 20mm 70 4,500.00 315,000.00 31,500 94,500 94,500 94,500.00
Dn 15mm 560 4,000.00 2,240,000.00 224,000 672,000 672,000 672,000.00
Mutonga-Gituma
Scheme
Dn 25mm 42 6,000.00 252,000.00 25,200 75,600 75,600 75,600.00
Dn 20mm 35 4,500.00 157,500.00 15,750 47,250 47,250 47,250.00
Dn 15mm 280 4,000.00 1,120,000.00 112,000 336,000 336,000 336,000.00
Kibung'a Kakimiki Dn 25mm 35 6,000.00 210,000.00 21,000 63,000 63,000 63,000.00
Dn 20mm 42 4,500.00 189,000.00 18,900 56,700 56,700 56,700.00
Dn 15mm 560 4,000.00 2,240,000.00 224,000 672,000 672,000 672,000.00
Kathwana Scheme Dn 25mm 35 6,000.00 210,000.00 21,000 63,000 63,000 63,000.00
Dn 20mm 42 4,500.00 189,000.00 18,900 56,700 56,700 56,700.00
Dn 15mm 560 4,000.00 2,240,000.00 224,000 672,000 672,000 672,000.00
Sub-Total 18,795,000.00 1,879,500.00 5,638,500.00 5,638,500.00 5,638,500.00
Metering: -
Consumer Scheme Size Qty Unit Cost Estimated 2024-25 2025-26 2026-27 2027-28
THE KENYA GAZETTE 6th December, 2024
Niwasco Investments Schedule
Metering:
Consumer
Meters
Scheme Size Qty Unit Cost
(KSh.)
Estimated
Cost
2024-25 2025-26 2026-27 2027-28
Meters (KSh.) Cost
Replacement Chuka-Karingani
Scheme
Dn 25mm 30 6,000.00 180,000.00 18,000 54,000 54,000 54,000.00
Dn 20mm 45 4,500.00 202,500.00 20,250 60,750 60,750 60,750.00
Dn 15mm 888 4,000.00 3,552,000.00 355,200 1,065,600 1,065,600 1,065,600.00
Chogoria Scheme Dn 25mm 18 6,000.00 108,000.00 10,800 32,400 32,400 32,400.00
Dn 20mm 30 4,500.00 135,000.00 13,500 40,500 40,500 40,500.00
Dn 15mm 240 4,000.00 960,000.00 96,000 288,000 288,000 288,000.00
Mutonga-Gituma
Scheme
Dn 25mm 18 6,000.00 108,000.00 10,800 32,400 32,400 32,400.00
Dn 20mm 15 4,500.00 67,500.00 6,750 20,250 20,250 20,250.00
Scheme Size Qty Unit Cost
(KSh.)
Estimated
Cost
2024-25 2025-26 2026-27 2027-28
Dn 15mm 120 4,000.00 480,000.00 48,000 144,000 144,000 144,000.00
Kibung'a Kakimiki Dn 25mm 15 6,000.00 90,000.00 9,000 27,000 27,000 27,000.00
Dn 20mm 18 4,500.00 81,000.00 8,100 24,300 24,300 24,300.00
Dn 15mm 240 4,000.00 960,000.00 96,000 288,000 288,000 288,000.00
Kathwana Scheme Dn 25mm 15 6,000.00 90,000.00 9,000 27,000 27,000 27,000.00
Dn 20mm 18 4,500.00 81,000.00 8,100 24,300 24,300 24,300.00
Dn 15mm 240 4,000.00 960,000.00 96,000 288,000 288,000 288,000.00
Sub-Total 8,055,000.00 805,500.00 2,416,500.00 2,416,500.00 2,416,500.00
Rehabilitations Area Pipe size Distance
(km)
Unit cost
(KSh.)
