Back
APPROVAL
100% confidence
via regex
GAZETTE NOTICE NO. 16246
GAZETTE NOTICE NO. 16246
THE WATER ACT
(No. 43 of 2016)
APPROVAL
in accordance with the requirements of section 139 of the Water Act 2016.
After considering the application, the written and oral submissions by all stakeholders during the consultation period, and based on the latest available data, WASREB has determined an upward tariff review for OLWASCO is justified to improve service delivery, operate sustainably and protect consumer interests by meeting the tariff conditions attached to the tariff.
WASREB gives a one (1) months’ notice to all existing and potential customers of OLWASCO that the approved tariffs for the three financial years 2024/2025, 2025/2026, and 2026/2027, shall be as follows:
1.0 Approved Tariff Structure for the period 2024/2025 to 2026/2027
1.1 Water Tariff
Consumer Categories Consumption Block Approved Tariff
(M3) (KSh./M3)
Domestic/Residential 1-6 120
7-20. 135
21-50 150
51-100 180
101-300 190
>300 200
Multi-Dwelling Units Per M3 150
Commercial/Industrial 1-50 150
51-100 180
101-300 190
>300 200
Government/Institutions 1-50 150
51-100 180
101-300 190
>300 200
Public Schools 1-600 135
601-1200 170
>1200m3 200
Unique Consumer Categories Bulk Water Supply - Per M3 120
Water Kiosks - Per M3 120
Customers with non-functional meters shall be billed based on the average of the last three months’ bills.
1.2 Sewerage Tariff
1.2.1 Consumers with a Water Connection
(a) Sewerage will be charged at 75% of the water volumes, billed at the tariff for water specified (in 1.1) above for all customer categories
6th December, 2024 THE KENYA GAZETTE
(b) Disconnected water accounts shall be charged based on the average of the last three months’ sewerage charges before the disconnection.
1.2.2 Customer with no water connection
Sewerage consumers without a water connection shall be charged as follows:
(a) Domestic customers without a metered source of water (Per Single dwelling unit): KSh. 300 Per Month
(b) All other categories: 75% of the volume of water consumed as per the metered source of water including boreholes, at the rates specified in (1.1) above
1.3 Indexation
The utility’s approved tariffs for water and sewerage shall be eligible for annual indexation, as per the regulations of the Water Services
Regulatory Board (WASREB). The inflation adjustment shall come into effect every July of the tariff period commencing July 2025.
1.4 Miscellaneous Charges
Item/ Service Charge (KSh.)
Water Deposit
Category of consumer
Domestic 2500
Retail shops less than 10m3 3000
Retail shops more than 10m3 3,500
Bar and restaurants less than 15 m3 4000
Bar and restaurants more than 15 m3 6,000
Hotel class “A” and “B” less than 150 m3 12,000
Hotel class “A” and “B” more than 150 m3 15000
Hotel class “C” and ‘D’ less than 150 m3 18000
Hotel class “C” and ‘D’ more than 150 m3 20,000
Hospitals & Health centres more than 150 m3 20,000
Hospitals & Health centres less than 150 m3 12,000
Schools and other institutions more than 200 m3 20,000
Schools and other institutions less than 200 m3 10,000
Minor construction sites of more than 200 m3 15,000
Major construction sites more than 300 m3 50,000
Light industries less than 200 m3 30,000
Medium industries between 200 m3 and 300 m3 50,000
Heavy industries of more than 300 m3 100,000
Water Kiosks 5,000
Customers with only sewer connection are to be charged a deposit equivalent to a water connection
Other Charges
Service
New water connection fee – Connection size: ½ inch to 1 inch 2,500
New water connection fee – Connection size: 1.5 inches to 3 inches 7,500
New water connection fee – Connection size above 3inches 15,000
Water Reconnection fee – at meter point 1,000
Water Reconnection fee – at mains 5,000 and double deposit
Tanker – 8000 & 16,000 litres 2,500 & 5,000 respectively per tanker within OLWASCO area for all consumers
Sale of water Per M3 at bowsing point (own tanker) KSh. 135
