Back
REGULATION
100% confidence
via regex
GAZETTE NOTICE NO. 1847
GAZETTE NOTICE NO. 1847
THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
(No. 8 of 1999)
REGULATION
PURSUANT to regulation 21 of the Environmental Management and Co-ordination (Impact Assessment and Audit) Regulations, 2003, the National Environment Management Authority (NEMA) has received an Environmental Impact Assessment Study Report for the above proposed project. -
The proponent, Vipingo Development Limited, proposes to undertake Phase I development that will see the construction of high quality reliable, cost effective and sustainable state of the art infrastructure. The proposed infrastructure is anchored on providing the most cost effective facilities and utilities in the area to ensure smooth running of activities in an urban environment with access to good roads, clean safe water, reliable electricity and high quality telecommunication services among others.
The total project area for Phase I measures about 900 acres of land.
The design for the proposed Infrastructure development for Phase I of
Vipingo mixed use development provides for the construction of various infrastructure aspects; road works, foot paths, culverts and drainage, road furniture, electrical installations, duct works (electrical) and Water reticulation.
The project is located along the Kenyan coastline, 30 kilometers
(km) from the Port of Mombasa and Moi International Airport
Mombasa, connected to the Mombasa—Malindi Highway and 40 km to the proposed Government Mariakani Logistics Hub. The site is strategically located between growing Mtwapa and Kilifi towns interconnected to the port of Mombasa, Mombasa Airport and
LAPSSET Project.
The following are the anticipated impacts and proposed mitigation measures:
Impact Proposed Mitigation Measure
Noise and vibration • Implement both' engineering and administrative controls for machines and equipment to reduce noise pollution at the site.
• Fitting noise machines with noise reduction devices.
• Educating all workers on importance of making correct use of PPE.
• Comply to Noise and Excessive
Vibrations Regulations, 2009.
Dust generation • Sprinkling of water at the site and access roads during dry conditions to suppress fugitive dust.
• Formulate a comprehensive security plan and implement it. Contract a reputable security firm to be in charge of security at the site.
• Liaise with the neighbours and the local administration in security management.
Traffic congestion • Transport of materials during the traffic off peak hours to avoid possible traffic congestion.
• Purchasing of material according to the demand.
• Ensuring minimal residence period for trucks mobilizing material on Site, • Proper planning during construction period.
Emergency preparedness. Design suitable documented emergency and evacuation - preparedness and evacuation procedures procedures to be used during any emergency.
The full report of the proposed project is available for inspection during working hours at:
Director-General, NEMA, Popo Road, off Mombasa Road, P.O. Box 67839-00200, Nairobi.
Principal Secretary, Ministry of Environment and Mineral
Resources, N.H.I.F. Building, Community, P.O. Box 30126-
00 100, Nairobi.
- (c) County Director of Environment, Kilifi County.
The National Environment Management Authority invites members of the public to submit oral or written comments within thirty (30) days from the date of publication of this notice to the
Director-General, NEMA, to assist the Authority in the decision making process of the plan. -
GEOFFREY WAHUNGU, MR/8808085 Director-General,
Dated the 18th March, 2016.
GEOFFREY WAHUNGU,
Director-General,.
Extracted Entities (1)
previous_gazette_ref
1847
Details
- Act / Legislation
- THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
- Reference
- No. 8 of 1999
- Signed By
- GEOFFREY WAHUNGU
- Title
- Director-General,
- Ministry
- Ministry of Environment And Mineral
- Date Signed
- 18th March 2016
- Page
- 39
- Extraction Method
- regex
Source Gazette
Vol. CXVIII No. 28
Published 19th January 2016