Back
COMPLETION OF DEVELOPMENT PLAN 100% confidence via regex

GAZETTE NOTICE NO. 10050

GAZETTE NOTICE NO. 10050

THE UNCLAIMED FINANCIAL ASSETS ACT

(No. 40 of 2011)

COMPLETION OF DEVELOPMENT PLAN


NOTICE is issued pursuant to regulation 12 of the Unclaimed Financial Assets Regulations, 2016 that the Unclaimed Financial Assets Authority has received claims for unclaimed assets from the following persons claiming as administrators of the estates of deceased persons. Claimant's Name/Administrator Name of Deceased Holder Ref No. Peter Mwaura and Joyce Njeri Amos Kamau Kimani Barclays Bank of Kenya Ltd. UFAA/BBK/40 Eunice Sewa Peter and Joyce Mbaika Peter Kikemu Peter Sila Kikemu Barclays Bank of Kenya Ltd. UFAA/BBK/18 Further notice is given that unless objection to the claims is lodged at the offices of the Authority at the address below within thirty (30) days from the date hereof, payment will be made to the aforementioned persons pursuant to the Unclaimed Financial Assets Act. Dated this 17th November, 2016. KELLEN E KARIUKI, MR/2483512 Chief Executive Officer. 4795 2nd December, 20/6 THE KENYA GAZETTE GAZETTE NOTICE No 10051 THE PHYSICAL PLANNING AC'T (Cap. 286) COMPLETION OF PART DEVELOPMENT PLAN PDF No. R712016/01 for the Proposed Formalization of the Existing Site for Commercial Pktts, NOTICE is given that the preparation of the above-mentioned develops/et plea wm completed on 10th Anus, 2016. TM proposed part development plan relates to had situated within Nakao Isfunicipality Block 20 (near Shompaumi), Nahum County. Copies of the part development plan have been &poised for public inspection at the offices of the County Director, Land sad Physical Phoning. Nakuru, at Arai House, 3rd Floor. Room I aid . Sub-County Administrator. Nakuru East The copies so:deposited aft available br inspectiee bee of charge by all mesons. interested at the offices of the Crausty Disremer. Lain and Physical Plinniag. Hebei. at Arai House, 3rd Hoar, Room 8 and SidtpCsurty Administrator, Nauss East between the beam of SAO Llat 10 5.00 p.m, Monday to Friday. Any interested person who wishes to male -y nmesematice in connection with or objection to the aborromemed part dereelopmet phis may send such iseesentations or objectiess in webs to be awairAd; by the County Physical Henan* Offices, PO Ron Nakano, wit his sixty OR> days from the date of pillestire of thin notice and such orpresentition or objection *A sate the grounds air ur,Mtla,iuLmtdie., Date& die Zist November. MM. ROBERT TXPRONO M2483022 Pe Comm Secretary. tialtam. GtenrinNerscnNoi 10052 Tfffi PHYSICAL PLANPRNIG ACT (Cap, 2114) COMPLETION oFPALT PLAN EPP NO. R712016✓024tr the Proposed" Foantalitatiom of the Mists* Stator Commercial' Flots. ItIONICIE is. given that the prepansties of the above-mentioned development plea was compered on 24dt iumpst..71Algt. The propose& part development plan seises to hied Sowed Men Nakuru:Municipality Beach 23 (NAKA), Mean County. Copies of the part development Men bare bees deponted fie public • at the offices. of the• Cowry Diendes. Lead and Physical • Nakano. at Arai House. 3rd Hint Room ft and Sun-County Admiaistratos. ?Mum East lbe/ copies so. deposited me available fee ions free of chine by all persons incenses& at the offices of the Coney Oneetve, Land anti Physical amnia & his arm., Ardle be 3rd Hem. Rum and Ws-County woe,. Habeas Fisk between the boars of 8,00m.nu to 5.00 tree, bbniettoTriday. Any interested pest who wishes to ask* any espeematatioe is connestion. with or *Wen to the aboretwarered peat develoyeatat phut may send such repasentations abilities* is wring to be sectived by the County Physical Meanie& Mom ra Nakunt„ wither sixty (fte/ din& been the dam of gultraattime of the. notion and such mpesseetation QC objection, shalt state the nom& ern wItishilis made. Rated the 21st November. 