GAZETTE NOTICE NO. 147
GAZETTE NOTICE NO. 147
THE PHYSICAL PLANNING ACT
(Cap. 286)
COMPLETION OF DEVELOPMENT PLAN
NOTICE is given that the above-mentioned development plan was on 23rd December, 2015, completed.
The part development plan relates to land situated within Namanga
Township along Namanga-Amboseli Road in Kajiado County.
Copies of the part development plan are available for public inspection at the office of the Governor, Kajiado County, County
Commissioner, Kajiado and the County Physical Planning Office, Kajiado.
The copies so deposited are available for public inspection at the office of the Governor, Kajiado County, County Commissioner, Kajiado and the County Physical Planning Office, Kajiado, between the hours of 8.00 a.m. to 5.00 p.m. Monday to Friday.
Any interested person who wishes to make any representation in connection with or objection to the above-named part development plan may send such representation or objection in writing to the
County Physical Planning Officer, P.O. Box 11-01100, Kajiado, within sixty (60) days from the date of publication of this notice and any such representation or objection shall state the ground on which it is made.
Dated the 23rd December, 2015.
FRED SWALAH, MR/8448597 for Director of Physical Planning.
GAZE I fE NOTICE No. 148
THE PHYSICAL PLANNING ACT
(Cap. 286)
COMPLETION OF LOCAL DEVELOPMENT PLAN
(PDP No. CKR1269111101 for Existing Site for P.C.E.A. Church, Kibirigwi)
NOTICE is given that the above-mentioned development plan was on 19th November, 2015, completed.
The part development plan relates to land situated within
Kirinyaga County.
Copies of the part development plan are available for public inspection at the office of the County Physical Planning Officer, Kirinyaga, the County Commissioner's office, Kirinyaga Central and
Deputy Commissioner's office, Kirinyaga West.
The copies so deposited are available for public inspection at the office of the County Physical Planning Officer, Kirinyaga, the County
Commissioner's office, Kirinyaga Central and Deputy
Commissioner's office, Kirinyaga West, between the hours of 8.00 a.m. to 5.00 p.m. Monday to Friday.
Any interested person who wishes to make any representation in connection with or objection to the above-named part development plan may send such representation or objection in writing to the
County Physical Planning Officer, P.O. Box 483, Kerugoya, within sixty (60) days from the date of publication of this notice and any such representation or objection shall state the ground on which it is made.
Dated the 13th January, 2015.
W. L. LOKA, MR/8448936 for Director of Physical Planning.
GAZEI tE NOTICE NO. 149
THE PHYSICAL PLANNING ACT
(Cap. 286)
COMPLETION OF PART DEVELOPMENT PLAN
(PDP No. MKS/56/2015/03 for Existing Site for Kenya Medical
Training College, Machakos)
NOTICE is given that the above-mentioned development plan was on 4th January, 2016, completed.
The part development plan relates to land situated within Sub- county of Machakos
Copies of the part development plan are available for public inspection at the office of the Machakos Sub-county Administrator and
County Physical Planing Office, Machakos.
The copies so deposited are available for public inspection at the office of the Machakos Sub-county Administrator and County Physical
Planing Office, Machakos, between the hours of 8.00 a.m. to 5.00 p.m.
Monday to Friday.
Any interested person who wishes to make any representation in connection with or objection to the above-named part development plan may send such representation or objection in writing to the
Director of Physical Planning, P.O. Box 333, Machakos, within sixty
(60) days from the date of publication of this notice and any such representation or objection shall state the ground on which it is made.
Dated the 4th January, 2015.
KARURU CHEGE, MR/8448969 for Director of Physical Planning.
GAZEI tE NOTICE No. 150
THE ENVIRONMENTAL MANAGEMENT AND
CO-ORDINATION ACT
(No. 8 of 1999)
THE NATIONAL ENVIRONMENT MANAGEMENT
AUTHORITY
NOTICE TO THE PUBLIC TO SUBMIT COMMENTS ON AN
ENVIRONMENTAL IMPACT ASSESSMENT STUDY REPORT
FOR THE PROPOSED DENMARK SERVICE STATION, AT KISII
- MIRUKA AND KISII - DARAJA MBIRI ROADS JUNCTION, WITHIN KISII TOWN IN KISII COUNTY
INVITATION OF PUBLIC COMMENTS
PURSUANT to regulation 21 of the Environmental Management and Co-ordination (Impact Assessment and Audit) Regulations, 2003, the National Environment Management Authority (NEMA) has received an Environmental Impact Assessment Study Report for the above proposed project.