Replacement of stolen or damaged meters 100% of the market cost of the meter
Meter testing on request 500
Sewer Connection- Residential/ Domestic 5,000
Sewer Connection- Commercial, Government, Schools, Universities and Colleges
7,500
Sewer Connection- Industrial 15,000
Private sewer unblocking 2,500
Leak detection services 1,000
Sewer Reconnection fee 15,000
Statement of account fees 200
For cutting off the supply at the request of the consumer 200
For turning on the supply otherwise than in respect of a first connection 200
Exhauster Services (Company Exhauster) 5,000 for other customers and 4,000 for informal settlements
Private Exhausters (Dumping into the company’s sewer system) 15,000 per Truck per month
Penalties
Illegal water connection, -Commercial, Industry, Construction (Fraud) 100,000 plus estimated consumption during the period of illegality
Illegal water connection, (Fraud) – Domestic 30,000 plus estimated consumption during the period of the illegality
Overcharging (fraud) at water kiosk 15,000
Illegal sewer connection- Commercial, Industry, Construction 100,000
Illegal sewer connection- Domestic, Government, Schools, Universities
& Colleges
30,000
Self-reconnection after cut-off for non-payment 5,000 and billing to be backdated from the date of cut-off
Surcharge for tampering with meters (this to include meter removal, reversing of meter etc)
5,000
Surcharge for direct suction of water from the supply line using a pump 10,000
THE KENYA GAZETTE 6th December, 2024
2.0 Cost Summary
Below is the summary of the recommended cost structure that makes up the total costs to be incurred by OLWASCO during the tariff period:
Expenditure Item 2022/23 2023/24 2024/25 2025/26 2026/27
Operations 31,606,377 49,805,858 54,733,618 54,733,618 54,733,618
Maintenance 11,552,542 11,608,905 17,150,000 16,950,000 18,850,000
Regulatory Levy 1,647,249 1,817,426 3,582,139 3,692,239 3,811,652
Total O&M Costs 44,806,168 63,232,190 76,575,747 76,575,747 76,575,747
Investment Costs - 124,700 3,011,718 7,295,529 7,986,500
Debt Repayment - - - - -
Total Costs 44,806,168 63,356,890 77,367,486 83,292,942 87,820,471
Total Billing (KSh.) 41,210,283 46,225,714 89,553,484 92,305,966 95,291,300
Collection Efficiency (%) 98% 101% 95% 95% 95% rojected Revenue 40,386,077 46,687,971 85,075,810 87,690,668 90,526,735
Total Cost Coverage 90% 74% 110% 105% 103%
(b) Conditions attached to the tariff approval
The conditions attached to this approval which shall form part of the license conditions of OLWASCO are:
(i) Service Delivery Conditions attached to the Tariff
Target 2022/2023 2023/2024 2024/2025 2025/2026 2026/2027
Water Coverage (%) 38% 39% 40% 41% 42%
Water quality standards (%) 32% 100% Compliance with Standards
Personnel Expenditure as % of O&M 46% 46% 46% 46% 45%
Non-Revenue Water 37% 35% 32% 30% 28%
Hours of Supply (Hrs.) 18 19 19 20 20
Staff per 1000 connections 14 13 10 10 9
Metering ratio (%) 100% 100% 100% 100% 100%
Collection Efficiency (%) 87% 101% 95% 95% 95%
Resale at Kiosk KSh. 5.00 per 20l Jerry Can
(ii) Annual budgets: The WSP shall adhere to the budgetary levels set in the tariff.
(iii) Surpluses: The surpluses realised during the tariff period shall be used to implement priority service delivery capital projects approved by
WASREB.
(iv) Reporting: The utility shall submit quarterly performance reports to WASREB in the prescribed format.
(v) County Investments: The County Government of Nyandarua will fund the following projects during the tariff period.
Project Estimated Budget (KSh.)
Upgrading and distribution networks for ten (10) boreholes 20,293,685
Purchase and installation of 3,660 consumer meters 19,190,000
Purchase and installation of 14 No. bulk meters 3,370,000
Construction of 10 km of Sewer lateral lines and 500 consumer connections 16,000,000
Total 58,853,685
(vi) Creation of distinct water and sewer cost centres: OLWASCO will ensure it creates separate water and sewer cost centres and maintains distinct record of operations of the two centres.