20Lti, ROB! Tammo RUTTO, MR/Z483021 for County Secreezty.Idalatnt- GiarrrnPioncaNe. IAIROZP Tile IK PHYSICAL PLANNING ACT (Afk2sfr), u !1.hiVFlhiRIM DiVELOSMEENT PLAN POr KAW 32029Thinfor the Masa* Residential Pitt No WI (Ktvant)-Ongata Stmgationeeship. NOTICE. it gluon that the above-mentioned past develepasset pleat was. completedon.9th November, 20t6. The part development plan relates to land situated within Ongata Rongal Township. Copies of the part development plan have been deposited for public inspection at the offices of the Governor, Kajiado, County Commissioner, Kajiado, County Executive Member for Lands, Physical Planning. Housing, Environment and Wildlife and the office of the County Physical Planning Officer, Kajiado. The copies an deposited are available for inspection free of charge by all persona interested at the the offices of the Governor, Kajiado, County Commissioner. Kajiado, County Executive Member for Lands, Physical Planning, Housing, Environment and Wildlife and the office of the County Physical Planning Officer, Kajiado between the hours of 8.00 am. to 5.00 p.m., Monday to Friday. Any interested person who wishes to make any representation in connection with or objection to the above-named part development plea may send such representations or objections in writing to be received by the County Physical Planning Officer, P.O. Box 11, Kijisido. within sixty (60) days from the date of publication of this notice and such represeetation or objection shall state the grounds on which it is made. Doled the 9th November, 2016. FRED SWALEH, MR/248189T for Director of Physical Planning. Gann. Ncates NO. 10034 THE PHYSICAL PLANNING ACT (Cap. 286) COMPLETION OF PART DEVELOPMENT PLAN Pik' No. Rill67111016101-for the Existing Sites for Saos Secondary, Save Primary. AJ.C. Church and Dispensary Nana is given that the above-mentioned part development plan was completed on 8th Novi:saber, 2016. The pert development plan relates to land situated within Saos Township. Eldon Ravine Sub-County. Copies of the part development plan have been deposited for public impactive at the offices of the Chief Officer, Lands, Housing and Urban Develapearet. Kabamet, the Sub-County Administrator, Mama Ravine and County Physical Planning Office, Kabamet. The copies an deposited are available for inspection free of charge by all peewee interested at the the offices of the offices of the Chief Officer. Lands. Housing and Urban Development, Kabamet, the Sub- Calmly Admisinnere, lathes Ravine end County Physical Planning Office, Keherser betweet the hours of 8.00 a.m, to 5.00 p.m., Monday 1a. Any intetested pence who wishes to make any representation in comectiva with or objection to the above-named part development plan may send such topresentations or objections in writing to he received by the County Physical Planning Officer, P.O. Box 33- 30400, Kabinet. waits sixty (60) days from the date of publication of this notice sod such reposeniation or objection shall state the grounds en which it is made, Dated) die 8th November. 2016. FRANCKLINE KICHE, MRI2481640 for Director of Physical Planning. GAWMTTE Nvateallo. MSS THE ENVIRONMENTAL MANAGEMENT AND CO.ORDINATION ACT (No 8 41999) THE NATIONAL ENVIRONMENT MANAGEMENT AUTHORITY ENVIRONMENTAL IMPACT ASSESSMENT STUDY REPORT FOR THE PROPOSED KAPTEL TEA FACTORY ON L.R. NO. NAIL /KAMM 1109.1110041 VILLAGE. KAFTEL SUB - LOCATION. KAFTEL LOCATION, NANDI COUNTY It/Yummy/ OF PUMJC COMMtorrs PURSUANT to repetition 21 of the Environmental Management and Coordination (Impact Assessment and Audit) Regulations, 2003, the Natimal Environment Management Authority (NEMA) has received an Environmental Impact Assessment Study Report for the above proposed project. The proponent (DL Group of Companies) is proposing to construct a modem tea factory on a section of L.R. No. Nandi/Kaptel Block 809 situated at Tiriin Village, Kaptel Sub-location, Kaptel Location, Nandi County. The proposed project will entail construction of a single line CTC factory with a provision for future expansion, administration block, parking area, weighbridge, installation of above ground fuel tanks, overhead water tanks and other associated civil works (such as access roads, waste and storm water drains, and water reticulation drainages). The following are the anticipated impacts and proposed mitigation measures: Impact Mitigation Measures Soil and geology • The minimum area required for disturbance construction shall be cleared of vegetation. •Top soil shall not be disturbed more than it is absolutely necessary but not below the first impermeable layer. •A minimum amount of storm water will be allowed to flow on the site and control measures like paving and banding to avoid storm water damage. •Denuded areas shall be