GAZETTE NOTICE NO. 10502
PURSUANT to clause 5 of Part III of the Schedule of Tariffs 2018, notice is given that all prices for electrical energy specified in Part II -
(A) of the said Schedule will be liable to a Water Resource Management Authority (WRMA) levy of plus 1.59 Kenya cents per kWh for all meter readings to be taken in November, 2019.
Information used to calculate the WRMA Levy:
Approved WRMA levy for energy purchased from hydropower plants of capacity equal to or above 1MW = 5 Kenya cents per KWh.
Units Purchased in October, 2019
Hydropower Plant (KWh)
Gitaru ' 66,458,000
Kamburu 8,467,000
Kiambere 49,813,000
Kindaruma 15,787,340
Masinga 2,643,000
Tana 11,899,771
Wanjii
Sagana 820,517
Ndula -
Turkwel 46,890,850
Gogo 305,173
Sondu Miriu 44,054,000
Sangoro 15,185,450
Regen-Terem 3,219,279
Chania 61,834
Gura 2,399,631
Total units purchased from hydropower plants with capacity equal to or above 1MW = 268,004,845 kWh
Total units generated and purchased (G) excluding exports in October, 2019 = 987,733,913 kWh
ROBERT PAVEL OIMEKE, MR/5815861
Director-General.
Extracted Entities (1)
previous_gazette_ref
10502
Details
- Signed By
- ROBERT PAVEL OIMEKE
- Title
- Director-General
- Page
- 26
- Extraction Method
- regex
Source Gazette
Vol. CXXI No. 152
Published 1st April 2019