(vii) Investments: The utility shall undertake the investments in Table 1 within the tariff period
Internal Investment by Olwasco-Non-Revenue Water Management Plan Estimated Cost (KSh.)
Objective Interventions Current
Status
Current
Diameter
(mm)
Proposed
Diameter
(mm)
Distance
(m)
2024/
2025/ 2026 2026/
NRW Management Replacement of pipeline to HDPE from Vision Villa Junction to JM
Nursery School
Age PVC and prone
Leaks and
Bursts
63 63 400 183,653.00
Replacement of the Alexander pipeline from PVC to HDPE
50 50 500 138,500.00
Accurate
Measurement
Provision for meters 4''and 2'' installation at the points that source water to the zone
No Meters
Installed
None DN
100and6
2 100,500.00
NRW Management Replacement of Jacaranda PVC
Pipeline to HDPE
Prone to
Bursts and
Leaks
63 63 300 118,000.00
Replacement of Market pipeline from PVC to HDPE
Prone to
Bursts and
Leaks
63 63 400 150,800.00
Accurate
Measurement
Metering the slaughterhouse pipeline
No Meters
Installed
None DN63 1 42,500.00
Metering the DC pipeline None DN63 1 42,500.00
Metering Town Borehole No. 3 None DN63 1 42,500.00
Metering the 3” offtake with a new control valve.
None DN90 1 52,200.00
6th December, 2024 THE KENYA GAZETTE
Internal Investment by Olwasco-Non-Revenue Water Management Plan Estimated Cost (KSh.)
Objective Interventions Current
Status
Current
Diameter
(mm)
Proposed
Diameter
(mm)
Distance
(m)
2024/
2025/ 2026 2026/
NRW Management Replacement of ACK Road pipeline with HDPE
Prone to
Bursts and
Leaks
50 50 2,300 566,000.00
NRW Management Replacement of Mombasa Estate
PVC pipeline with HDPE at a distance of 500 meters, which is prone to leaks and bursts.
Age PVC and prone
Leaks and
Bursts
63 63 500 183,800.00
Accurate
Measurement
Metering all the water source points to the zone with requisite accessories
No Meters
Installed
None 90 2 125,000.00
Metering of all the source offtakes to the zone with requisite accessories
No Meter
Installed
None 63and90 3 145,000.00
Metering of the zone water sources with requisite accessories
No Meter
Installed
None 63and10
2 120,000.00
NRW Management Replacement of Githire pipeline from PVC to HDPE
Aged and
Prone to
Leaks and
Bursts
32 50 300 91,000.00
Replacement of Esther pipeline from PVC to HDPE
32 50 300 91,000.00
Replacement of Wambugu pipeline from PVC to 5HDPE
32 50 300 91,000.00
Accurate
Measurement
Metering of the zone water sources with requisite accessories
No Meter
Installed
None 63 2 98,000.00
NRW Management Replacement of the Captain pipeline from PVC to HDPE
Aged and prone to bursts and
Leaks
90 100 9,000 6,200
,000.
Replacement of Captain Mihuti
Road pipeline PVC to HDPE
63 63 3,000 1,300
,000.
Replacement of the control valve
1½ at A.I C Captain Church.
3,500
.00
Replacement of Chief Wanjohi pipeline from PVC to HDPE
63 63 500 183,7
50.00
Replacement of Muiri pipeline from Muiri tank to the tarmac from PVC to HDPE
63 63 500 183,7
50.00
Accurate
Measurement
Metering of the sources that supply water to the zone
No Meter
Installed
None 63and90 2 115,5
00.00
NRW Management Replacement of Ireri Road pipeline from PVC to HDPE
Age PVC and prone
Leaks and
Bursts
63 63 500 183,750
Accurate
Measurement
Meter the service lines that supplies water to the zone. With requisite accessories
No Meter
Installed
None 50 4 100,000
NRW Management Replacement of Dumpsite Road pipeline from 63mm PVC to
HDPE
Aged and
Prone to
Leaks and
Bursts
63 63 2,000 678,663
Replacement of Macharia pipeline from PVC to HDPE
Hydraulic
Limitations and
Blockages
15 32 600 120,000
Replacement of Kabros pipeline from PVC to HDPE
25 50 300 91,000
Flow
Measurements
Metering of the offtakes that source water to the zone.