landscaped and vegetation re-planted as soon as feasible after construction. Loss of vegetation cover • Re-vegetation to control potential soil loss. •Prevention of soil contamination through oil spills/leaks from construction machinery. •Landscape area with similar vegetations. •Preservation of excavated top-soil for future site restoration procedures particularly in highly disturbed areas. •Limiting vehicular transport to defined roads as to prevent unnecessary injury to vegetation and habitat destruction. •Implementing good housekeeping practices on site and implementing a Solid Waste Management plan in order to eliminate any source of hazard to the native fauna. •Ensure proper demarcation and delineation of the project area to be affected by construction works. •Utilize appropriately clearing techniques (e.g. hand clearing as opposed to mechanized clearing) by using human labour as opposed to heavy machinery. •Minimize clearing and distribution to riparian vegetation. Biodiversity loss • Generally, the following should be considered during construction. •Design with a view to incorporating nature conservation into the development including appropriate friendly boundary fencing. •Retain existing habitats where possible and aim to keep natural site features in context rather than in isolated fragments. Pay attention to field boundaries and hedgerows and preserve wildlife corridors and habitat links. Consider integrating ecological features, for example climbing plants and bird nest boxes, within any buildings or structures. •Routine checking of trenches (if any) and escape routes to minimize, if not prevent, entrapment of fauna. •Reporting of any violation relating to hunting and trading activities. •Minimizing the removal off-site of any soils containing invasive species. •Compliance with the ecological requirements of the project and any other legal requirements with regard to waste management, environmental pollution, discharge to waters among others. •Replacement of lost habitat throughout the site or in other areas, where possible. •Ensure that landscape design reflects local ecology and uses locally sourced plants wherever possible. Native trees and shrubs should be used for landscaping where practical. Soil erosion • Any construction materials should be screened or covered to prevent off-site movement and the surplus materials should be removed from the site to an approved disposal site. •Striping of vegetation should be limited to areas where civil works will be undertaken. •Beaming of the open trenches should be undertaken to prevent them from being washed away by runoff . •Sensitization of workers on environmental protection. •Soils excavated from the tower pad area shall be used for backfilling. •Soils shall not be left exposed to wind /water for long. Noise pollution and • The contractor to inform neighbours vibration two weeks prior to the commencement of construction activities for early preparedness. •Construction activities shall only be undertaken during daytime. •To obtain approvals where night works are to be done from relevant authority. •The contractor should use modem equipments which produces the least noise. The use of noise shielding screens should be used and the operation of such machinery restricted to when it is actually required. •Construction activities must abide by the national Noise regulations gazetted by NEMA. •The contractor will endeavor to comply with the noise control regulations of 2006. •Only serviceable machinery and equipments shall be used. •Employees using equipments shall be provided with ear muffs. 2nd December, 2016 THE KENYA GAZETTE 4797 •Noise reduction /hearing protection devices when working with noisy equipment. •Use serviceable equipment with low noise emission. •Instruct truck and machinery operators to avoid raving of engines. Solid waste management • Clearing of bushes/vegetation, excavation and cutting should be restricted within the project area. •All solid wastes should be collected at central location for temporary storage until removal to an appropriate disposal site. •Waste generated at the site should be sorted by the contractor and disposed of in a suitable manner into different waste streams. •As provided for by the Building Code, a temporary latrine will be provided on site