Estimated
Cost
2024-25 2025-26 2026-27 2027-28
Chuka- Karingani
Scheme
Dn110/90mm 1.8 1,920,045.00 3,456,081.00 1,382,432.4 1,036,824.3 1,036,824.3
Chogoria Scheme Dn 160mm 1 2,087,500.00 2,087,500.00 835,000.0 626,250.0 626,250.0
Dn110mm 1.2 2,203,684.00 2,644,420.80 1,057,768.3 793,326.2 793,326.2
Dn 90mm 0.5 1,659,685.00 829,842.50 331,937.0 248,952.8 248,952.8
Mutonga -Gituma
Scheme
Dn 160mm 1.2 4,295,813.00 5,154,975.60 2,061,990.2 1,546,492.7 1,546,492.7
Kibung'a Kakimiki
Scheme
Dn 200mm 0.8 5,691,407.00 4,553,125.60 1,821,250.2 1,365,937.7 1,365,937.7
Kathwana Scheme Dn 200/160 mm
0.8 6,483,588.00 5,186,870.40 2,074,748.2 1,556,061.1 1,556,061.1
Dn110 mm 0.8 2,170,941.00 1,736,752.80 694,701.1 521,025.8 521,025.8
Sub-Total 25,649,568.70 10,259,827.48 7,694,870.61 7,694,870.61 -
PIPELINE
EXTENSIONS
SCHEME Pipe size Distance
(km)
Unit cost/KM Estimated
Cost
2024-25 2025-26 2026-27 2027-28
Chuka - Karingani Dn110mm -
50mm
8 1,227,422.00 9,819,376.00 981,938 2,945,813 2,945,813 2,945,813
- - - - -
Chogoria Scheme Dn 110mm-
50mm
8 1,227,422.00 9,819,376.00 981,938 2,945,813 2,945,813 2,945,813
- - - - -
Mutonga -Gituma
Scheme
Dn 63mm-
25mm
12 960,557.00 11,526,684.00 1,152,668 2,305,337 4,610,674 3,458,005
Kibung'a Kakimiki
Scheme
Dn 63mm-
25mm
16 1,091,404.00 17,462,464.00 1,746,246 2,619,370 5,238,739 6,111,862
Kathwana Dn 63mm-
25mm
10 1,028,122.00 10,281,220.00 1,028,122 3,084,366 3,084,366 3,084,366
Sub-Total 58,909,120.00 5,890,912.00 13,900,698.00 18,825,404.40 18,545,859.20
SCHEME Pipe size Distance
(km)
Unit cost/KM Estimated
Cost
2024-25 2025-26 2026-27 2027-28
Water Quality Purchase of Water
Lab Equipment and Reagents
Burette
100mls, borosil
40 500.00 20,000.00 5,000.00 5,000.00 5,000.00 5,000.00
Retort clamp aluminum
40 2,500.00 100,000.00 25,000.00 25,000.00 25,000.00 25,000.00
Pipette fillers
3 way
40 500.00 20,000.00 5,000.00 5,000.00 5,000.00 5,000.00
Flask boiling flat bottom
250mls,pyrex
40 700.00 28,000.00 7,000.00 7,000.00 7,000.00 7,000.00
Flask boiling flat bottom
500mls, pyrex
40 1,000.00 40,000.00 10,000.00 10,000.00 10,000.00 10,000.00
Funnel
100mm plastic
20 150.00 3,000.00 750.00 750.00 750.00 750.00
Measuring cylinder
500mls,borosi
20 700.00 14,000.00 3,500.00 3,500.00 3,500.00 3,500.00
6th December, 2024 THE KENYA GAZETTE
Niwasco Investments Schedule
Metering:
Consumer
Meters
Scheme Size Qty Unit Cost
(KSh.)
Estimated
Cost
2024-25 2025-26 2026-27 2027-28 l
Measuring cylinder
1000mls,boros il
20 100.00 2,000.00 500.00 500.00 500.00 500.00
Measuring cylinder
50mls,borosil
20 500.00 10,000.00 2,500.00 2,500.00 2,500.00 2,500.00
Measuring cylinder
100mls,borosi l
20 600.00 12,000.00 3,000.00 3,000.00 3,000.00 3,000.00
Volumetric flask
500ml,borosil
40 800.00 32,000.00 8,000.00 8,000.00 8,000.00 8,000.00
Volumetric flask
250mls,borosi l
40 600.00 24,000.00 6,000.00 6,000.00 6,000.00 6,000.00
Volumetric flask
100mls,borosi l
40 500.00 20,000.00 5,000.00 5,000.00 5,000.00 5,000.00
Conical flask mls,borosil
40 700.00 28,000.00 7,000.00 7,000.00 7,000.00 7,000.00
Conical flask mls,borosil
40 800.00 32,000.00 8,000.00 8,000.00 8,000.00 8,000.00
Spatula stainless spoon 8''
40 300.00 12,000.00 3,000.00 3,000.00 3,000.00 3,000.00
Wash bottles
500mls, plastic
40 700.00 28,000.00 7,000.00 7,000.00 7,000.00 7,000.00
First Aid box 16 1,000.00 16,000.00 4,000.00 4,000.00 4,000.00 4,000.00
Retort stand
(rod and base)
10'' x 6''
20 3,000.00 60,000.00 15,000.00 15,000.00 15,000.00 15,000.00
Graduated pipete
50ml,borosil
40 1,000.00 40,000.00 10,000.00 10,000.00 10,000.00 10,000.00