The proponent, Dennis Magare Makori, is proposing Denmark
Service Station, at Kisii - Miruka and Kisii - Daraja Mbiri Roads
Junction within Kisii Town in Kisii County. The project highlights include: Canopy over the pumps, sales office, a restaurant, a store, underground fuel tanks, compressor/generator, car wash, drive ways, walkways, interceptor tank and washrooms.
The following are the anticipated impacts and proposed mitigation measures:
Project Activities/ Mitigation I Enhancement Measures
Environmental Effect
Air pollution caused by • Prohibit idling of vehicles at site during material and equipment excavation.
transport, earthworks, material extraction, material crushing/screening/ • piling, Spraying water on dusty materials/workplace.
Regular maintenance of construction plant and equipment.
Worker camping, site office operations and actual construction works health and safety risks
Land, water and soil degradation/ contamination caused by oil and chemical spillage by machines and vehicles
Fire risks due to un- controlled disposal of spent cigarettes remains, use of fire for domestic cooking and spillage of diesel/petrol.
Site Clearance and excavation leading to soil erosion and vegetation loss
Increased soil erosion due to reduced infiltration by impermeable surface and collection of directed runoffs.
Leakages from underground fuel storage and spillage during handling
Solid waste generation
Visual intrusion
Generation of solid wastes
Machine and equipment • operations leading to noise pollution
•
Poor living standards of • workers at the site camps
Fuelling of vehicles • leading to solid waste generation, possible accidents, noise and air pollution
•Enclosing the site where possible.
•Workers should be provided with dust masks.
•Proper storage, handling and disposal of oil and wastes from machinery.
•Discourage servicing of machinery and vehicles on site except on containment area.
•Machinery should be well maintained to prevent oil leaks.
•Construct oil receptor tank.
•Contractor should have a designated area where maintenance is carried out and that is protected from rain water.
•All oil products should be stored in a site store and handled carefully.
Remediate contaminated soil.
Landscaping.
Ensure management of excavation activities.
Control activities especially during rainy conditions.
Provide soil erosion control and conservation structures where necessary.
Proper disposal of excavated loose soil.
•To enhance health and safety preparedness among workers.
•Ensure equipment is in good working condition.
•Put up emergency response contracts.
•Put up Emergency Response Procedures notification instructions.
•Put up simple instructions on how to handle fires, products spills LPG incidents, armed robbery and product contaminations.
•Ensure proper waste collection and disposal.
•Provide first aid kit at site.
•Sensitize residents/workers on environmental management.
•Eliminate breeding of mosquitoes.
•Workers should be trained on occupational health and safety and first
Aid administration.
•Train staff on petroleum product handling.
•Sensitize workers on HIV and AIDS.
•Provide Personal Protective Equipment.
•Train workers on personal safety and how to handle equipments and machines.
•A well stocked first aid kit shall be maintained by a qualified personnel
Report any accidents/ incidences and treat and compensate affected workers
Provide sufficient and suitable sanitary conveniences.
Construction activities to be restricted to daytime.
Workers in the vicinity involved in high level noise to wear respective safety and protective gear i.e. earplugs.
•Low noise selection of machinery.
•Enclose the site.
•Use low noise equipment.
•Keep plant equipment well greased.
•Workers to wear ear muffs if working in noisy section.
•Management to ensure that noise from the residents is kept within reasonable levels.
•Use of commercial bill boards to keep construction activities out of sight from the immediate neighborhood.
•Expedition of construction as far as is technically viable so as to minimize adverse visual impact.
•Landscaping and gardening to restore biodiversity and aesthetic property of the project.
Encourage residents to maintain high standards of personal cleanliness; Keep the premises and its environment
(surroundings) clean always.
•Construction debris should be collected by a licensed private contracted waste collection company.