to be used by construction workers. •Receptacles will be provided for waste storage prior to collection. •Resource recovery will be encouraged once the project takes off so as to shrink waste stream and recover non- recyclables. •Refuse collection vehicles will be covered to prevent scatter of wastes by wind. •Wastes will be collected by a licensed operator to avoid illegal final dumping at unauthorized sites. Occupational, health and • Comply with relevant legislations safety during construction. •Develop and implement measures to minimize risks and injuries to the public during construction phase. •The contractor must provide and maintain personal protective equipment and facilities to employees engaged in construction activities. •The contractor shall provide a standard First Aid kit at the site office, just in case minor injuries. •All workers will be sensitized before construction begins, on how to control accidents related to construction. •Accordingly, adherence to safety procedures will be enforced. •All workers to wear protective gear (PPEs) during construction. . •Undertake Job Risk Assessment Review at each task. •Carry out Tool Box Meetings daily; and •Construction work will be limited to daytime only. Air pollution • Appropriate mitigation measures to be implemented - such as wetting down, as well as the erection of shade netting screens, to prevent off-site movement of dusts may be required. •All areas disturbed during the construction of the factory must be re- vegetated. •Sensitization of workers on environmental protection and safety. •Control speed of construction vehicles. •Prohibit idling of vehicles. •Water shall be spraying during the construction phase on excavated areas to reduce dust emission. •Regular maintenance of plant and equipment. •Provision of dust masks for use while working — in dusty conditions. •Use of serviceable vehicles and machinery to avoid excessive smoke emission. Pollution of water • Reduce wastewater production. resources • Recycle the wastewater (where practical). •Reuse the wastewater (generally after treatment) for a beneficial purpose (either onsite or on a neighbouring property) such as dust suppression. •Treat and discharge safely. •Treat and discharge wastewater to soakage or lined evaporation pit (where practical) Treat and discharge to drains or watercourses, meeting values. •Obtain a water abstraction permit from WRMA and implement mandatory seasonal water use limitations in liaison with WRMA. •Rain water harvesting. . •Install of interceptors to pre-treat effluents. •Secure effluent water license from NEMA. •Collection and treatment of contaminated runoff before discharge. •Constant review of the design to ensure that capacity is maintained and where necessary corrective measures are undertaken to address the dynamics; Implementation of an effluent program with the objective of monitoring of ground water and surface rim off quality though a scheduled and regular sampling and analysis program using NEMA accredited laboratories. Energy management and • Enough trees planted for provision of conservation fuel wood. •Local fanners encouraged to plant trees for sale to the factory. •Switching off non operational machines/equipment and lights and using optimum lighting intensity for security and safety purposes. •Routine maintenance of equipment and machines to ensure optimum operations and fuel efficiency. Adopting the use of energy saving lights and machines. •Creation of awareness among users. •Operational efficiency. •Development of key performance indicators. The full report of the proposed project is available for inspection during working hours at: (a)Director-General, NEMA, Popo Road, off Mombasa Road, P.O. Box 67839-00200. Nairobi. (b)Principal Secretary, Ministry of Environment and Natural Resources, N.H.I.F. Building, Community, P.O. Box 30126- 00100, Nairobi. (c)County Director of Environment, Nandi County. The National Environment Management Authority invites members of the public to submit oral or written comments within thirty (30) days from the date of publication of this notice to the Director-General, NEMA, to assist the Authority in the decision making process of the plan. GEOFFREY WAHUNGU, Director-General, MR/2483130 National Environment Management Authority. GAzErrE NOTICE