No Meter
Installed
None 63 2 98,500
NRW Management Replacement of Rurii township from PVC to HDPE
Age PVC and prone
Leaks and
Bursts
Ranging from 63-
15 mm
63 2,000 678,663
Accurate
Measurement
Meter the main service line from
Vatican
No Meter
Installed
None 90 1 63,000
Meter the service lines within the system at strategic points
No Meter
Installed
None 50 2 50,000
Meter all the unmetered connections within Rurii zone
Only 11No.
Customers metered
15and25 15 100 250,000
Replacement of customer meters
All zones 500 ½ to ¾ inch
KSh.
2,600,000
THE KENYA GAZETTE 6th December, 2024
NRW Management tools and equipment
NRW Management tools and equipment
Leak Noise Correlator+ Ground
Microphone
No. 2 KSh. 18,000.00 36,000.0
Metallic and Non-Metallic Pipe
Locator
No. 1 KSh.
600,000.00
600,000.
HDPE Butt Fusion Welding
Machine
No. 2 KSh. 50,000.00 100,000.
Acoustic Water Leak Locator No. 2 KSh. 93,400.00 186,800.
Ferrous Metal Detector No. 2 KSh. 44,459.00 88,918.0
Pressure Flow and Data Logger with GSM
No. 2 KSh. 50,000.00 100,000.
Portable Ultrasonic Flow Meter
(with thickness gauge) for large- diameter pipes
No. 1 KSh.
1,500,000.00
1,500,00
0.00
Portable Meter Tester No. 2 KSh.
200,000.00
400,000.
Grand Total KSh. 3,011,71
8.00
7,295,529.00 7,986,500.00
INVESTMENT SUPPORTED BY NYANDARUA COUNTY GOVERNMENT
1- INVESTMENT TO IMPROVE WATER ACCESS LEVELS
Project Activities Unit Quantity Unit Cost
(KSh)
2024/2025
(KSh)
2025/2026
(KSh)
2026/2027
(KSh)
Captain Pump Excavate trench 450mm wide and 600mm in common soil. keep trench bottom level, backfill to return the site to original level
Lot 1 318,120.00 318,120.00 - -
Supply material and construct manhole chamber to house sluice valve and meter with the following measurements 1000mmX
1000mmX 1000mm high, plaster the internal walls and point the external walls
No 1 40,000.00 - 40,000.00 -
J.M Primary School
Pump
Supply to site,handle and lay PN 16 ,2’’ dia
HDPE pipes
M 23 320 7,360.00 - -
Supply to site, handle and fix the following-
Saddle Clamp 2 1/2 x 2’’ dia, Cast Iron
Flanged Ultrasonic meter 2’’ dia,pegler gate valve 2’’,Threaded Flanged 2’’ dia, None
Return Valve 2’’
HDPE union 2’’, HDPE female adaptor 2’’, HDPE Elbow 2’’
Lot 1 246,630 - 246,630.00
Supply material and construct manhole chamber to house sluice valve and meter with the following measurements 1000mmX
1000mmX 1000mm high,plaster the internal walls and point the external walls
No 1 40,000.00 - - 40,000.00
Kieni Pump Supply to site,handle, and lay PN 16 HDPE pipes of HDPE 2’’ dia
M 20 320.00 6,400.00 - -
Excavate trench 450mm wide and 600mm in common soil.keep trench bottom level,backfill to return the site to original level
Lot 1 256,630.00 - 256,630.00 -
Supply material and construct manhole chamber to house sluice valve and meter with the following measurements 1000mmX
1000mmX 1000mm high, plaster the internal walls and point the external walls
No 1 40,000.00 - - 40,000.00
Kiganjo Pump Supply to site, handle, and lay PN 16 HDPE pipes of HDPE 3’’ dia
M 15 650.00 9,750.00 - - supply to the site, handle and fix the following
Saddle Clamp 3’’ x 3’’ dia,Cast Iron Flanged
Ultrasonic meter 3’’ dia,pegler gate valve
3’’,Threaded Flanged 3’’ dia, None Return
Valve 3’’
HDPE union 3’’, HDPE female adaptor 3’’, HDPE Elbow 3’’
Lot 1 312,620.00 - 312,620.00 -
