GAZETTE NOTICE NO. 10501
PURSUANT to clause 2 of Part III of the Schedule of Tariffs 2018, notice is given that all prices for electrical energy specified in Part II of the said Schedule will be liable to a foreign exchange fluctuation adjustment of plus 14.17 Kenya cents per kWh for all meter readings to be taken in
November, 2019. Information used to calculate the Adjustment:
KenGen (FZ) KPLC (HZ) IPPs (IPPZ) Total (ZF+ZH+IPPZ)
Exchange Gain/(Loss) 4,125,686.63 9,242,902.57 105,753,979.31 119,122,568.51
Total units generated and purchased (G) excluding exports in October, 2019 = 987 733,913 kWh
ROBERT PAVEL OIMEKE, MR/5815861
Director-General.
Extracted Entities (1)
previous_gazette_ref
10501
Details
- Signed By
- ROBERT PAVEL OIMEKE
- Title
- Director-General