Back
COMPLETION OF DEVELOPMENT PLAN 90% confidence via regex

GAZETTE NOTICE NO. 1843

GAZETTE NOTICE NO. 1843

THE PHYSICAL PLANNING ACT

(Cap. 286)

COMPLETION OF DEVELOPMENT PLAN


NOTICE is given that preparation of the above-mentioned part development plan was on 19th February, 2016, completed. The part development plan relate to land situated in Bomet Township. Copies of the part development plan has been deposited for public inspection at the Department of Lands, Housing and Urban Development in Bomet and the County Physical Planning Office, Bomet. The copies so deposited are available for inspection free of charge by all persons interested at the Department of Lands, Housing and Urban Development in Bomet and the County Physical Planning Office, Bomet, between the hours of 8.00 am. to 5.00 p.m., Monday to Friday. Any interested person who wishes to make any representation in connection with or objection to the above-named part development plan may send such representations or objections in writing to be received by the County Physical Planning Office, Bcmet, P.O. Box 285-20400, Bomet, within sixty (60) days from the date of publication of this notice and such representation or objection shall state the grounds on which it is made. Dated the 25th February, 2016. S. KERUBO. MR/8808087 for Director of Physical Planning. GAZErI'ENOTICENO. 1844 THE PHYSICAL PLANNING ACT (Cap. 286) COMPLETION OF PART DEVELOPMENT PLAN (PDP No. 29712012101-Proposed Alovera Farm, Flabaswein Sub- county, Wajir County NOTICE is given that preparation of the above-mentioned part development plan was on 18th December, 2012, completed. The part development plan relates to land situated at Habaswein Town within Habaswein Sub-county. Copies of the part development plan have beer, deposited for public inspection at the office of the County Physical Planning Officer, Wajir, Deputy County Commissioner, Habaswein and Sub-county Administrator's office. The copies so deposited are available for inspection free of charge by all persons interested at the office of the County Physical Planning Officer, Wajir, Deputy County Commissioner, Habaswein and Sub- county Administrator's office, between the hours of 8.00 a.m. to 5.00 p.m., Monday to Friday. Any interested person who wishes to make any representation in connection with or objection to the above-named part development plan may send such representations or objections is, writing to be received by the County Physical Planning Officer, P.O. Box 365, Wajir, within sixty (60) days from the date of publication of this notice and such representation or objection shall state the grounds on which it is made. Dated the 29th June, 2015. E. N. MUCHERU, MR/8808026 for Director of Physical Planning. GAZETrE NOTICE NO. 1845 THE PHYSICAL PLANNING ACT (Cap. 286) COMPLETION OF DEVELOPMENT PLANS Township/Centre Title/Purpose D-P/PDP Ref No. Date Completed Kiriogo Local Physical Development Plan NYA.C2356/1 5/01 11th May, 2015 Captain Local Physical Development Plan NYA/C1 187/015/01 17th December, 2015 Mikaro Local Physical Development Plan (Revised) NYA/C 1001/2014/1 6th October, 2014 Geta Local Physical Development Plan (Revised) NYA/C 1129/15/1 21st October, 2015 Ndunyu Njeru Proposed formalization of existing A.T.P.C.E.A Church NYA/C930/1 5/01 17th December, 2015 Gathara Proposed Site for Prison formalization of existing site for Government Staff Quarters NYA/C952/015/01 17th December, 2015 18th March, 2016 THE KENYA GAZETTE 1033 Township/Centre Title/Purpose D-P/PDP Ref No. Date Completed formalization of existing site for Tulaga Secondary School Ol'Kalou Proposed formalization of existing site for NYA/C 160/015/03 11th September, 2015 National Cereals and Produce Board (NCPB) Proposed formalization of existing sites for: NYA/C 160/015/04 17th December, 2015 Divisional Police Headquarters Chief's office - O1'Kalou Ol'Kalou Town offices Proposed formalization of existing sites for: County Police (headquarters) NYA/Cl 60/015/05 14th December, 2015 Police staff quarters ______________ Propose regularization of Ol'Kalou Stadium NYA/C 160/015/06 18th December, 2015 The local physical development plans and part development Plans relate to land situated in -various townships as indicated in the table above. Copies of the plans as prepared have been deposited for public inspection at the County Physical Planning Office (Nyahururu), respective Sub- County Office and respective Chief's offices the plans relate to. The copies of the plans so deposited are available for inspection free of charge by all persons interested at the above mentioned offices between the hours of 8.00 a.m and 5.00 p.m. Monday to Friday. - Any intere:ted person who wishes to make any representation in connection with or objection to the above development plans may send such representations or objections in writing to be received by the County Physical Planning Officer, P.O. Box 1135, Nyahururu not later than sixty (60) days from the (late of this notice and any such representations or objections shall state the grounds on which it is made. Dated the 18th January, 2016. MR18808077 GAZETI-ENOT]CENO. 1846 THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT (No. 8 of 1999) THE NATIONAL ENVIRONMENT MANAGEMENT AUTHORITY ENVIRONMENTAL IMPACT ASSESSMENT STUDY REPORT FOR THE PROPOSED REHABILITATION OF ISEBANIA- MUKUYU—AHERO (Al) ROAD IN MIGORI,KISII, HOMA BAY AND KISUMU COUNTIES INVITATION OF PUBLIC COMMENTS PURSUANT to regulation 21 of the Environmental Management and Co-ordination (Impact Assessment and Audit) Regulations, 2003, the National Environment Management Authority (NEMA) has received an Environmental Impact Assessment