Supply material and construct a manhole chamber to house sluice valve and meter with the following measurements 1000mmX
1000mmX 1000mm high, plaster the internal walls and point the external walls
No 1 40,000.00 - - 40,000.00
Excavate trench 450mm wide and 600mm in common soil.keep trench bottom level,backfill to return the site to original level
LM 3,000.00 150.00 450,000.00
Mwihoti Pump Supply to site,handle and lay PN 16 HDPE pipes of 3’’ dia
M 3,000.00 650.00 1,950,000.00 -
6th December, 2024 THE KENYA GAZETTE
Project Activities Unit Quantity Unit Cost
(KSh)
2024/2025
(KSh)
2025/2026
(KSh)
2026/2027
(KSh) supply to site, handle and fix the following-G.I
Reducing Socket 3’’ x 2’’, Cast Iron Flanged
Ultrasonic metre 3’’ dia,Flanged Sluice Valve
3’’ dia, Threaded Flanges 3’’ dia, HDPE
Coupling 3’’ dia, None return Valve 3’’ dia
Lot 1 436,100.00 - 436,100.00 -
Supply material and construct manhole chamber to house sluice valve,washout,airvalve and meter with the following measurements 1000mmX 1000mmX
1000mm high,plaster the internal walls and point the external walls
No 1 120,000.00 - - 120,000.00
Excavate trench 450mm wide and 600mm in common soil.keep trench bottom level,backfill to return the site to original level
LM 4,598.00 150.00 689,700.00 - -
Site And Service Supply to site, handle and lay HDPE pipes of the following sizes -PN 12.5 90mm dia, PN
12.5 63mm dia, PN 12.5 50mm dia and PN
12.5 32 mm dia
Lot 1 2,654,335.00 2,654,335.0
- - supply to site, handle and fix the following-
Cast Iron Flanged Ultrasonic meter 90mm dia, Sluice Valve 90mm dia, Saddle Clamp 90mm x 63mm dia, Gate Valves 32’’ dia, 63’’ dia and
50’’ dia, Threaded Flanged 90mm dia,None
Return Valves 90mm dia, Saddle clamp 63mm x 32 mm dia
Lot 1 473,270.00 - 473,270.00 -
Metering- Supply and install broken and damaged saddle for 800 household
Lot 1 1,558,000.00 - - 1,558,000.00
Construction of valve chambers- Supply material and construct manhole chamber to house sluice valve and meter with the following measurements 750mmX 750mmX
750mm high,plaster the internal walls and point the external walls
Lot 1 180,000.00 - - 180,000.00
Excavate trench 450mm wide and 600mm in common soil.keep trench bottom level,backfill to return the site to original level
LM 547 150.00 82,050.00 - -
Park Pump Supply to site,handle and lay PN 16 HDPE pipes of 3’’ dia
M 547 650 355,550.00 - - supply to site , handle and fix the following-
Saddle Clamp 3’’ x 3’’ dia, G.I Reducing socket 3’’ x 2’’, Cast Iron Flanged Meter 3’’ dia, Flanged Sluice Valve 3’’ dia, Threaded
Flanges 3’’ dia, HDPE Coupling 3’’ dia
Lot 1 339,320.00 - 339,320.00 -
Construction of valve chambers- Supply material and construct manhole chamber to house sluice valve and meter with the following measurements 1000mmX 1000mmX
1000mm high,plaster the internal walls and point the external walls
No 1 40,000.00 - - 40,000.00
Excavate trench 450mm wide and 600mm in common soil.keep trench bottom level, backfill to return the site to original level
LM 5,500 150.00 825,000.00
Simba Pump Supply to site, handle, and lay PN 16 HDPE pipes of 3’’ dia
M 5,500 650.00 3,575,000.0
- - supply to site, handle and fix - Saddle Clamp
3’’ x 3’’ dia, G.I Reducing socket 3’’ x 2’’, Cast Iron Flanged Meter 3’’ dia, Flanged