No. 10056 THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT (No. 8 of 1999) THE NATIONAL ENVIRONMENT MANAGEMENT AUTHORITY ENVIRONMENTAL IMPACT ASSESSMENT STUDY REPORT FOR THE PROPOSED WEST KENYA SUGAR COMPANY LTD, ON PLOT L. R. NO. 5740 / 15 & 5740 / 17 AT NATTIRI, AT LUNGAI VILLAGE, ALONG SIKHENDU - NAITIRI ROAD IN BUNGOMA COUNTY INVITATION OF PUBLIC COMMENTS PURSUANT to regulation 21 of the Environmental Management and Co-ordination (Impact Assessment and Audit) Regulations, 2003, the National Environment Management Authority (NEMA) has received an Environmental Impact Assessnient Study Report for the above proposed project. The proponent, West Kenya Sugar Company Limited is proposing to expand its operations by putting up a 2500 TCD (Ton Sugar Cane crushed per day) sugar factory for the purposes of processing sugar cane and producing milled sugar and other related by-products on Plot L.R Nos. 5740/15 and 5740/17 in Lungai Village at Naitiri, Tongues Sub-county in Bungoma County. The expected production capacity for the proposed sugar factory will be around 78,000 tons of brown and mill white sugar. molasses and bagasse by-product. The project will comprise of the cane yard section, mill house, process house, boiler house, spray pond, bagasse holding facility, distillery, bagasse co- production, water treatment facility, parking and administration section, workshop and firefighting section. The following are the anticipated impacts and proposed mitigation measures: Impacts Mitigation Measures Site disturbance • Avoiding the disturbance of areas not within the site for the WESKCOL sugar factory. •Designing and implementing an appropriate landscaping programme to help in vegetating a good part of the area in WESKCOL sugar factory. •Using of appropriate methods for intercepting and slowing water runoff within the construction site. Dust and gaseous • Exposed soils and other erodible emissions materials should be re-vegetated or covered promptly in order to minimize dust emissions. New areas should be cleared and opened-up only when absolutely necessary. Any bare surfaces should be re-vegetated otherwise rendered non-dust forming when inactive. •Loading, transfer and discharge of construction materials should take place with minimum height of fall and be shielded against the wind and consider the use of dust suppression spray systems. •There will be no open burning of construction and/or waste materials at the site. •There will be no excessive idling of construction vehicles in the sites •Construction vehicles and other equipment shall be properly serviced Noise and vibration • Ensuring that noise levels at the nearest sensitive receptor should meet them MICA (Noise and vibration Control Regulations, 2009) •There will be no unnecessary hooting by construction vehicles at the construction site. •Where it is necessary noise emissions should be controlled and minimized through the application of appropriate measures which may include: •Implementation of =closest and cladding of noisy sections, •Installation of proper sound bafflers and/or noise cmtaimmts, with enclosures or curtains at the equipment e.g. crashers, grinders and screens Solid waste • Use of an integrated solid waste management system through a hierarchy of the following options: a) source induction, b) material recycl=g, c) composting and reuse, d) combustion and e) sanitary land filling. •Dispose wane more responsibly by dumping at designated dumping sites or landflls only. •Use building materials that have minimal or no packaging to avoid the generation of excessive packaging waste. •Provide waste collection bias at designated points within the processing plant •Engage NEMA registered waste disposal company for transportation and disposal of solid waste from site. Influx of construction • WESKCOL in partnership with the workers local administration and religious institutions will undertake a skills audit could be undertaken and a register compiled of persons who have skills that could be used by the project. •The WESKCOL recruitment policy should be well communicated to the general public in advance. Health and safety • All personnel should be trained on health and safety procedures and how to respond in case of accidents. All construction workers in the WESKCOL sugar factory