•Excavation waste should be re-used or backfilled.
•Waste generated should be collected by a privately contracted waste collection company and the contractor should ensure the construction of a central waste collection point with bulk storage facilities.
•The site should have waste receptacles with bulk storage facilities at convenient points to prevent littering during occupation.
Proper waste management practices including reduction at source, recycle and re-use of solid wastes; treatment of waste waters prior to release to natural water or land surfaces.
•Proper maintenance of floors to avoid slipping/falls; avoiding fuel spillage.
•Installation of safety communication media such as sign posts and installation of speed limiting pumps for petrol access routes.
•Encourage vehicle owners to ensure proper vehicle maintenance; dispensing low lead fuel.
•Take appropriate soil conservation measures including embankments, runoff breaking systems and proper distribution of culverts.
•Use properly maintained hoses and fittings.
•Make the cement screeds in all the chambers using water proof material.
•Install a monitoring well next to the tanks to check on leaks.
•Use water finding dipstick and/ or a hydrometer to check on density/ specific gravity.
•Ensuring no spills during refilling and/or when offloading the fuel.
•Waste generated should be collected by a privately contracted waste collection company and the contractor should ensure the construction of a central
15th January, 2016 THE KENYA GAZETTE 57 waste collection point with bulk storage facilities. The site should have waste receptacles with bulk storage facilities at convenient points to prevent littering during occupation.
Fire risks
• Fire fighting drills carried out regularly.
•Fire fighting emergency response plan.
•Ensure all firefighting equipment is regularly maintained, serviced and inspected.
•Fire hazard signs and directions to emergency exit route to follow and assembly point in case of any fire incidence.
Occupational health and • Train workers on personal safety and safety risks disaster preparedness.
•A well stocked first aid kit shall be maintained by a qualified personnel.
•Report any accidents / incidences and treat and compensate affected workers.
•Provide sufficient and suitable sanitary conveniences which should be kept clean.
•Conduct Annual Health and Safety
Audits.
Water utility • Avoid unnecessary toilet flushing.
consumption and generation of waste water
• Promptly detect leaking taps and repair them.
•Turn off taps when not in use.
•Install water conserving taps that turn of immediately when water is not in use.
•Install a discharge water meter in the premises to check on total water use and for billing purposes.
•Use special tool to do skimming.
•Install spill control kit next to the oil interceptor during skimming.
Waste water generation • Waste water should empty to the septic tank via well laid sewage pipes Conduct inspections for sewer pipe blockages or damages and fix them.
•Empty septic tank whenever its full by a licensed exhauster services.
Over-use of electrical • Erect a meter in the premises to check power on total kilowatts used and for billing purposes.
•Apply for connection from Kenya
Power Switch off light that are not in use.
•Use of energy conserving bulbs/tubes.
•Use of natural light for lighting purposes
Use natural ventilation from windows and doors and avoid using Air Con that use electricity.
•Provide a standby generator in the premises in cases power goes out Switch off lights in the offices at night.
The full report of the proposed project is available for inspection during working hours at:
(a)Director-General, NEMA, Popo Road, off Mombasa Road, P.O. Box 67839-00200, Nairobi.
(b)Principal Secretary, Ministry of Environment and Mineral
Resources, NHIF Building, Community, P.O. Box 30126-
00100, Nairobi.
(c)County Director of Environment, Kisii County.
The National Environment Management Authority invites members of the public to submit oral or written comments within thirty (30) days from the date of publication of this notice to the
Director-General, NEMA, to assist the Authority in the decision making process of the plan.
GEOFFREY WAHUNGU, Director-General, MR/8448733
National Environment Management Authority.
Dated the 23rd December, 2016.
FRED SWALAH,
for Director of Physical Planning.
Extracted Entities (1)
previous_gazette_ref
147
Details
- Act / Legislation
- THE PHYSICAL PLANNING ACT
- Reference
- Cap. 286
- Signed By
- FRED SWALAH
- Title
- for Director of Physical Planning
- Ministry
- Ministry of Environment And Mineral
- Date Signed
- 23rd December 2016
- Page
- 37
- Extraction Method
- regex
Source Gazette
Vol. CXVIII No. 4
Published 5th January 2016