Sluice Valve 3’’ dia, Threaded Flanges 3’’ dia, HDPE Coupling 3’’ dia
Lot 1 507,640.00 - 507,640.00 -
Construction of valve chambers-Supply material and construct manhole chamber to house sluice valve,washout,airvalve and meter with the following measurements 1000mmX
1000mmX 1000mm high,plaster the internal walls and point the external walls
Lot 1 240,000.00 - - 240,000.00
Excavate trench 450mm wide and 600mm in common soil.keep trench bottom level,backfill to return the site to original level
LM 4,100 150.00 615,000.00 - -
Site 22 Village Supply to site,handle and lay PN 16 HDPE pipes of 3’’ dia
M 4,100 650.00 - - 2,665,000.00 supply to site, handle and fix the following-
Saddle Clamp 3’’ x 3’’ dia, G.I Reducing socket 3’’ x 2’’, Cast Iron Flanged Meter 3’’ dia, Flanged Sluice Valve 3’’ dia, Threaded
Flanges 3’’ dia, HDPE Coupling 3’’ dia
Lot 1 507,640.00 - 507,640.00 -
Construction of valve chambers- Supply material and construct manhole chamber to
No 1 200,000.00 - - 200,000.00
THE KENYA GAZETTE 6th December, 2024
Project Activities Unit Quantity Unit Cost
(KSh)
2024/2025
(KSh)
2025/2026
(KSh)
2026/2027
(KSh) house sluice valve,washout,airvalve and meter with the following measurements 1000mmX
1000mmX 1000mm high,plaster the internal walls and point the external walls
Excavate trench 450mm wide and 600mm in common soil. keep trench bottom level, backfill to return the site to original level
LM 38 150.00 - 5,700.00 -
Vatican Pump Supply to site, handle and lay PN 16 HDPE pipes of 3’’ dia
M 38 650.00 24,700.00 - - supply to site, handle and fix the following-
Saddle Clamp 3’’ x 3’’ dia, G.I Reducing socket 3’’ x 2’’, Cast Iron Flanged Meter 3’’ dia, Flanged Sluice Valve 3’’ dia, Threaded
Flanges 3’’ dia, HDPE Coupling 3’’ dia
Lot 1 317,470.00 - 317,470.00 -
Construction of valve chambers- Supply material and construct manhole chamber to house sluice valve and meter with the following measurements 1000mmX 1000mmX
1000mm high,plaster the internal walls and point the external walls
No 1 40,000.00 - - 40,000.00
2.Water investments -Customer meters
Customer Meters -Meters 1/2 '' 3600 Pcs 5200 11,440,000.
7,280,000.00 -
Customer Meters -Meters 3/4'' 40 Pcs 6500 65,000.00 130,000.00 65,000.00
Customer Meters -Meters 1'' 20 Pcs 8000 40,000.00 80,000.00 40,000.00
3. Water investments - BULK
Bulk Meters -Meters 3'' 10 Pcs 233,000.00 466,000.00 1,165,000.00 699,000.00
Bulk Meters -Meter 4'' 4 Pcs 260,000.00 260,000.00 520,000.00 260,000.00
4. Sewerage Investments
Construction of Inspection chambers 500 No. 12,000.00 600,000.00 1,800,000.00 3,600,000.00 laying of laterals 10km 1,000,000.00 - 4,000,000.00 6,000,000.00
Totals 22,033,965 20,818,020 26,907,076
Date the 29th November, 2024.
RICHARD CHERUIYOT, MR/6485621 Ag. Chief Executive Officer, Water Services Regulatory Board.
Dated the 29th November, 2024.
RICHARD CHERUIYOT,
Ag. Chief Executive Officer, Water Services Regulatory Board.
Extracted Entities (1)
previous_gazette_ref
16246
Details
- Act / Legislation
- THE WATER ACT
- Reference
- No. 43 of 2016
- Section
- section 72 (1)
- Signed By
- RICHARD CHERUIYOT
- Title
- Ag. Chief Executive Officer, Water Services Regulatory Board
- Date Signed
- 29th November 2024
- Page
- 32
- Extraction Method
- regex
Source Gazette
Vol. CXXVI No. 213
Published 1st July 2024