Study Report for the above proposed project. The proponent, Kenya National Highways Authority, is proposing a Rehabilitation of Isebania—Mukuyu—Ahero (Al) Road, in Migori, Kisii, Homa Bay and Kisumu counties. The project will involve rehabilitation of an existing 167 kilometers (km) Road from Ahero through Kish to Isebania. The proposed road traverses four counties namely: Migori, Kisii, Homa Bay and Kisumu and touches the peripheries of Kericho and Nyamira counties, It starts at Ahero junction on BI road then moves southerly via Katito, Onyuongo, and Nyabondo to Sondu to Oyugis where it meets C26. From Oyugis, it moves via Morocho and Nyamataro meeting the B3 road within Kisii town. From here, it changes direction via Suneka, Kamagambo, Rongo, Awendo, Uriri, and Kakrao near Mukuyu, Migori, and Isebania and terminates at the border at Nyabikaye. The Mukuyu- Kisii—Ahero section is a 149 km long single carriageway. Its average width is 4.5m and varying shoulder of 0.5-1.5m wide, built to bituminous standard in 1969. It now has exceeded its design life of 20- 25 years. The rest of the stretch, about 18 km long from Mukuyu to Isebania had been improved-to 7m wide carriageway with 1-1.5m wide shoulders is in better condition but scheduled for the rehabilitation. - The following are the anticipated impacts and proposed mitigation measures: Identified Impacts Proposed Mitigation Climate Change Proposed designs provide for concrete culverts and ensure that the detailed drainage designs accommodates the projected Climate Change predictions. Plant trees along the road corridor. Air quality • ..Use of Personal Protective Equipment (PPE) by workers and all visitors to the site. MARTIN W. MURIUKJ, for Director ofPhysical Planning. Noise generation and • Contractor to agree noise limits/ noise vibrations control stations with NEMA and obtain a Construction Noise Permit prior to the commencement of construction work. • Positioning Powered Mechanical Equipment (PME) so that noise is directed away from sensitive areas. • Contractor to prepare for approval by KENHA a Health Management Plan (HMP) detailing means to protect site workers and community from excessive noise and vibrations. • Construction activities to be scheduled carefully to minimize the impact of noise from construction machinery. Night time's uses of certain noisy machines, such as - pile drivers and concrete vibrators, will be regulated. Spçcial care to be taken when construction is taking place near sensitive receptors such as schools and hospitals. • The location and operation of asphalt batch plants to be sited far from sensitive receptors, such as shopping centers, health facilities and learning institutions • To the extent possible, heavy vehicles should not be used at night across populated areas especially in towns and settlement areas. - • Ensure that construction equipment is operating optimally and with operational noise mufflers. Impacts on water quality Solid/ liquid waste Vegetation loss Regulate working hours to minimize impacts. Installation of noise barriers. Areas dedicated for hazardous material storage shall provide spill containment and facilitate clean up through measures such as: maximum separation from sensitive features (water bodies); clear identification of the materials present; access restricted to authorized personnel and vehicles only and dedicated spill response equipment. Provide solid and liquid waste disposal system - a waste collector, NEMA recommended waste disposal manual and a waste collection bin for each housing unit, workshop, plant, structural shelter. • Acquire all the relevant licenses prior to drilling boreholes through an abstraction permit from the Water Resources Management Authority (WRMA), and a license from NEMA. • Explore possibility of sourcing construction water from other sources and not groundwater, given the high number of permanent rivers in the project area. • Carefully select any permanent water sources, to be handed to the communities upon decommissioning. • The Contractor should consult the community on suitable location for sinking the boreholes. • Provide solid waste disposal system - a waste collector, NEMA recommended waste disposal manual and a waste collection bin for each housing unit, workshop, plant, structural shelter, etc. • Waste disposal site to have stone perimeter wall; 1.5 in high x 7 in long x 5 in wide at a far corner to contain disposed materials from wind and run- off. • Keep records of all disposal/ potential disposal locations. • Hazardous materials to be stored within dedicated areas at work camps and yards in full compliance with regulatory requirements and the contractor to ensure that all waste materials at the point of construction are transported to a place of safe disposal. • Areas dedicated for hazardous material storage to provide spill containment and facilitate -clean up through measures such as: clear identification of the materials present; access restricted to authorized personnel and vehicles only and dedicated spill response equipment • Avoid spillage. • Carry out remediation immediately. • Empty containers to be managed carefully to avoid exposing life to • possible poisoning. •. Replant with original vegetation at the completion of the construction phase • Construction activities will be localized to specific site thus minimizing vegetation loss. • Keep land clearance to a minimum and wherever possible avoid clearing areas of highly erodible soils and steep slopes which are prone to erosion. • Avoid the cutting down of trees as much as can be avoided. • Constantly monitor bridge locations for new ecosystems/habitat development. • Ensure that provision