Graduated pipete
20ml,borosil
40 800.00 32,000.00 8,000.00 8,000.00 8,000.00 8,000.00
Graduated pipete
10ml,borosil
40 800.00 32,000.00 8,000.00 8,000.00 8,000.00 8,000.00
Sub-Total 605,000.00 151,250.00 151,250.00 151,250.00 151,250.00
Physical Location Specifications No. Unit Cost 2024-25 2025-26 2026-27 2027-28
Purchase and
Installation of
Pumps
Kathwana
Treatment Works
Pumphouse
Centrifugal pump F
50/160A,Q=1
100L/Min,7.5
Kw
2 120,000.00 240,000.00 120,000.00 120,000.00 - -
Mutonga-Gituma scheme Treatment works backwash system
Centrifugal pump F
50/160A,Q=1
100L/Min,7.5
Kw
0 120,000.00 - 120,000.00 120,000.00 - -
Physical Location Specifications No. Unit Cost 2024-25 2025-26 2026-27 2027-28
Kibung'a scheme treatment works backwash system
Centrifugal pump F
50/160A,Q=1
100L/Min,7.5
Kw
0 120,000.00 - - - - -
Sub-Total 240,000.00 240,000.00 240,000.00 - -
Acquisition of movable assets
Item Specifications No. Unit Cost 2024-25 2025-26 2026-27 2027-28
Motor vehicle Single Cab, Engine type
2.8L,2.8 cc,4WD,6- speed, 1 6,000,000.00 6,000,000.00 - - 6,000,000.00
THE KENYA GAZETTE 6th December, 2024
Niwasco Investments Schedule
Metering:
Consumer
Meters
Scheme Size Qty Unit Cost
(KSh.)
Estimated
Cost
2024-25 2025-26 2026-27 2027-28
Turbocharge
- 816,000.00 - 816,000.00
Sub-Total 6,000,000.00 - 816,000.00 - 6,816,000.00
ICT and Related
Assets
Item Specifications No. Unit Cost 2024-25 2025-26 2026-27 2027-28
Desktop
Computers
Operating
System-
Windows 10, Memory 8gb, HDD 1TB
10 80,000.00 800,000.00 240,000.00 240,000.00 160,000.00 160,000.00
Printers Desktop printer,3 in
1(print,scan,c opy),dye ink(black and color)
10 35,000.00 350,000.00 105,000.00 105,000.00 70,000.00 70,000.00
Finance/Acco unting
1 2,000,000.00 2,000,000.00 -
Human
Resource
1 2,000,000.00 2,000,000.00 1,000,000.00 2,000,000.00
Technical 1 2,000,000.00 2,000,000.00 2,000,000.00
GIS 1 2,000,000.00 2,000,000.00 2,000,000.00
Supply chain 1 2,000,000.00 2,000,000.00 2,000,000.00
Self-service portal
1 2,000,000.00 2,000,000.00 2,000,000.00
TV Smart UHD
4K LED TV
43"
1 70,000.00 70,000.00 70,000.00 - - -
Internet connection
(DTF and outside schemes) wifi connection
1 500,000.00 500,000.00 125,000.00 125,000.00 125,000.00 125,000.00
Laptops Windows
10,Core i7,8GB
RAM,1TB
HDD,bag
5 120,000.00 600,000.00 240,000.00 120,000.00 120,000.00 120,000.00
CCTV for all schemes (DTF, treatment facilities and outside schemes)
8no 360degree
CCTV camera kit,screen,DV
R with 1 TB harddisk,HD
MI,10amp power supply unit,mouse,Ins tallation cable, Set 150,000.00 750,000.00 300,000.00 150,000.00 150,000.00 150,000.00
Item Specifications No. Unit Cost 2024-25 2025-26 2026-27 2027-28
Office Telephones GSM wireless landline desk phone
14 10,000.00 140,000.00 40,000.00 40,000.00 30,000.00 30,000.00
Large format printer/photocopier
(Black & color)Print,sca n,copy,(A1,A
3,A4 papers)
1 550,000.00 550,000.00 - - 550,000.00 -
Sub-Total 15,760,000.00 4,120,000.00 2,780,000.00 3,205,000.00 4,655,000.00
Non-Revenue
Water
Item Specifications No. Unit Cost 2024-25 2025-26 2026-27 2027-28
Sounding rods Set 50,000.00 200,000.00 100,000.00 50,000.00 50,000.00
Pressure logger Nominal pressure 20 bars, Temp indication 0.1
˚C, Reference
Temp +23˚ C, Temp effect
(1˚C): ±
0.005%, operating temp -
10/+70˚C;
Programmable
Resolution 1, 2, 5, and 10, baud rate
38400,19200
No. 250,000.00 500,000.00 500,000.00 - -
6th December, 2024 THE KENYA GAZETTE
Niwasco Investments Schedule
Metering:
Consumer
Meters
Scheme Size Qty Unit Cost
(KSh.)