should be trained on how to handle unexpected events such as accidents, fires or explosions, chemical spins, floods, power failures and authquakes. To adequately prepare for emergency, all personnel should plea. train, and practice emergency responses. Staff should also be encouraged to prepare for emergencies inside their workplace. As a standard procedure on health and safety, appropriate guidelines and signage shall be put up in prominent places for the attention of all workers. •All personnel should be trained to use of fire extinguishers. The types of fire extinguishers should be supplied based on the types of combustible and flammable materials in the processing plant. •Preparation of emergency response plans specifically applicable to exploration and production activities (considering the geographically isolated nature of mining sites) and including the provision and maintenance of necessary emergency response and rescue equipment. •Encourage the use of preventive measures like condoms. •Avail condom dispensers to the staff and workers. •Strengthen advocacy through awareness training in HIV/AIDS and other STDs. •Provide counseling and testing for HIV/AIDS to all the employees. •WESKCOL will ensure that appropriate washing and screening of all incoming construction machineries originating from other locations in order to avoid the transfer of dangerous invasive species through soil and biological material attachments on construction equipment. •Wherever possible, containment of water collected from areas with potential contaminants will be ensured. Such waste water should be reused. •Oil interceptors and sediment traps should be installed and maintained to ensure any discharge to the environment carries a low sediment load. •Storm water management canals and dams should be maintained and kept clean in order to ensure that the capacity of such systems is not compromised during the life of the operations. •Sensitization of the clients who buy molasses of the environmental effects of the product so as to prevent spillage of the same. •Sensitization of farmers to protect wetlands and other fragile ecosystems including riparian buffer zones as natural filters of farm-based nutrient leakage into streams and rivers. The full report of the proposed project is available for inspection during working hours at: (a)Director-General, NEMA, Popo Road, off Mombasa Road, P.O. Box 67839-00200, Nairobi. (b)Principal Secretary, Ministry of Environment and Natural Resources, N.H.I.F. Building, Community, P.O. Box 30126- 00100, Nairobi. (c)County Director of Environment, Bungoma County. The National Environment • Management Authority invites members of the public to submit oral or written comments within thirty (30) days from the date of publication of this notice to the Director-General, NEMA, to assist the Authority in the decision making process of the plan. MR/2483007 GEOFFREY WAHUNGU, Director-General, National Environment Management.Authority. HIV/AIDS transmission and other social ills Invasive species Waste water Loss of valued ecosystems 2nd December, 2016 THE KENYA GAZETTE 4799 GAM is NoTicE No. 10057 HIGHWAY MOTORS LIMITED DISPOSAL OF UNCOLLECTED GOODS NOTICE is given pursuant to the Disposal of Uncollected Goods Act (Cap. 38) of the laws of Kenya, to the owners of motor vehicle Mercedes Benz KAA 901Y model 123, Nissan Xtrail KAV 347E model T3OZ, Nissan Saloon KAP 036Q model B14 and Toyota Land Cruiser KAR 196T model HJ79, which have' been lying at the premises of Highway Motors Limited workshop, of P.O. Box 444- 00100, Thika to collect them within fourteen (14) days from the date of publication of this notice, upon payment of repairs, storage and other incidental expenses. If the aforesaid properties are not collected at the expiry of this notice, the same will be sold by public auction or private treaty without any further notice. Dated the 23rd November, 2016. P. S. SAHOTA, MR/2481741 Managing Director. -7-

Dated the 23rd November, 2016.

KELLEN E KARIUKI,

Chief Executive Officer.

Extracted Entities (2)

previous_gazette_ref

10050 10051

Details

Act / Legislation
THE UNCLAIMED FINANCIAL ASSETS ACT
Reference
No. 40 of 2011
Signed By
KELLEN E KARIUKI
Title
Chief Executive Officer
Date Signed
23rd November 2016
Page
24
Extraction Method
regex