that has been made in the design for bridges, culverts, cut-off drains and side drains to improve drainage is adhered to. Relocation impact . Identify and Consult project affected persons and compensate them as per the • - laid down policies. • Consult the Project Affected Persons (PAP's) on, and offer choices among technically and economically feasible resettlement alternatives. • Land acquisition to be done before the contractor goes to site. • Compensate those affected according to the laid down policies in collaboration with the Ministry of Lands. • Implement an institutional structure or a mechanism for monitoring and evaluating the compensation/ resettlement process. Change of • Need to landscape the material landscape/visual sites/borrow areas and quarries after use intrusion to blend with the landscape as far as are reasonably possible. • Spoil materials including solid waste produced at camping sites for road construction crews should be properly disposed. • Proponent to set I standards on advertising bodies on the need to observe road safety especially on the visual intrusion. • Ensure that solid waste materials are properly disposed to suitable locations through awareness creation. Occupational health and • Draft and operational manuals in line Safety of construction with OSHA for approval by the workers (OHS) and the proponent. communities along the,. Posting of clear and prominent warning corridor signage at appropriate potential points of entry to hazardous areas. • Keep verifiable records of all accidents and incidences. • Draft operational policies on safety e.g. Alcohol use, speed limits. • Spread awareness to curb vandalism of safety equipment and other installations. • Installation of barriers like fences around active sites and other locations to prevent access to facilities by unauthorized'jiersons. • HI V/AIDS awareness and prevention campaigns and provision of condoms for road crews and adjacent communities. • Establish Health clinics (VCT Centres) along the road with special attention to dangers of HIV/AIDS. • Enlighten personnel and community about Malaria and use of mosquito nets including proper hygiene and sanitation, - Proper disposal of containers and other wastes that may act as mosquito breeding grounds. 18th March, 2016 • Full clean-up costs should be incorporated into BOQ. • Introduction of measures that intercept transmission of dust and other air pollutants likely to be generated to sensitive receptors when it cannot be entirely avoided. • Vehicles and construction machinery to be properly maintained and to comply with relevant emission standards. • Construction activities to be scheduled carefully to minimize the impact of noise from construction machinery. Night time's uses of certain noisy machines, such as pile drivers and concrete vibrators, to be regulated. Labour disputes Employing as many people as possible from the locality especially unskilled workforce will help them accept skilled labour from outside. This will promote cohesion and the spirit of the project. Strict adherence to OSHA standards that prohibit child labour. Contractor to work hand-in-hand with local leadership which may report on child labour and any work related grievances. Services interruption Design to provide for utility ducts especially in the towns and trading Centers for future crossing of utilities. Prepare a Utility Relocation Plan with drawings of the road and the utilities to be affected to facilitate early application for relocation of the utilities. Road safety To reduce accidents, appropriate road signs and road markings to be put in place to warn drivers of safety hazards especially while approaching bends, junctions, bridges, animal crossings, schools and shopping centres. • To reduce the possibility of vehicle and animals collisions vehicle speeds shall not exceed posted speed limits and animal crossing warning signs shall be installed where appropriate. • Training of boda boda riders on traffic regulations. • Keep surveillance on roadside markets who encroach on the roads and interrupt visibility. Service interruptions Prepare a Utility Relocation Plan with drawings of the road and the utilities to be affected to facilitate early application for relocation of the utilities. Design to provide for utility ducts especially in the towns and trading centers for future crossing of utilities. Cultural impacts -- Set up a cultural board within the county or other administrative level to safeguard and promote local cultural heritage like music, dance, folklore, artifacts. The full report of the proposed project is available for inspection during working hours at: Director-General, NEMA, Popo Road, off Mombasa Road, P.O. Box 67839-00200, Nairobi. Principal Secretary, Ministry of Environment and Mineral Resources, N.H.I.F. Building, Community, P.O. Box 30126- 00100, Nairobi. County Director of Environment, Kish County. County Director of Environment, Migori County. • (e) County Director of Environment, Homa Bay County. (f) County Director of Environment, Kisumu County. The National Environment Management Authority invites members of the public to submit oral or written comments within thirty (30) days from the date of publication of this notice to the Director-General, NEMA, to assist the Authority in the decision making process of the plan. GEOFFREY WAHUNGU, - Director-General, MR/8808134 National Environment Management Authority.

Dated the 25th February, 2016.

S. KERUBO.,

Extracted Entities (1)

previous_gazette_ref

1843

Details

Act / Legislation
THE PHYSICAL PLANNING ACT
Reference
Cap. 286
Signed By
S. KERUBO.
Date Signed
25th February 2016
Page
36
Extraction Method
regex