Estimated
Cost
2024-25 2025-26 2026-27 2027-28 and 9600, Peak Function readings/sec, storage
30,000 points incl of Temp, Power supply
-Batteries - alkaline batteries size
AAA, 1.5
V(Non- rechargeable), auto power off function to conserve power
Leak noise correlator
No. 280,000.00 560,000.00 - 280,000.00 280,000.00
Portable meter testing kit
Accuracy within ± 0.5%
0r readings, flow rate
10L/hr to 5 m3/hr,sensitiv ity < 0.003 m/s ata any flow rate including zero
Set 180,000.00 720,000.00 360,000.00 180,000.00 180,000.00
Pressure reducing valves
Set 265,000.00 2,650,000.00 1,060,000.00 1,060,000.00 530,000.00
Pipe locator Set 300,000.00 300,000.00 - - -
Item Specifications No. Unit Cost 2024-25 2025-26 2026-27 2027-28
Digital thickness
Meter
Display; 4 digits,10mm
LCD;
Measurement range 1-
200mm, Resolution 0.1 mm, Accuracy
±0.5%, Sound velocity 500-
9000 m/s, Power supply
-locally available batteries or
AAA batteries;
operating condition
Temp 0 -50 degree
Celsius, Humidity <
80%, calibration stds 5 steps-
1mm, 5mm, 10mm, 15mm and 20mm
No. 280,000.00 280,000.00 280,000.00
Arc GIS Software and mapping
Arc GIS Pro
2.9
Item 350,000.00 350,000.00 350,000.00
Fixed Meter testing bench
Semi- automatic Dn
15 - 25 mm
1 - 3,800,000.00 3,800,000.00
Bulk Ultrasonic
Flow meter Dn
250mm
Q3/Q1 R250 1 240,000.00 720,000.00 480,000.00 240,000.00
Bulk Ultrasonic
Flow meter Dn
Q3/Q1 R250 1 240,000.00 480,000.00 240,000.00 240,000.00
THE KENYA GAZETTE 6th December, 2024
Niwasco Investments Schedule
Metering:
Consumer
Meters
Scheme Size Qty Unit Cost
(KSh.)
Estimated
Cost
2024-25 2025-26 2026-27 2027-28
200mm
Bulk Ultrasonic
Flow meter Dn
150mm
Q3/Q1 R250 1 180,000.00 1,080,000.00 540,000.00 360,000.00 180,000.00
Customer cold water meters (for replacement)
Q3/Q1 R250 1000 4,000.00 4,000,000.00 2,000,000.00 1,000,000.00 1,000,000.00
Sub-Total 15,640,000.00 9,710,000.00 3,170,000.00 - 2,460,000.00
Annual Total 33,056,989.48 36,807,818.61 37,931,525.01 40,683,109.20
The water and sanitation tariffs outlined in this Corrigendum shall come into force with immediate effect.
Date the 29th November, 2024.
RICHARD CHERUIYOT, MR/6485621 Ag. Chief Executive Officer, Water Services Regulatory Board.
Dated the 29th November, 2024.
RICHARD CHERUIYOT,
Ag. Chief Executive Officer, Water Services Regulatory Board.
Extracted Entities (1)
previous_gazette_ref
5965 of 2024
Details
- Signed By
- RICHARD CHERUIYOT
- Title
- Ag. Chief Executive Officer, Water Services Regulatory Board
- Date Signed
- 29th November 2024
- Page
- 25
- Extraction Method
- regex
Source Gazette
Vol. CXXVI No. 213
Published 1st July 2024